My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1687
>
1600 - Food Program
>
PR0542219
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 3:37:19 PM
Creation date
10/1/2021 12:38:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0542219
PE
1623 - RESTAURANT/BAR 1-20 SEATS
FACILITY_ID
FA0024252
FACILITY_NAME
SUBWAY #67236
STREET_NUMBER
1687
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\ymoreno
Supplemental fields
Site Address
1687 2 N CALIFORNIA ST STOCKTON 95204
Suite #
2
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br />Electrical Power Distribution <br />CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION "IlO - <br />CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br />Electrical Power Distribution (Page 1 of 6) <br />Pooled Name: New Subway Tl Stockton Dateprcwned: 2r7J2017 <br />General Information <br />Field Inspector <br />Check one or more boxes below for applicable requirements of Section 130.5(d) for the electrical power distribution <br />Project Address: <br />1617 N. California St <br />system. <br />Climate Zone: <br />12 <br />V The control is capable of automatically shutting OFF the controlled receptacles when the space is typically <br />onditioned Floor Area: <br />Unconditioned Floor Area: <br />0 <br />Building Type: 0 Nonresidential <br />❑ Schools <br />Cl High -Rise Residential <br />❑ Relocatable Public Schools <br />❑ Hotel/Motel <br />Phase of Construction: ❑ New Construction <br />Cl Addition <br />0 Alteration <br />In the table below identify all applicable construction documents that specify the requirements for the scope of responsibility <br />reported by this certificate. Use additional pages as needed to list all construction documents related to compliance of Section 130.5. <br />Document Title/ Descriptions <br />Document Number (include description information for Table or <br />Schedule if it contains compliance information) <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance <br />STATE OF CALIFORNIA <br />Electrical Power Distribution <br />January 2016 <br />CEC-NRCC£LC-01-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION -illi` <br />CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br />Electrical Power Distribution (Page 5 of 6) <br />Pndect Name: Date Prepared: <br />New Subway TI Stockton 21212017 <br />C. Voltage Drop Enforcement Agency <br />Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(c). Check that the system <br />complies <br />91 The electrical power distribution system meets the voltage drop requirement of Section 130.5(c). The maximum <br />combined voltage drop on feeder conductors and branch circuit conductors to the farthest connected load or ❑ <br />outlet, do not exceed 5%. <br />X Voltage drop calculation documents showing compliance to Section 130.5(c) are submitted as part of the ❑ <br />compliance document submittal. <br />D. Circuit Controls for 120 -Volt Receptacles and Controlled Receptacles <br />Field Inspector <br />Check one or more boxes below for applicable requirements of Section 130.5(d) for the electrical power distribution <br />Cehck that the system <br />Y <br />system. <br />complies <br />V The control is capable of automatically shutting OFF the controlled receptacles when the space is typically <br />kW demand and kWh for a utility -defined period. Fill out Column I,1 and 6 of table below with the compliance information. <br />unoccupied, either at the receptacle or circuit level. For the automatic time switch control, it incorporates an <br />Cky/SWee/Zip: American Canyon, CA 94503 <br />override control that allows the controlled receptacle to remain ON for no more than 2 hours when an override <br />P <br />❑ <br />is initiated and an automatic holiday "shut -OFF" feature that turns OFF all loads for at least 24 hours and then <br />1. The information provided on this Certificate of Compliance is true and correct. <br />resumes the normally scheduled operation. Countdown timer switches are not be used to comply with the <br />identified on this Certificate of Compliance (responsible