Laserfiche WebLink
Nutrient Management Plan Report <br /> General Order No. R5-2007-0035,Attachment C <br /> July 1, 2009 deadline <br /> C. SOIL SAMPLING AND ANALYSIS PLAN (CONTINUED) <br /> Minimum data collection requirements <br /> Frequency Sampling Methods Source Field Analytes Lab Analytes <br /> Once every five years For each field, a Field 1 - 17 acres None required Soluble phosphorus <br /> for each land composite sample per Field 2-42 acres <br /> application area (may the"Approved Field 3-22 acres <br /> be distributed over a Sampling Procedures <br /> 5-year period by for Nutrient and <br /> sampling 20%of the Groundwater <br /> land application areas Monitoring at Existing <br /> annually) Milk Cow Dairies"will <br /> be collected. <br /> Fall pre-plant for each For each field, a Field 1 - 17 acres None required 0 to 1 foot: Electrical <br /> crop composite sample per Field 2-42 acres conductivity, <br /> the"Approved Field 3-22 acres nitrate-nitrogen, <br /> Sampling Procedures soluble phosphorus, <br /> for Nutrient and potassium, and <br /> Groundwater organic matter <br /> Monitoring at Existing <br /> Milk Cow Dairies"will 1 to 2 feet: <br /> be collected. Nitrate-nitrogen <br /> Spring pre-plant for For each field, a Field 1 - 17 acres None required 0 to 1 foot: <br /> each crop composite sample per Field 2-42 acres Nitrate-nitrogen and <br /> the"Approved Field 3-22 acres organic matter <br /> Sampling Procedures <br /> for Nutrient and 1 to 2 foot: <br /> Groundwater Nitrate-nitrogen <br /> Monitoring at Existing <br /> Milk Cow Dairies"will <br /> be collected. <br /> D. PLANT TISSUE SAMPLING AND ANALYSIS PLAN <br /> Minimum data collection requirements <br /> Frequency Sampling Methods Source Field Analytes Lab Analytes <br /> Each crop harvest For each field and Field 1 -pistachios Date harvested and Percent wet weight of <br /> from each land crop, a composite Field 2-corn/oat total weight(tons)of harvested plant <br /> application area sample per the silage harvested material removed <br /> "Approved Sampling Field 3-pistachios removed from each <br /> Procedures for land application area Laboratory analyses <br /> Nutrient and for total nitrogen,total <br /> Groundwater phosphorus,total <br /> Monitoring at Existing potassium (expressed <br /> Milk Cow Dairies"will on a dry weight basis), <br /> be collected. fixed solids(ash), and <br /> percent moisture <br /> For each field and <br /> crop, a scaled weight <br /> by truckload will be <br /> recorded. <br /> Mello Ranch 127181 E Carter RD I Escalon,CA 95320 San Joaquin County San Joaquin River Basin <br /> 07/19/2021 14:28:48 Page 18 of 26 <br />