Laserfiche WebLink
SANJOARIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facil it,Nan.: I Facility Address: Oat.: <br /> Gemco Ripon Truck Plaza Inc. 1022 E FRONTAGE R0, RIPON February 10, 2020 <br /> SUMMARY OF VIOLATIONS <br /> ICLASS I,CLASS II,or MINOR-NOti..m Comply) <br /> Item M Remarks <br /> 203 CFR 112.3 Failure to implement the SPCC Plan. <br /> The SPCC plan calls for at least on employee to go through a 40 hour Hazardous Waste Operations and <br /> Emergency Response(HAZWOPER)training and an 8 hour yearly refresher course.According to the facility <br /> manager,nobody at the site has been through that training.The SPCC plan calls for the inspection of the oil water <br /> separator at least once per month as per National Pollutant Discharge Elimination System(NPDES)requirements. <br /> The facility is not inspecting the oil water separator as per the SPCC plan,per facility manager.A section in the <br /> SPCC plan describes the tanks as being raised above ground and have continuous electronic monitoring into the <br /> interstitial secondary,this was not observed.The tanks appear to be single walled and an interstitial secondary <br /> containment monitored electronically was not observed.The SPCC plan plan states in a section of the plan that <br /> piping from the 20,000 gallon tanks to the dispensers is readily visible for easy Hewing so any pipe leaks would be <br /> immediately detectable through regular inspections.Piping from the 20,000 gallon tanks to the dispensers was <br /> observed to be under ground and was not visible for inspections.The SPCC plan stated on Table 4-2 that the berm <br /> is to be inspected every 10 years by a certified STI SP-001 inspector.This has not occurred. <br /> The countermeasures for discharge discovery,response,and cleanup are not being followed.Contaminated <br /> absorbent was observed around the fill pipe.The absorbent appeared to be contaminated from diesel that escapes <br /> from the fill pipe during the loading process.A drip pan was also observed under the fill pipe,which had small <br /> amounts of liquid.This was not the process described in the discharge discovery,response and cleanup section of <br /> the plan.The absorbent was swept up and placed in a container.This portion was corrected at the time of the <br /> inspection. <br /> The owner or operator or an onshore or offshore facility subject to this section must prepare in writing and <br /> implement a Spill Prevention Control and Countermeasure Plan(hereafter`SPCC Plan'or`Plan');in accordance <br /> with§112.7 and any other applicable section of this part. <br /> The SPCC plan must be implemented as written. If the plan will be amended and the amendments are technical,a <br /> Certification by a Professional Engineer will be required. <br /> This is a Class II violation. <br /> FMOY5W P110516196 S0301 0210202t <br /> MAD18U1 Rcr.&SN1018 Page 8 of 18 Abaveg JPtl —Slna AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 488-3420 1 F 209 4840138 1 www.sjoehd.com <br />