CD E
<br /> co o
<br /> EXISTING ROOFTOP UNIT SCHEDULE
<br /> FAN SECTION HEATING SECTION DIFFUSER REGISTER AND GRILLE SCHEDULE D �' OQ�o Mss/ Nq��
<br /> S
<br /> Ro
<br /> UNIT ID MFR. MODEL CONN. SIZE DESCRIPTION NOTESO Wh�Q\� F'L�y�'y
<br /> UNIT COIL AREA SERVED STATUS MANUFACTURER UNIT MODEL SUPPLY OUTDOOR HEAT NOTESLo Ln co 0 m M 38871
<br /> NOMINALTONS NUMBER AIRFLOW AIRFLOW SOURCE SD-1 AES DROP BOX 24x24 18 GAUGE GALVANIZED STEEL CONSTRUCTION, TDC FLANGE FOR DUCT CONNECTION, DOUBLE 1 THRU 5 U p rn rn c:
<br /> (TON) (CFM) (CFM) INDUSTRIES ADB-1-12-4 DEFLECTION DRUM LOUVERS, 4-WAY BLOW PATTERN CONFIGURATION. COORDINATE WITH c: ---) r (D JJ P
<br /> CHA
<br /> AC-1 10 GENERAL SALES REMAIN, CAPPED TRANE YHC120A3RMA003X - - NATURAL GAS - 12.5 TON UNIT HVAC ROOF TOP UNIT SCHEDULE & LATEST FLOOR PLAN DESIGN. PROVIDE DUCT TRANSITION KIT Z Lo Lo > 9TF�F CAV��`ci
<br /> AC-2 10 GENERAL SALES REMAIN, CAPPED TRANE YHC120A3RMA003X - - NATURAL GAS - & ANY OTHER REQUIRED MATERIALS (GASKETS, BAFFELS, DUCTWORK/ETC...) FOR PROPER 0O - - O
<br /> INSTALLATION. REFER TO ASSEMBLY MANUAL FOR INSTALLATION PROCEDURES. Q- }' 0 0 O
<br /> AC-3 10 GENERAL SALES REMAIN,REBALANCED TRANE YHC120A3RMA003X 3,400 2,800 - 1 THRU 4 0 v
<br /> ........................ v CO cfl
<br /> AC-4 10 GENERAL SALES REMAIN,REBALANCED TRANE YHC120A3RMA003X 3,400 2,800 NATURAL GAS 1 THRU 4Lo
<br /> T
<br /> AC-5 12.5 GENERAL SALES REMAIN,REBALANCED TRANE YCD151C3HABB 4,000 3,400 NATURAL GAS 1 THRU 4 SD-2 AES DROP BOX 20x20 18 GAUGE GALVANIZED STEEL CONSTRUCTION, TDC FLANGE FOR DUCT CONNECTION, DOUBLE 1 THRU 5 + +
<br /> AC-6 12.5 GENERAL SALES REMAIN,REBALANCED TRANE YCD151C3HOBA 4,000 3,400 NATURAL GAS 1 THRU 4 INDUSTRIES ADB-1-10-4 DEFLECTION DRUM LOUVERS, 4-WAY BLOW PATTERN CONFIGURATION. COORDINATE WITH L
<br /> 10 TON UNIT HVAC ROOF TOP UNIT SCHEDULE & LATEST FLOOR PLAN DESIGN. PROVIDE DUCT TRANSITION KIT Z
<br /> AC-7 5 GENERAL SALES REMAIN,REBALANCED TRANE YHC063A4RLAOVKF 2,000 1,600 NATURAL GAS 1 THRU 4 � '. U1
<br /> & ANY OTHER REQUIRED MATERIALS (GASKETS, BAFFELS, DUCTWORK/ETC...) FOR PROPER Ln E
<br /> AC-88 12.5 GENERAL SALES REMAIN,REBALANCED TRANE YCD151C3HABB 4,200 2,800 NATURAL GAS 1,2,4 ; _
<br /> AIw Iw 0 ti�
<br /> INSTALLATION. REFER TO ASSEMBLY MANUAL FOR INSTALLATION PROCEDURES. O y
<br /> AC-9 10 OFFICES REMAIN,REBALANCED TRANE YHC120A3RMA003X 3,400 2,800 NATURAL GAS 1,2,4 *0 W j
<br /> U WOcn
<br /> ° o�
<br /> SD-3 AES DROP BOX 14x14 18 GAUGE GALVANIZED STEEL CONSTRUCTION, TDC FLANGE FOR DUCT CONNECTION, DOUBLE 1 THRU 5
<br /> o
<br /> NOTES: INDUSTRIES ADB-1-5-4 DEFLECTION DRUM LOUVERS, 4-WAY BLOW PATTERN CONFIGURATION. COORDINATE WITH - rn
<br /> 1. FOR RTU REQUIRED SCOPE OF WORK SEE KEY NOTES ON MECHANICAL FLOOR PLAN. 5 TON UNIT HVAC ROOF TOP UNIT SCHEDULE & LATEST FLOOR PLAN DESIGN. PROVIDE DUCT TRANSITION KIT 70o N
<br /> 2. PROVIDE MERV-13 FILTERS AND SPARE SET OF MERV-13 FILTERS FOR ALL RTUS. & ANY OTHER REQUIRED MATERIALS (GASKETS, BAFFELS, DUCTWORK/ETC...) FOR PROPER 3:
<br /> 3. PROVIDE SUPPLY DROP BOX. REFER TO SCHEDULE. INSTALLATION. REFER TO ASSEMBLY MANUAL FOR INSTALLATION PROCEDURES. _ r , J c-
<br /> 4.
