Laserfiche WebLink
1800 North California Street PR0231036 <br /> September 27, 2021 Program: UST <br /> PHOTO 16: 8/25/2021 DO report with incorrect date of overfill revention e ui ment inspection. <br /> Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10.TESTING <br /> AND MAINTENANCE Date last <br /> Has monitorin s - = -` Yes No NA perfomed <br /> 12 months? g system rcertification been completed within the past <br /> Has spill container testin9 been ❑✓ ❑ 10-26-20 <br /> 12 months? completed within the past <br /> Has overfill prevention a Z E] 10-26-20 <br /> the past 36 months? equipment inspection been completed within <br /> Has secondary containment ❑✓ ❑ ❑ 10-08-20 i <br /> 36 months? testing been completed within the past <br /> Has tank tightness testin ❑✓ ❑ ❑ 10-14-19 <br /> timeframes? 9 been completed within required <br /> Has line tightness testing been co ❑ ❑ <br /> timeframes? mpleted within the required <br /> Other Test/Maintenance: ❑ ❑ zi <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: ❑ ❑ <br /> 11.FACILITY EMPLOYEE TRAINING _ <br /> Have all individuals performing facilit ✓ <br /> employee training within the y employee duties received the required facility Yes No <br /> ,.,1.'.COMMENTS ---past 12 months? ❑✓ ❑ <br /> This section maybe used to record comments or <br /> de£icienaes. <br /> observations that are not current compliance <br /> All answers marked No"must be described by the designated UST operator in <br /> Section 3. <br /> Page 4 Of 4 <br /> Lydia Baker, SR. REHS Page 16 of 22 <br />