My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2022 5:15:03 PM
Creation date
9/20/2021 8:11:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ernest, Frederick [EHD] <br /> From: Steven.J.Jones@shell.com <br /> Sent: Tuesday, October 19, 2021 3:51 PM <br /> To: Ernest, Frederick [EHD] <br /> Cc: theresa.geijer@shell.com; paul.katz@shell.com; Ray.Ramon@shelI.com <br /> Subject: RE: 3515 Navy Drive Lift Station Questions <br /> Attachments: 021324360JJK-Final.pdf, 1-10343 TRANSMIX SLOP SYSTEM.pdf, S-100 FOUNDATION <br /> PLAN, SECTIONS AND DETAILS.pdf, SHELL PUMP-SUMP 96T-2PUMP.PDF <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Hello Frederick, <br /> I hope all is well. Below in red I have answered the questions in your email. <br /> The new fiberglass lift station that was installed in January 2021 is part of the contact water management system for the <br /> site. The new lift station, piping and above ground tank is a single system. The volume of the lift station is<10%of the <br /> total system including piping.According to UST regulations given that the total capacity of the system is<10%this <br /> system does meet the definition of a UST. <br /> I have attached several documents for your review. <br /> 1) A drawing of the fiberglass lift station from the manufacturer. <br /> 2) Drawing 1-10343 which illustrates how the fiberglass lift station works as a system (contact water management <br /> system)with Tank 13.This drawing also shows the flows coming into the lift station. <br /> 3) Drawing S-100 Foundation Plan, Sections and Details <br /> 4) Manifest <br /> Let me know if you have any questions. <br /> Thanks, <br /> Steve J. Jones <br /> Project Manager-Trading&Supply <br /> Shell Oil Company <br /> 1000 Main Street <br /> Houston,TX 77002 <br /> Tel:+1 832 337 9588 <br /> Cell: +1 832 607 1906 <br /> Email:Steven.J.Jones(a)shell.com <br /> 0 <br /> From: Ernest, Frederick [EHD] <fernest@sjgov.org> <br /> Sent: Monday, October 11, 202111:00 AM <br /> To:Jones, Steven J SPLC-STD/GA/1<Steven.J.Jones@shell.com> <br /> Cc:Geijer,Theresa A SPLC-STD/HA<theresa.geijer@shell.com>; Katz, Paul A SPLC-STD/AW<paul.katz@shell.com>; <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.