Laserfiche WebLink
1800 North California Street PR0231036 <br /> September 27, 2021 Program: UST <br /> PHOTO 6: 12/17/2020 DO report with incorrect date of overfill prevention equipment inspection. <br /> Desi underground storage Tank <br /> Designated UST Operator visual Inspection Report <br /> 10• TESTING Date4est <br /> AND MAINTENANCE Yes No NA performed <br /> 72amomonths?ing system certification been completed within the past ❑ ❑ 10/26/2020 <br /> n[hs? <br /> Has spill container testing been completed within the past <br /> 12 months? 91 El 10/26/2020 <br /> Ha past 6II prevention equipment inspection been completed within <br /> the 10/08/2018 <br /> months? 0 ❑ ❑ <br /> Has secondary containment testing been completed within the past <br /> 36 months? ❑✓ ❑ ❑ 10/14/2019 <br /> Has tamesghtness testing been completed within required <br /> timefra <br /> Has line El El Z <br /> tightness testing been completed within the required <br /> timeframes? <br /> Other Test/ ❑ <br /> Maintenance: <br /> Other Test/Maintenance: ❑ <br /> Other Test/Maintenance: 0 ❑ Z-7 <br /> 11, FACILITY EMPLOYEE 7 ❑ ❑ R1 <br /> Have all individuaning ls RAINING <br /> employee Performing IF ili Yes No . <br /> 13• COMMENTS w thin the past 12 months?employee duties received the required facility <br /> This section ma ❑ ❑ <br /> deficiencies. Y be used to record comments or observations that are not current compliance <br /> l answers marked"No"must be described by the designated UST <br /> operator m Section 3. <br /> Page 4 Of 4 <br /> Lydia Baker, SR. REHS Page 6 of 22 <br />