designer). <br />automatic time switch control requirements. The controls meet the requirement of Section 130.5(d)1. <br />design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of <br />❑ There is at least one controlled receptacle within 6 ft from each uncontrolled receptacle. Where receptacles are <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information <br />installed in modular furniture in open office area, at least one controlled receptacle is installed at each <br />❑ <br />workstation. The receptacles meet the requirement of Section 130.5(d)2. <br />building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this <br />❑ There are installed split wired receptacles with at least one controlled and one uncontrolled receptacle. Where <br />Respmsible Designer Name: Prabhjeet S. Grewal <br />receptacles are installed in modular furniture in open office area, at least one controlled receptacle is installed <br />❑ <br />at each workstation. The receptacles meet the requirement of Section 130.5(d)2. <br />Date Signed: <br />01-30-17 <br />Sj Permanent and durable marking for controlled receptacles or circuits to differentiate them from uncontrolled <br />❑ <br />receptacles or circuits is provided. The markings meet the requirement of Section 130.5(d)3. <br />'bone: 707-373-9451 <br />Cl For hotel and motel guest rooms, there are controlled receptacles for at least one-half of the 120 -volt <br />01 <br />receptacles in each guest room. Electric circuits serving controlled receptacles in guestrooms are installed to <br />03 <br />have captive key controls, occupancy sensing controls, or automatic controls so the power is switched off no <br />❑ <br />longer than 30 minutes after the guest room has been vacated. The receptacles meet the requirement of <br />07 <br />Section 130.5(d)4. <br />@ <br />❑ Receptacles that are only for the following purposes are excepted from Section 130.5(d): <br />i <br />°w.E. <br />-Receptacles specifically for refrigerators and water dispensers in kitchen areas. <br />s <br />3 <br />-Receptacles located a minimum of six ft above the floor that are specifically for clocks. <br />c <br />°' <br />-Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in <br />a) <br />copy rooms. <br />❑ <br />-Receptacles on circuits rated more than 20 amperes. <br />^' a 'o <br />ep re. o <br />-Receptacles connected to an uninterruptible power supply (UPS) that are intended to be in continuous use, 24 <br />v <br />hours per day/365 days per year, and are marked to differentiate them from other uncontrolled <br />a <br />receptacles or circuits. <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance <br />17 8:03:11 AM <br />January 2016 <br />STATE OF CALIFORNIA <br />Electrical Power Distribution <br />CEGNRCC{LC-01-E (Revised 01116) CALIFORNIA ENERGY COMMISSION Y' <br />CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br />Electrical Power Distribution (Page 2 of 6) <br />Prelett Name: New Subway TI Stockton Date Prepared. 2/2/2017 <br />Document Title/ Descriptions `` Applicable <br />�Doct}meniSheet:# <br />Document Number (include description information for Table or subsection of <br />or Page # <br />ch Icontains <br />5 edu a If it compliance information) Section 136 5 <br />CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance <br />STATE OF CALIFORNIA <br />Electrical Power Distribution <br />January 2016 <br />CEC-NRCC-ELC-01-E (Reused 01116) CALIFORNIA ENERGY COMMISSION 'a" <br />CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br />Electrical Power Distribution (Page 6 of 6) <br />Pm,ect Nam.: New Subway TI Stockton cote prewrea. 2/2/2017 <br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br />1. 