Laserfiche WebLink
1800 North California Street PR0231036 <br /> September 27, 2021 Program: UST <br /> PHOTO 7: 4/7/2021 DO report with incorrect date of overfill prevention equipment inspection. <br /> 1 <br /> �\ Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10• TESTING AND MAINTENANCE Date last <br /> Yes No NA <br /> Has monitoring system certification been completed within the past performed <br /> 12 months? 2 ❑ 10/26/2020 <br /> Has spill container testing been completed within the past <br /> 12 months? ❑ 1012612020 <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? Q ❑ ❑ 1o/08I2018 <br /> Has secondary containment testing been completed within the past <br /> 36 months? ❑ ❑ 10/1412019 <br /> Has tank tightness testing been completed wn require <br /> timeframes? d ❑ ❑ <br /> Has line tightness testing been completed within the require <br /> timeframes? d ❑ ❑ <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: ❑ ❑ <br /> 11. FACILITY EMPLOYEE TRAINING <br /> Have all individuals performing facility employee duties received the required facility Yes No <br /> employee training within the past 12 months? ❑ <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked"No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br /> Lydia Baker, SR. REHS Page 7 of 22 <br />