Laserfiche WebLink
co E <br /> co o <br /> N <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 v QpF ESSIO/V <br /> X � pM R OSF�L`�yc> <br /> � LO 00 U ? M 38871ID <br /> U ) Cn E * �* <br /> Z >, q� OHA 0- o� <br /> o FOF CA��F <br /> I 13 I (DQ) 0 0 c-? <br /> DUCT DROPE] -0 0 (.0Cfl <br /> — — — — — — — — — — — — <br /> T 1 OJ <br /> EUH-1 O~ E3H <br /> 12 2 12 001] 1 Ln >- Z -E <br /> FTz <br /> ]EH <br /> I I � I I I - I I � O O � I HALL I � 1 I 1 � • � �z • <br /> HALL OFFICE OFFICE ELECTRICAL MENS ED OMENS JANIT R/ - I Ln . w _ <br /> FUTURE . 0 ti <br /> EXPANSION I ROOM OIV� STORAGE I o O Lu vi — o <br /> -00 <br /> AREA 15 I I tj � GEF 1 %O 0� W N 7 �'t <br /> T k I I LJ ° I 1 EUH-3 O I U Lu ID' = L— o <br /> O <br /> I EUH-2 EU]t] CD CD I RECEIVING 1 = �/�^ O 0 <br /> 1 AC-9 CORRIDOR V J o X N <br /> E4H 12 T I U co w E <br /> `Ir- - EUH-4 I M cu <br /> II i ~ Q� � <br /> I Lo 3: <br /> U Q� <br /> M0 N <br /> O � <br /> fi Io <br /> —ED <br /> rr <br /> 15 11 1 I <br /> I I I I I I I I 11 I I I 1 I I <br /> o I I <br /> 1 Il Il I I <br /> (3 0 CFM) AC-2 I I <br /> I <br /> 1 (1,600 C ) 5 I — — (�,8 0 F ) 5 1 Il I II 10T 1 2 I 1 1 1 I <br /> ADJACENT FUTURE _ _ _ — _ _ ———_— _ _ _ _ <br /> MIETAL EXPANSION r L— 4 I y l II X I I o <br /> BUILDING y I I I I I I IN <br /> -VACANT - _ A -7 __ - J - 1 I rn <br /> T 4 J2 -4 gp I I Q <br /> I SD- I 4,,250 CFM 12.5T p I 0 CFM 1 T I II I 3 I I 1 I U <br /> - - - - - - - - - - - - - - - - I L -0 01Z (7 <br /> 2,0 CF <br /> z <br /> 15 I CFM) I I I 11 AC 1 2 I EQUIPMENT ON THE z <br /> 2,8 0 F ) 5 II 10T GRADE BY OTHERS C/� z O <br /> \ I 4 15 I II p X I cn ZD <br /> I \ I Il I U o <br /> _ — — — — — — — — — —q —T I- — — w <br /> SD-1 S -2 C 3 <br /> 4,250 CFM AC-5 D 3, 0 CFM 10 ( O HEA )SD II 3 j I U <br /> 12.5T Il I I Q <br /> Q <br /> I I II Il I i LuQ <br /> I <br /> FREEZER 11 I I p <br /> o ZDLU <br /> I I < m <br /> II 1 I O <br /> El E__1C Il — — — <br /> I I 12.5T i t I 11 I j O wU <br /> � I I <br /> I II X <br /> I i I cf) w <br /> v Li LiII I1 i L cn <br /> 11 I I I 1 I z z <br /> C/) <br /> ElI I I I z w GENERAL SALES 11 I Lu <br /> ISI ISI Il I z ZD <br /> 0 <br /> UPPER ROOF i N i i N l II O OQ <br /> LOWER ROOF 16 II 1 z w <br /> Lujun 1, ZD = <br /> AI 0 20To 20 "(� 0 LL <br /> I I I I Op LLI <br /> CO <br /> SR 24x10 SR 24x10 SR 24x10 S 2400 SR 24x 0 Cw :D <br /> 775 CFM 800 CFM -� 800 CFM -� 8 0 C M 77 CF LLQ o <br /> i I UJN <br /> I ` I COOLER ui I z O <br /> 1 1 ICE K K KIK KIK J = <br /> 1 CD 8,0 MERCHANDISER 15 / Of Q <br /> 8"0 8"PJ 125 FM o 0 0 <br /> W <br /> $'0ZD <br /> MANAGER/ <br /> I - CAS H12s __ _�iAsslTANT' I I T I Q <br /> ROOM — <br /> — � 2 <br /> FOR ACR-3 o <br /> I 1 ACR <br /> 2 7 MOUNT @ 1 <br /> 1 I 1 6-0"AFF I I <br /> I I <br /> L----- -- -------- ------------ ------ <br /> -- -- ------- ------------ ------ <br /> I I I I I I I I I I I I <br /> I <br /> REVISIONS <br /> MECHANICAL FLOOR PLAN <br /> 1 3/32"=1'-0" <br /> GENERAL NOTES: KEY NOTES: Fxl <br /> 1. VERIFY ALL EXISTING RTU LOCATION AND RTU CONDITIONS BEFORE STARTING 1❑ EXISTING ROOF TOP UNITS TO REMAIN. LANDLORD RESPONSIBLE ❑8. MECHANICAL CONTRACTOR SHALL COORDINATE THE SHUT OFF 16. TERMINATE RETURN DUCT OPENING WITH FRAMED WIRE MESH <br /> NEW WORK. FOR PROPERLY OPERATING EXISTING RTUS. LANDLORD SHALL OF GAS TO EXISTING UNITS WITH PLUMBING CONTRACTOR. SCREEN (WMS). z <br /> FIELD VERIFY, DOCUMENT AND REPORT ANY DAMAGED OR NOT 2E <br /> 2. INSPECT THE CONDITION OF ALL EXISTING RTUS.ALL DAMAGED OR NOT PROPERLY WORKING EXISTING RTU PARTS, CONTROLS AND �9 TERMINATE DUCT AT 8'-0"AFF WITH FRAMED 1/2"X1/2"WIRE MESH 0 2i <br /> PROPERLY WORKING PART SHALL BE REPLACED. THERMOSTATS. LANDLORD SHALL REPLACE THOSE PARTS WITH SCREEN (WMS). COORDINATE WITH RESTAURANT DEPOT w o 0 <br /> NEW (TYPICAL). REPRESENTATIVE AND ARCHITECT. <br /> 3. ALL EXISTING DUCTWORK SHALL BE REMOVED EXCEPT DUCTS ROOF ~ � U <br /> PENETRATIONS. �2 EXISTING ROOF TOP UNITS TO REMAIN (TYPICAL). 10. PLUMBING CONTRACTOR TO INSTALL SLAB VENT PERFORATED <br /> PVC PIPING. REFER TO PLUMBING DRAWINGS FOR PIPING LAYOUT ui N oN <br /> 313. CAP SUPPLY AND RETURN RTU OUTLETS AT ROOF AS REQUIRED AND FAN INSTALLATION. COORDINATE EXACT FAN LOCATIONS `O <br /> 4. COORDINATE NEW HVAC SYSTEM INSTALLATION WITH EXISTING BUILDING Q - o <br /> CONDITIONS. (TYPICAL). WITH P.C. AND RESTAURANT DEPOT/ FREEZER MFGR'S N <br /> REPRESENTATIVE. <br /> 5. ALL EXISTING AND NEW DUCTWORK LAYOUTS ARE DIAGRAMMATIC AND � NEW DROP BOX DIFFUSER WITH DOUBLE DEFLECTION DRUM 4t � N M v � co � w � o <br /> LOUVERS. CONNECT DROP BOX WITH NEW SUPPLY DUCT UP TO 11. FOR CONDENSATE PIPING SEE PLUMBING DRAWINGS (TYPICAL). <br /> INTEND TO SHOW A GENERAL ARRANGEMENT AND POINT OF CONNECTION. EXISTING SUPPLY DUCT. PROVIDE NECESSARY DUCT TRANSITION <br /> ALL ELEVATIONS AND OFFSETS ARE NOT NECESSARILY SHOWN.CONTRACTOR (TYPICAL). 12. INSTALL NEW ELECTRIC UNIT HEATER ACCORDING TO MECHANICAL PLAN <br /> SHALL COORDINATE THE NEW WORK WITH ALL EXISTING BUILDING SYSTEMS. MANUFACTURER REQUIREMENTS (TYPICAL). <br /> PROVIDE NECESSARY OFFSETS;AVOID CONFLICT WITH OTHER EXISTING F51PROVIDE NEW FULL SIZE FRAMED WIRE MECH SCREEN ON POWER PLAN <br /> SYSTEMS AND BUILDING STRUCTURES. T RETURN DUCT(TYPICAL). 13. EXISTING AC-9 SYSTEM DUCTWORK WITH CEILING DIFFUSER, <br /> DIFFUSER BRANCH DUCTWORK, DUCTWORK SUPPORTS, <br /> 6. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH 6. NOT USED 2 INSULATION AND VOLUME DAMPER TO REMAIN IN INDICATED <br /> APPLICABLE CODES AND ORDINANCES INCLUDING NEW YORK CITY BUILDING OFFICE AREA. CONTRACTOR REPLACE ANY DAMAGED DIFFUSER, <br /> CODE, MECHANICAL CODE,AND OSHA REGULATIONS. DUCTWORK OR INSULATION. REPLACED AIR DEVICES SHALL <br /> RESTAURANT DEPOT TO PROVIDE "ACR"AND ALL ACCESSORIES. MATCH EXISTING. REBALANCE THE SYSTEM AS REQUIRED. <br /> ❑7. <br /> 7. INSTALL ALL NEW EQUIPMENT TO MEET SERVICE CLEARANCE REQUIREMENTS. ALL OTHER UNITS BY CONTRACTOR. CONTRACTOR RESPONSIBLE FOR PERMIT DATE: 11/06/2020 <br /> TO RECEIVE AND STORE EQUIPMENT, AND COORDINATE 14. FURNISH AND INSTALL SUPPLY AND RETURN MAIN DUCTS ON <br /> 8. PERFORM PROPER AIR BALANCING AS REQUIRED. PROVIDE SUPPLY AIR INSTALLATION OF ALL COMPONENTS. COMPONENTS. SUPPORT LOWER ROOF. FOR MORE INFORMATION SEE DETAIL. CONNECT ,106 N0. 20263 <br /> QUANTITY AT EACH OUTLET AS INDICATED ON THE DESIGN DRAWINGS. UNITS TO STEEL CHANEL SUPPORT STRUCTURE. NEW DUCTWORK TO EXISTING RTU AS REQUIRED WITH NEW <br /> FLEXIBLE CONNECTIONS. PENETRATE AND SEAL WALL OPENING <br /> BETWEEN LOWER AND HIGH ROOF WATERTIGHT. <br /> 15. EXISTING PROGRAMMABLE THERMOSTAT TO REMAIN FOR THE <br /> EXISTING RTU'S. RELOCATE THE THERMOSTAT IF REQUIRED TO Mm200 <br /> ACCOMMODATE THE NEW FIXTURE LAYOUT. <br /> SHEET NO. <br />