1 certify that this Certificate of Compliance documentation is accurate and complete. <br />Dowmentauon Author Name: Prabhjeet S. Grewal Documentation Author Signature: t <br />9. <br />' 31 <br />Comparry: Signature Date: -- - - - <br />Grewal Engineering Associates, Inc. 2/2/2017 <br />Address: 11 Bulrush Court <br />CFA/ HERS Certincation Identincabon (if applicable): <br />kW demand and kWh for a utility -defined period. Fill out Column I,1 and 6 of table below with the compliance information. <br />E15692 <br />Cky/SWee/Zip: American Canyon, CA 94503 <br />phone: 707-373-9451 <br />RESPONSIBLE PERSON'S DECLARATION STATEMENT <br />I certify the following under penalty of perjury, underthe laws of the State of California: <br />1. The information provided on this Certificate of Compliance is true and correct. <br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design <br />identified on this Certificate of Compliance (responsible designer). <br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system <br />design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of <br />Regulations. <br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information <br />provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement <br />agency for approval with this building permit application. <br />S. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the <br />building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this <br />Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. <br />Respmsible Designer Name: Prabhjeet S. Grewal <br />Responsible Designer Signature' <br />(check all that are present) <br />company` Grewal Engineering Associates, Inc <br />Date Signed: <br />01-30-17 <br />Address:11 Bulrush Court <br />License: <br />El 5692 <br />oty/SGte/zip: American Canyon, CA 94503 <br />'bone: 707-373-9451 <br />CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance <br />January 2016 <br />STATE OF CALIFORNIA <br />Electrical Power Distribution <br />rs <br />_ECNRCC-ELC-01{ (Revised 01116) CALIFORNIA ENERGY COMMISSION '411111111111111` <br />CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br />Electrical Power Distribution (Page 3 of 6) <br />New Subway Tl Stockton °"`Pr` let 2/2/2017 <br />A. Service Electrical Metering <br />Check one of the three boxes below if the electrical power distribution system is in compliance with Section 130.5(x). <br />❑ For newly installed electrical service in newly constructed buildings, Service Electrical Metering is required according to Section 130.5(a). Fill out <br />Column 1 thru 6 of table below. <br />g For new or replacement electrical service equipment in existing buildings, Service Electrical Metering is required according to Section 141.0(b)2Pi. <br />Fill out Column 1 thru 6 of table below. <br />❑ EXCEPTION to Electrical Service Metering: Service or feeder for which the utility company provides a metering system that indicates instantaneous <br />kW demand and kWh for a utility -defined period. Fill out Column I,1 and 6 of table below with the compliance information. <br />Fill out a separate line for each electrical service that is connected to the building. If additional table space is needed for electrical service information, <br />submit additional page with the information. <br />Electrical Power Distribution System information and Method of <br />Electrical <br />Enforcement <br />compliance <br />Rating <br />Agency <br />Metering Capabilities <br />Exception to <br />03 <br />Electrical Service Schedule <br />Service <br />W <br />Field Inspector <br />Designation/Location/Descrip <br />Describe the electrical power distribution system installed and the <br />(check all that are present) <br />1.30.5(a) <br />rl_ <br />co <br />compliance method used. <br />Rating <br />system complies <br />tion <br />01 <br />02 <br />03 <br />04 <br />05 <br />06 <br />07 <br />08 <br />@ <br />O^ <br />C) <br />i <br />°w.E. <br />y <br />a <br />s <br />3 <br />a <br />c <br />°' <br />a) <br />C0 <br />C ' <br />3 <br />o. <br />^' a 'o <br />ep re. o <br />a <br />o <br />v <br />Check that the <br />a <br />CQ <br />Fn <br />metering complies <br />Electrical Service <br />U <br />J <br />a <br />C13 <br />ce)) <br />C:) <br />@ <br />Designation/Location/Description <br />kVA <br />c ° <br />L) <br />~ <br />m <br />New Panel P 225A <br />72 <br />r❑ <br />❑ <br />in <br />❑ <br />❑" <br />= CI' ., <br />c <br />C: c <br />'S <br />� <br />�=v <br />! <br />0-WUCO <br />r� <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance <br />January 2016 <br />STATE OF CALIFORNIA <br />Electrical Power Distribution <br />Q a <br />CEC-NRCC{LC-01-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION '141l <br />CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E <br />Electrical Power Distribution (Page 4 of 6) <br />Pro.ct"ame: New Subway Tl Stockton wtB Pfepdfed.. 