<br /> 4. LANDLORD RESPONSIBLE FOR PROPERLY OPERATING EXISTING SMOKE DETECTORS (MAIN SUPPLY DUCT MOUNTED. COORDINATE W/ GOVERNING CODES & CODE OFFICIAL). - U L
<br /> LANDLORD SHALL REPLACE EXISTING SMOKE DETECTORS WITH NEW IF REQUIRED. cq
<br /> W
<br /> ALUMINUM, DOUBLE DEFLECTION SUPPLY GRILLE WITH, 3/4" BLADE SPACING, 1,2,4
<br /> SR TITUS S300FL SEE PLANS FRONT BARS PARALLEL TO THE SHORT DIMENSION WITH RADIUS END CAPS TO MATCH DUCT aD
<br /> I T O D
<br /> Q Lo 3:
<br /> o�
<br /> a�
<br /> FAN SCHEDULE = U ��
<br /> 12"x12" FACE 9"x9" MODULE LOUVER FACED SQUARE CEILING DIFFUSER NECK o c
<br /> UNIT ID dANUFACTUREI MODEL SERVICE TYPE DRIVE CFM RPM SP MOTOR INTERLOCK UNIT WEIGHT ACCESSORIES CD TITUS TDCA SEE PLAN SIZE AS SHOWN ON PLANS. 1,2,4 ti 0
<br /> IN. WG. HP VOLTS PHASE LBS
<br /> GEF-1 GREENHECK GB-091-4 BATTERY CHARGING ROOF BELT 720 1,354 0.5 1/4 115 1 RUNS CONTINUOUSLY 58 1 THRU 9 22
<br /> SVF-1,2 FANTECH FR150-5C517 FREEZER SLAB VENTING INLINE DIRECT 230 2,750 0.2 1/10 115 1 RUNS CONTINUOUSLY 10 NOTES
<br /> 1. MAXIMUM NOISE CRITERION RATING < 30
<br /> 2. BAKED ENAMEL FINISH, COLOR TO BE SELECTED BY ARCHITECT.
<br /> NOTES: 4. COORDINATE DROP BOX LOCATION WITH CORRESPOND EXISTING RTU LOCATION.
<br /> 1. RD TO PROVIDE UNIT AND ALL ACCESSORIES. CONTRACTOR RESPONSIBLE TO RECEIVE AND STORE EQUIPMENT, AND COORDINATE INSTALLATION OF ALL COMPONENTS. 5. DROP BOX NECK SIZE SHALL BE IN ACCORDANCE WITH TABLE.
<br /> 2. BURGLAR BARS AT ROOF PENETRATION.
<br /> 3. 14" HIGH PRE-FAB ROOF CURB (SEISMIC RATED IF REQUIRED).
<br /> 4. DISCONNECT SWITCH (WEATHERPROOF AS REQUIRED).
<br /> 5. BACKDRAFT DAMPER.
<br /> 6. ALUMINUM BIRD SCREEN.
<br /> 7. PROVIDE FLEXIBLE CONNECTORS AT DUCT CONNECTION.
<br /> 8. PROVIDE ADAPTER PLATE AT FAN CONNECTION.
<br /> 9. HARDWIRE TO CIRCUIT BREAKER.
