Laserfiche WebLink
t_t"uonsonaaren Lnlergency Kesponse/Uontingency Plan <br /> H. EARTHQUAKE VULNERABILITY <br /> [donfily areas of the F1101il.that are vulnerable to hazardous nsaterials releases due to seismic motion.These areas lrt uire immediate isolation and inspection. <br /> VULNERABLE.AREAS(Checkup that apply): HI, LOCATIONS{:e.g.,Shop,outdoor+hed.lab); 1t' <br /> E 1.HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS Warehouse <br /> ❑ 2_PROCESS LINES AND PIPING <br /> ❑ 3.LABORATORY <br /> ❑ 4.WASTE TREATMENT AREA <br /> Identify Ina ch allical.r' 5IC1114 VIII1larahIL'to releases/s ills due to all rlht 1 Uuki-Malcd motion.Thesca stemti m ulrr i,nnnediate isolation and intt ecliau, <br /> VULNERABLE SYS'T'EMS AND/OR EQUIPMENT[Check all that apply); 1 LOCATIONS; 114, <br /> E 1.SHELVES,CABINETS AND/OR RACKS Racks in the warehouse <br /> ❑ 2,TANKS AND SHUT-OFF VALVES <br /> ❑ 3.PORTABLE GAS CYLINDERS <br /> ❑ 4.EMERGENCY SHUT-OFF AND/OR UTILITY VALVES <br /> ❑ 5,SPRINKLER SYSTEMS <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane tank) <br /> I. EMPLOYEE TRAINING <br /> Employee training is required rar all employees anfilur contractors hantiding hazardous malorialN and/or hazardous wastes during normal and/or emergency operations. <br /> Most facilities will need to submit a separate Training Plan.However,your CUPA may accept this section as the Training Plan for some small facilities. <br /> Ftnployce training plans may include the following content: <br /> • Applicable laws and regulations; Communication and alarm systems; <br /> • Emergency response plans and procedures; • Personal protective equipment; <br /> • Safety Data Sheets; • Use and maintenance of emergency response equipmorit and supplies <br /> • Hazard communication related to health and safety; (e.g.Fire exdingoishers,respirators,spill control materials); <br /> ■ Methods forsafe,handling of hazardous substances; • Decontamination procedures; <br /> •. Hazards.of majorl-aIs and processes(e.g.,fire,explosion,asphyxiation); • Evacuation procedures and evacuation staging locations; <br /> Hazard mitigation,prevention and abatetnetrl procedures; • Identification of facility areas,equijniletlt,and systems vulnerable to <br /> 11P Coordination of vmcrgency response actions; earthquakes and other natural disasters. <br /> • Notification procedures for local emergency responders,CUPA, <br /> Cal OES,and onsite personnel; • OTHER(Specify); <br /> Check the applicable boxes below to indicate how the employee training program is administered. <br /> ❑1. FORMAL CLASSROOM [:12. VIDEOS Q 3. SAFETY MEETINGS E14, STUDY GUIDES/MANUALS 11. <br /> ❑5. OTHER(Specify): 12 <br /> E36. NOT APPLICABLE SINCE FACILITY HAS NO EMPLOYF,ES <br /> ❑7. CHECK IF A SEPARATE EMPLOYEE TRAINING PLAN IS USED AND UPLOADED TO CERS AS A PDF DOCUMENTt3, <br /> 28. CHECK IF EMPLOYEE TRAIMNfi IS Co VI?RED By THE ABOVE REFEREIVCEI]CONTENT AND pTfIER 1]OCLIMEN7'S ONSITE ta. <br /> EMPLOYEE TRAINING FREQUENCY AND RECORDKEEPiNG TRAINING MUST BE: <br /> ■ Provided initially fol' new employees as soon as possible following the date of hire. New employees should not work In an unsupervised position that involves <br /> hazardous materials handling and/or hazardous waste management without proper training; <br /> ■ Provided within six months from the date of hire for new employees at a large quantity generator; <br /> ■ Ongoing and provided al least annually; <br /> • Amended prior to a change in process or work assignment; <br /> • Given upon modification to the 14morgency ResponselContingency Plan. <br /> Large Quattfity Generator Training:Lmgz quantity generators(1,000 kg ue more)must retain written plan and documentation of emplayee training which includes: <br /> ■A written description ofthe type and amount of both initial and ongoing training that will be given to pclsons filling each job position having responsibility for hazardous <br /> waste managernctlt and/oI,emet'gcticy respo11sc. <br /> • Tho name,job title and job dcscriptinn for each position at the facility related to hazardous waste management. <br /> ■ Ctin'enl employee training records must be retained tultil closure of the Iacdhty and former employee training records must be retained for at least three years after <br /> termination of cmp10ymenI. <br /> Sninil Quantity Genenr;or Training: Small quanlity gcnvrators(less than 1,000 kg) must include basic hazardous waste management and emergency response <br /> procedures but a written emplayce training plan and training rct:ords are not required, in order to show that the facility has met the small quantity generator employee <br /> Iraining requirement,an employee training plan and u'trisling rceords may be Inade available. <br /> Hazardous Materials Business Plan Training:Businesses must provide initial and annual employee training that includes the content referenced above. The training <br /> may be based on thejob position and training records must be made available for a period of nt least three years. <br /> J. LIST.OF ATTACHMENTS <br /> Check one of the following; JI: <br /> ❑ I. NO ATTACI-iMENTS ARF.REQUIRED;or <br /> ❑2. THE FOLLOWING DOCUMENTS ARE ATTACHED: J2 <br /> Rev.03/07117 Page 4 of 4 <br />