Laserfiche WebLink
1800 North California Street PR0231036 <br /> September 27, 2021 Program: UST <br /> PHOTO 17: 9/23/2021 DO report with incorrect date of overfill revention e ui ment inspection. <br /> Underground Storage Tank <br /> Designated UST Operator visual Inspection Report <br /> Date last <br /> 10. TESTING AND MAINTENANCE Yes No NA performed <br /> Has Menke ng system certification been completed within the past m ❑ 10/26/20 <br /> 12 months? <br /> Has 8p11 container testing been completed within the past 10/26/2012 months? <br /> Has overfill prevention <br /> the equipment Inspection been completed whhin <br /> past 36 months? ® ❑ ❑ 10/08/2018 <br /> Has secondary containment testing been completed within the past <br /> 36 months? ❑ El10/14/2019 <br /> Has tank d tightness testing been Completewithin required <br /> timeframes? ❑ ❑ ❑ <br /> Has line tightness testing been completed within the required <br /> timeframes? ❑ ❑ <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: - ❑ ❑ <br /> Other Test/Maintenance: ❑ <br /> 11. FACILITY EMPLOYEE TRAINING ❑ ❑ <br /> Have all individuals performing facility employee du JOS received the required facility <br /> - - ---- __ Yes I N <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> 121 10 <br /> This section maybe used to record comments or ob <br /> enc%s. servations that are not current compliance <br /> 7'his <br /> defic <br /> Al/answers marked'No"Must be described by the designated UST operator in <br /> Seco <br /> 6. • • <br /> 9edof4 <br /> Lydia Baker, SR. REHS Page 17 of 22 <br />