<br /> 10. SVF FANS PROVIDE AND INSTALL BY HVAC CONTRACTOR. p
<br /> N
<br /> Lo
<br /> m
<br /> Ile
<br /> U
<br /> Z O
<br /> O z
<br /> Y �
<br /> U
<br /> O z
<br /> U) U Z
<br /> z O
<br /> - 0-
<br /> 17)2
<br /> U
<br /> W W
<br /> W
<br /> U CD
<br /> C)f Q
<br /> Q U)
<br /> Q u)
<br /> W
<br /> Q J
<br /> Z
<br /> O
<br /> } W
<br /> Q co
<br /> w O
<br /> lY �
<br /> � W
<br /> lY �
<br /> � J
<br /> u)
<br /> Z LU
<br /> _O �
<br /> ELECTRIC HEATER SCHEDULE w
<br /> UNIT ID MANUFACTURER MODEL AREA SERVED CFM HEATING DATA ELECTRICAL INTERLOCKED NOTES O Z?
<br /> INPUT KW OUTPUT (MBH) FLA VOLTS PHASE HERTZ WITH z cn
<br /> EUH-1, 2 QMARK 25D233 FUTURE EXPANSION AREA 350 3.0 - - 208 1 60 THERMOSTAT 1 thru 5 z z
<br /> Lu
<br /> EUH-3, 4 QMARK 25D236 RECEIVING AREA 350 5.0 - - 208 1 60 THERMOSTAT 1 thru 5
<br /> O U
<br /> NOTES: C� O
<br /> U 0
<br /> 1. ABOVE LISTED EQUIPMENT PROVIDE AND INSTALL BY HVAC CONTRACTOR. = W
<br /> 2. PROVIDE DISCONNECT SWITCH. Lu _
<br /> 3. PROVIDE TSTAT. (BUILT-IN T'STAT FOR EB)
<br /> 4. PROVIDE MOUNTING HARDWARE.
<br /> 0 U-
<br /> 5. FIELD VERIFY FINAL MOUNTING HEIGHTS. COORDINATE W/ARCHITECT, RESTAURANT DEPOT REPRESENTATIVE, & MFR'S RECOMMENDATIONS. o Lu
<br /> W v)
<br /> W =)
<br /> W o
<br /> = W
<br /> N
<br /> W Orf
<br /> ELECTRIC AIR CURTAIN SCHEDULE Q
<br /> UNIT ID MANUFACTURER MODEL LENGTH AREA SERVED FAN DATA HEATING DATA ELECTRICAL INTERLOCKED WEIGHT NOTES elf
<br /> CFM HP KW INPUTAMP MOCP VOLTS PHASE HERTZ WITH LB W Q
<br /> ACR-1 POWERED AIRE ETA-2-72E 6-0" ENTRY DOORS 2620 (2)3/4 20 27.8 35 208 3 60 THERMOSTAT 177 1 THRU 8
<br /> 2
<br /> NOTES:
<br /> 1. RESTAURANT DEPOT TO PROVIDE "ACR" AND ALL ACCESSORIES. ALL OTHER UNITS BY CONTRACTOR. CONTRACTOR RESPONSIBLE
<br /> TO RECEIVE AND STORE EQUIPMENT, AND COORDINATE INSTALLATION OF ALL COMPONENTS.
<br /> 2. FIELD VERIFY FINAL MOUNTING HEIGHTS. COORDINATE W/ARCHITECT, RESTAURANT DEPOT REPRESENTATIVE, & MFR'S RECOMMENDATIONS.
<br /> 3. TRANSFORMER AND CONTACT SWITCH FOR OPERATION WITH BI-PARTING OR OVERHEAD DOOR BY MANUFACTURER.
<br /> 4. UNIT MOUNT HIGH/LOW SWITCH BY MANUFACTURER.
<br /> 5. REMOTE MOUNTED HIGH/OFF/LOW SELECTOR SWITCHES BY MANUFACTURER
<br /> 6. UNIT MOUNTED DISCONNECTS BY MANUFACTURER.
<br /> 7. MAGNETIC DOOR SWITCHES BY MANUFACTURER.
<br /> 8. 1/2" RE-CLEANABLE FILTERS BY MANUFACTURER.
<br /> REVISIONS
<br /> o
<br /> ui
<br /> z
<br /> o 2E�
<br /> o
<br /> u.l u U
<br /> d }
<br /> U
<br /> H U) U
<br /> 0 0
<br /> W N N
<br /> Q o
<br /> 0 ` N
<br /> zm N M V Lo CO ti 00 m
<br /> MECHANICAL
<br /> SCHEDULES
<br /> FOR PERMIT DATE: 11/06/2020
<br /> JOB NO. 20263
<br /> M -3 . 0
<br /> Li SHEET NO.
<br />
|