Laserfiche WebLink
INTERPL ANN <br /> ARCHITECTURE <br /> ENGINEERING <br /> INTERIOR DESIGN <br /> PROJECT MANAGEMENT <br /> X <br /> 77Y77_.-1- GENERAL PLAN y <br /> TES; SANITARY PLAN KEY NOTES: <br /> I <br /> E WC 1. THE INSTALLATION OF THE PLUMBING SYSTEMS SHALL BE 1. CONTRACTOR TO ROUTE 1 CONDENSATE LINES FROM COOLER 604 COURTLAND STREET <br /> COORDINATED WITH ALL ELECTRICAL AND MECHANICAL EQUIPMENT <br /> 54 i EVAPORATORS ON ROOF MOP SINK WITH PROPER AIR GAP. SUITE 100 <br /> 3 <br /> 43i: E ,' AND STRUCTURAL SLAB AND FRAMING. <br /> 1 ORLANDO, <br /> f <br /> E i'I ii 2. CONNECT TO EXISTING SANITARY LINE. PLUMBING CONTRACTOR <br /> O, FLORIDA 32804 <br /> 2. REFER TO PLUMBING SHEET P100 FOR PH 407:645:5008 <br /> I�I ENT SCHEDULES INCLUDING SPECIFICATIONS AND ROUGH IN LOCATION OF EXISTING SANITARY PIPING, FX 407:629:9124 <br /> EQUIPMENT � <br /> PLUMBING FIXTURE AND SHALL FIELD VERT L <br /> SIZES DIRECTION OF D SIZE OF I 10 TO ANY <br /> LOW, AN I INVERT, PRIOR <br /> E ? PLUMBING NEW CONNECTION. NOTIFY THE ENGINEER IF INVERT SEAL: <br /> FD-1 <br /> TP-1 I� I <br /> hiD- -:-:-- 3. REFER TO ARCHITECTURAL SHEEP A5O1 FOR FOOD SERVICE AN NOT BE MET. <br /> THIS oocuMENr is rr�oT FOR coNsrRucr€oN° <br /> 1 <br /> EQUIPMENT FIXTURE SCHEDULE. 3. PROVIDE FLOOR DRAIN WITH TRAP PRIMER. SIGNATUREANasEA�APPEARB LOWS <br /> 4. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE <br /> 4. 4" VTR• VERIFY 10' MINIMUM FROM ALL OUTSIDE AIR INTAKES. <br /> INSTALLATION OF ALL DRAIN LINES FROM KITCHEN EQUIPMENT. ALL <br /> I I li INDIRECT DRAIN LINES SHALL BE INSTALLED WITH APPROVED AIR -- <br /> 3 C <br /> r f <br /> GAPS. <br /> f 7 f <br /> S <br /> ......... ..... --...,.,..,.., .E...... _ --_.......,...... ..�m� .,....,... .,_.,., _,..,,.. ..�. 3 13\i f IiJ I _.. F ��'C S~\Y+ ��\'/~���'•1 <br /> 5. ALL WALL PIPING STUB-OUTS SHALL BE SECURELY TIED TO THE ® DOMESTIC PLAN KEY NOTES,' <br /> 42.1 � ? STRUCTURE WITH SUFFICIENT BACKING TO ELIMINATE MOVEMENT. <br /> 53 �` � :' FINAL CONNECTIONS TO KITCHEN SINKS SHALL BEHARD PIPED. M 14 <br /> i CONNECT NEW 3/4" DOMESTIC WATER LINE TO EXISTING WATER STUB, �X I 11I <br /> I wf FS-42.2 <br /> 1. FIELD VERIFY LOCATION. PROVIDE NEW 1" RPZ AND METER AS <br /> E 6. PITCH ALL WASTE AND DRAIN LINES A MINIMUM OF 1/2" PER FOOT <br /> W4 FD-1 i........ REQUIRED. PROVIDE AN APPROVED REDUCED PRESSURE BACKFLOW <br /> _._mm..; �� � .... ....._� IN THE DIRECTION OF FLOW, OR AS REQUIRED BY LOCAL CODE. <br /> PREVENTER, OR OTHER APPROVED, TESTABLE, CONTINUOUS PRESSURE, <br /> IE <br /> TP-1 E ,' 7. ALL OPENINGS IN DWV SYSTEMS RESULTING FROM INSTALLATION BACKFLOW DEVICE. A BACKFLOW PREVENTER SHALL BE INSTALLED /7 <br /> ROUGH-IN SHALL BE PROTECTED WITH A TEST PLUG THAT IS BETWEEN TH WATER SUPPLY LINE AND THE CARBONATOR FOR <br /> J I I . .... SECURELY LOCKED IN PLACE UNTIL FINAL FINISHED CONNECTIONS CCARBONATEDEBEVERAGE SYSTEMS. CONDUIT AND FITTINGS BETWEEN THE <br /> ARE INSTALLED. BACKFLOW PREVENTER AND THE CARBONATOR SHOULD BE FLEX LINE <br /> r <br /> " 4 VTR ..