Laserfiche WebLink
Nutrient Management Plan Report <br /> General Order No. R5-2007-0035,Attachment C <br /> July 1, 2009 deadline <br /> B. PROCESS WASTEWATER SAMPLING AND ANALYSIS PLAN (CONTINUED) <br /> Minimum data collection requirements <br /> Frequency Sampling Methods Source Field Analytes Lab Analytes <br /> Each application For each pond, a Wastewater Storage Date applied and None required <br /> composite or grab Pond#2 volume(gallons or <br /> sample per the acre-inches)applied <br /> "Approved Sampling <br /> Procedures for <br /> Nutrient and <br /> Groundwater <br /> Monitoring at Existing <br /> Milk Cow Dairies"will <br /> be collected. <br /> Quarterly during one For field Wastewater Storage Date applied and Nitrate-nitrogen (only <br /> application event measurement: Pond#2 electrical conductivity when pond is <br /> For each pond, a aerated), un-ionized <br /> composite or grab ammonia-nitrogen, <br /> sample per the total Kjeldahl nitrogen, <br /> "Approved Sampling total phosphorus,total <br /> Procedures for potassium, and total <br /> Nutrient and dissolved solids <br /> Groundwater <br /> Monitoring at Existing <br /> Milk Cow Dairies"will <br /> be collected. <br /> For laboratory <br /> analyses: <br /> For each pond, a <br /> composite or grab <br /> sample per the <br /> "Approved Sampling <br /> Procedures for <br /> Nutrient and <br /> Groundwater <br /> Monitoring at Existing <br /> Milk Cow Dairies"will <br /> be collected. <br /> C. SOIL SAMPLING AND ANALYSIS PLAN <br /> Minimum data collection requirements <br /> Frequency Sampling Methods Source Field Analytes Lab Analytes <br /> Mello Ranch 127181 E Carter RD I Escalon,CA 95320 San Joaquin County I San Joaquin River Basin <br /> 07/19/2021 14:28:48 Page 17 of 26 <br />