Laserfiche WebLink
SANJOARIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facil it,Nan.: I Facility Address: Oat.: <br /> Gemco Ripon Truck Plaza Inc. 1022 E FRONTAGE R0, RIPON February 10, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-NOti..m Comply) <br /> Item M Remarks <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The submitted cross reference in the SPCC plan included page numbers for reference but the SPCC plan does not <br /> include page numbers, and the location of the requirements is unclear.The location of the discussions for the <br /> requirements of subsections for CFR 112.8 are unclear. <br /> If you are the owner or operator of a facility subject to this part you must prepare a Plan in accordance with good <br /> engineering practices.The Plan must have the full approval of management at a level of authority to commit the <br /> necessary resources to fully implement the Plan.You must prepare the Plan in writing. If you do not follow the <br /> sequence specified in this section for the Plan,you must prepare an equivalent Plan acceptable to the Regional <br /> Administrator that meets all of the applicable requirements listed in this part, and you must supplement it with a <br /> section cross-referencing the location of requirements listed in this part and the equivalent requirements in the other <br /> prevention plan. If the Plan calls for additional facilities or procedures,methods,or equipment not yet fully <br /> operational,you must discuss these items in separate paragraphs,and must explain separately the details of <br /> installation and operational start-up. <br /> The SPCC plan must have a cross-reference which references the location of requirements listed in SPCC <br /> regulations when not following the sequence of the SPCC regulations.A cross-reference that meets the <br /> requirements will need to be submitted. <br /> This is a repeat violation,Class If. <br /> 603 CFR 112.7(sX3)Failed to adequately describe the physical layout of the facility in the Plan. <br /> The provided facility diagram did not provide the contents of each fixed oil storage container and did not mark as <br /> `exempt'underground storage tanks that are otherwise exempted from the requirements.The facility diagram did <br /> not include connecting piping to the Aboveground Storage Tanks. <br /> Describe in your Plan the physical layout of the facility and include a facility diagram,which must mark the location <br /> and contents of each fixed oil storage container and the storage area where mobile or portable containers are <br /> located.The facility diagram must identify the location of and mark as'exempt' underground tanks that are <br /> otherwise exempted from the requirements of this part under§112.1(dx4).The facility diagram must also include all <br /> transfer stations and connecting pipes,including intra-facility gathering lines that are otherwise exempted from the <br /> requirements of this part under§112.1(dx11). <br /> The facility diagram needs to meet all the requirements of the regulations including,marking underground storage <br /> tanks as exempt,contents of each fixed oil storage container and connecting piping. <br /> This is a repeat violation,Class If. <br /> FM00055) P110516196 S0301 0210202t <br /> MAD18U1 Rcr.&SN1018 Page 7 of 16 Abaveg JPtlr SWr AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjoehd.com <br />