__ .. <br /> i AND STAINLESS STEEL, DO NOT USE COPPER OR BRASS. PROVIDE AN <br /> APPROVED FUNNEL DRAIN ASSEMBLY WITH AN APPROVED AIR GAP <br /> A�QD 8. PLUMBING CONTRACTOR TO ARRANGE AND PAY FOR ALL REQUIRED PL <br /> �` <br /> I FEES, PERMITS, AND MISCELLANEOUS COSTS ASSOCIATED WITH THE TO A FLOOR SINK TO PROVIDE DRAINAGE FOR THE RELIEF <br /> k! i =1�tV i PLUMBING WORK PER LOCAL PLUMBING CODES. <br /> ED Larson <br /> I - - r � E E1 V VALVE OF THE BACKFLOW DEVICE. INSTALL WATER FILTERS UPSTREAM <br /> (WATER SUPPLY SIDE) OF THE BACKFLOW PREVENTER. THESE UNITS <br /> FD-- E E E <br /> £ 1 9. ALL HANDICAPPED ACCESSIBLE WATER CLOSETS SHALL HAVE THE SHALL MEET ALL OTHER PLUMBING CODE REQUIREMENTS. THE Engineering, Inc. <br /> 46 1 <br /> TP-11 43 DEPARTMENT RECOMMENDS THE USE OF A STAINLESS STEEL BACKFLOW <br /> i 53 46.2 SID OF HANDICAPPED ACCESSIBLE 488 Bond Street, Suite 100 <br /> !!FS-1 PROVIDE <br /> 1 STALL AS BY ADA REQUIREMENTS, <br /> PREVENTER CERTIFY THE BACKFLOW PREVENTER AND A COPY <br /> MS-1; EDOF THE BACKFLOW PREVENTER TESTS CERTIFICATION. Naperville, Illinois 60563-6503 <br /> E HE <br /> REQUIRED <br /> 3 (P) 630.357.0540 (F) 630.357.0164 <br /> ' 10. NO NEW PIPING SHALL BE INSTALLED ABOVE THE EXISTING LOCATION OF 2, PROVIDE MIXING ' <br /> VALVE WATTS SERIES TO LAVS AND SINKS. <br /> ILLINOIS LICENSE NO. 184-001442 <br /> ......:/ INTERIOR ELECTRICAL PANEL(S). <br /> LEIL Comm, No. 24110029.000 <br /> _... .. . .. _ _... <br /> WGO 11. ALL FLOORDRAINSAND FLOOR SINKS ARE PROVIDED BY THE PLUMBING INTERIOR ELECTRICAL PANE <br /> 3. NO NEW PIPING SHALL BE INSTALLED ABOVE THE PROPOSED LOCATION COPYRIGHT©201 <br /> 7 <br /> CONTRACTOR, OF I L(S). <br /> 12. ® DENOTES KITCHEN EQUIPMENT. REFER TO ARCHITECTURAL SHEET 4• ROUTE CW DN IN WALL. STUB OUT TO WATER FILTER CONNECTION. <br /> A501 FOR FURTHER INFORMATION. 5. PROVIDE WATER SHOCK ARRESTORS AT TOP OF H&CW. <br /> 6. PROVIDE ADDITIONAL WATER SUPPLY WITH SHUTOFF VALVE FOR MOP <br /> SINK CHEMICAL SYSTEM, DO NOT CONNECT CHEMICAL SYSTEM TO MOP <br /> SANITARYNENT PLUMBING PLAN NORTH SINK FAUCET. PROVIDE WITH BACK FLOW PREVENTER. <br /> 1 SCALE; 114" = _P-0" <br /> 7. ROUTE 3/4" COLD WATER LINE UNDER SLAB TO FUTURE EQUIPMENT <br /> LOCATION• <br /> 8. CONNECT NEW 1" NG LINE TO EXISTING GAS METER FOUND BEHIND <br /> BUILDING. VERIFY LOCATION OF GAS METER AND LONGEST LENGTH FROM <br /> GAS METER TO ERTU-1 IS TO BE A MAXIMUM OF 100'. <br /> GAS DEMAND LOAD WATER HEATER SIZING CALCULATION <br /> CONN. INPUT TOTAL OPERATIONAL NON--OPERATIONAL <br /> N0. DESCRIPTION SIZE QTY (MBH/EA) (MBH) EQUIPMENT TYPE QTY, GALLONS/HOUR/DAY TOTALS <br /> TOTAL TOTAL <br /> 1 ERTU-1 1/2" 1 100 100 <br /> 2 WH-1 1 2" 1 100 100 * 2-COMPARTMENT PREP SINK 1 10 10 0 10 <br /> * 3-COMPARTMENT POT SINK 1 25 25 0 25 <br /> HVAC SUB-TOTAL 100 <br /> E _...._. _.. - * JA 1 10 10 0 10 <br /> HEATING SUB TOTAL 100 JANITOR'S SINK <br /> GAS DEMAND TOTAL 200 <br /> I <br /> 3 `y II Tl ;I 54 I (PING SIZE 0 <br /> fE <br /> f E 51 h NOTE(S): <br /> P E IS BASED ON LONGEST RUN METHOD. <br /> HAND SINK 5 10 10 <br /> ;E ... E_ ;.... -- `r 1 € 2. HE GAS SYSTEM SIZED FOR THE RTU, OVEN AND WATER HEATER IS SIZED FOR <br /> T LAVATORY 5 5 5 O <br /> J. <br /> A TOTAL DEVELOPED LENGTH OF MAXIMUM 100'-0" FROM THE GAS METER. TOTAL 60 GPH 15 GPH 45 GPH <br /> i � N I N '� N ' 3. PIPE SIZES SHOWN ON THE PLUMBING PLAN ARE BASED ON 2016 CALIFORNIA U <br /> 5 <br /> I NS FOR ACTUAL DEV <br /> ELOPED LENGTH AND <br /> PLUMBING CODE VERIFY FIELD CONDITIONS Z <br /> POSSIBLE ADJUSTMENTS TO PIPE SIZES. AL x 80% FOR SINGLE USE UTENSILS 10 GPH 44 GPH ° <br /> TOT <br /> U <br /> FIXTURE IS NOT USED DURING OPERATIONAL HOURS <br /> E <br /> NO DATE REMARKS <br /> C <br /> F I VISIONS <br /> S lit <br /> �1 <br /> t, 1 <br /> �.................... ... ............_.- ...._,..__....... ..,....__.,..,..,._ „'.�. ««....« _ I� Eli <br /> 3 <br /> E £ <br /> : <br /> z I <br /> : ( <br /> 13 E <br /> - <br /> 7-7 <br /> 1r_ <br /> y € O <br /> I <br /> i ...... ........... _-., O <br /> . 42f1 <br /> DRAINAGE FIXTURE UNITS SCHEDULE FOR NEKTER c <br /> X, -- EX. CW o <br /> 1 <br /> 1". NG 1" NG <br /> Mo <br /> k] i <br /> _ ] 3 E <br /> MINIMUM FIX. TRAP AND <br /> TYPE OF FIXTURE FIXTURE DESIGNATION QTY. FIX. UNITS (EACH) TOTAL FIX. UNITS NOTES <br /> (ON Roar 2 z <br /> __.. ;. <br /> ( II z DRAIN SIZE a <br /> 100 h4BH <br /> F LU <br /> f <br /> LU <br /> I <br /> 3 _ I N I I FLOOR SINK FS-1 5.0 3„ 20.0 X <br /> LAV 1 ' <br /> € 20 3 2O <br /> I <br /> [ P BASIN MS-1 1 � <br /> € <br /> WH-1 X <br /> I <br /> I <br /> 100 MBH I 3-COMPARTMENT SINK 42.1 1 <br /> 43 2 2.0 2" 2.0 s <br /> € <br /> X w <br /> it <br /> 6 2 COMPARTMENT SINK 46 <br /> I _ 2.p nektar <br /> z <br /> E , <br /> 1 2D 20 X <br /> ICE BAR <br /> ...... -.....- <br /> JUICE <br /> HAND SINK 43 2 1.0 2" 2.0 X c <br /> SO 46151 <br /> 40.1 <br /> 40,2 4O FLOOR DRAIN FD 3 1.0 2" 3.0 X 211 LINCOLN CENTER c <br /> 46, <br /> BATHROOM GROUP WM STOCKTON, CALIFORNIA 95207 ° <br /> 1 5.0 3" 5.0 X <br /> TOTAL DRAINAGE FIXTURE UNITS: 36.0 0 <br /> U <br /> DOMESTIC WATERMAT GAS PLAN NORTH PROJECT NO: 2017.0599 c <br /> 2 SCALE: 114° -- P-0" DATE: 12.14.17 <br /> W <br /> c <br /> U <br /> z <br /> 0`4 <br /> P <br /> 101 c <br /> n <br /> CD <br /> PLUMBING PLANS O <br /> c� <br /> C <br /> CHECKED: MFGDRAWN: ADW 0 <br />