2/2/2017 <br />B. Separation of Electrical Circuits for Electrical Energy Monitoring <br />Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(b). <br />IS The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section <br />130.5(b). The electrical power distribution systems Is designed so that measurement devices can monitor the electrical energy usage of load <br />types according to TABLE 130.5-B. <br />Cit Describe the electrical power distribution system installed and the compliance method chosen in meeting the requirement of Section <br />130.5(b). Use the space below to include the information. Examples of compliance methods are detailed in Nonresidential Compliance <br />Manual Chapter 8. <br />Fill out Column I thru 3 with the compliance information. <br />General information <br />Electrical Power Distribution System information and Method of <br />Electrical Service <br />Enforcement <br />compliance <br />Rating <br />Agency <br />01 <br />02 <br />03 <br />04 <br />Electrical Service <br />W <br />to <br />Designation/Location/Descrip <br />Describe the electrical power distribution system installed and the <br />kVA <br />Check that the <br />rl_ <br />co <br />compliance method used. <br />system complies <br />tion <br />O C <br />N O <br />rn <br />J <br />New Panle P 225A <br />Separate Panels for loads <br />72 <br />❑ <br />Field Inspector Notes: <br />@ <br />O^ <br />C) <br />N <br />O <br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance <br />VOLTAGE DROP NOTES <br />CONNECT ALL DEVICES TO CIRCUITS AS INDICATED. ALL BRANCH CIRCUIT <br />VOLTAGE DROP SHALL NOT EXCEED 3%. MINIMUM CONDUCTOR SIZE <br />SHALL BE #12 AWG. <br />FOR 120V, 20A CIRCUITS.. USE #10 AWG CONDUCTORS FOR LENGTHS <br />BETWEEN 100—FEET AND 125—FEET; USE #8 AWG CONDUCTORS, FOR <br />LENGTHS BETWEEN 125—FEET AND 200—FEET. <br />FOR 208V, 20A CIRCUITS, USE #10 AWG CONDUCTORS FOR LENGTHS <br />BETWEEN 150—FEET AND 250—FEET. USE #8 AWG CONDUCTORS FOR <br />LENGTHS BETWEEN 250—FEET AND 350—FEET. <br />FOR 277V, 20A CIRCUITS, USE #10 AWG CONDUCTORS FOR LENGTHS <br />BETWEEN 175—FEET AND 275—FEET. USE #8 AWG CONDUCTORS FOR <br />LENGTHS BETWEEN 275—FEET AND 375—FEET. <br />(INCREASE WIRE SIZE IF CIRCUIT LENGTH IS LONGER THAN INDICATED <br />ABOVE. VOLTAGE DROP SHALL NOT EXCEED 3%) <br />January 2016 <br />0 <br />W <br />H <br />Q <br />6i w <br />Z t= <br />O� <br />U) <br />> 0 <br />W Fn <br />W > <br />w <br />Of <br />t <br />s <br />T <br />N <br />1 <br />W <br />J <br />f- <br />0 <br />LLIW <br />F O <br />d' <br />I— a <br />FC4EXP.6-30-18 <br />DATE: <br />01/17/2017 <br />JOB: <br />C <br />GD <br />BY: PSG <br />CHK <br />" = <br />C <br />04 <br />0) <br />y <br />c <br />00 <br />U <br />> <br />z <br />c <br />O <br />W <br />to <br />:3a) <br />rl_ <br />co <br />> <br />C'4 <br />co <br />O C <br />N O <br />rn <br />J <br />-0 C) <br />co <br />@ <br />O^ <br />C) <br />N <br />O <br />U <br />C <br />U <br />0) <br />C <br />r <br />I,- <br />a) <br />C0 <br />CO <br />� <br />LL <br />C <br />a <br />CQ <br />Fn <br />C:E <br />U <br />J <br />a <br />C13 <br />ce)) <br />C:) <br />@ <br />C <br />0) cc <br />g <br />cc) <br />04 <br />L) <br />c c <br />.a) <br />m <br />0) <br />J co <br />ti <br />— <br />O <br />U <br />• 0 <br />cm <br />c <br />C: c <br />'S <br />� <br />E <br />! <br />0-WUCO <br />T <br />N <br />1 <br />W <br />J <br />f- <br />0 <br />LLIW <br />F O <br />d' <br />I— a <br />FC4EXP.6-30-18 <br />DATE: <br />01/17/2017 <br />JOB: <br />PTST-05 <br />DWG <br />BY: PSG <br />CHK <br />BY: PSG <br />E0.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.