STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Electrical Power Distribution Electrical Power Distribution Electrical Power Distribution
<br /> NRCC-ELC-E CALIFORNIA ENERGY COMMISSION NRCC-ELC-E CALIFORNIA ENERGY COMMISSION NRCC-ELC-E CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E
<br /> This document is used to demonstrate compliance with mandatory requirements in§13a5 for electrical systems in newly constructed nonresidential,high-rise residential and Project Name: Starbucks Report Page: (Page 2 of 5) Project Name: Starbucks Report Page: (Page 3 of 5) WM-
<br /> hotel/motel occupancies.Additions and alterations to electrical service systems in these occupancies will also use this document to demonstrate compliance per§141.0(a) or Project Address: 1810 Pacific Ave.I Date Prepared: 3/24/2020 Project Address: 1810 Pacific Ave.1 Date Prepared: 3/24/2020
<br /> §141.0L__for alterations..
<br /> Project Name: Starbucks Report Page: (Page i of 5)
<br /> Project Address: 1810 Pacific Ave.Date Prepared: 3/24/2020 D.EXCEPTIONAL CONDITIONS G.SEPARATION OF ELECTRICAL CIRCUITS FOR ENERGY MONITORING
<br /> This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. This table includes entirely new or complete replacement electrical power distribution systems to demonstrate compliance with.4130.5(b).Any load types that are not included in the
<br /> A.GENERAL INFORMATION service do not need to be shown.
<br /> 01 Project Location(city) Stockton 02 Occupancy Types Within Project: E.ADDITIONAL REMARKS 01 02 03 04 05
<br /> This table is includes remarks made b the permit applicant to the Authority Having Jurisdiction. Minimum Required Separation of Location of Requirements in Construction Field Inspector
<br /> ❑ Office ❑ Retail ❑ Warehouse ❑ Hotel/Motel ❑ School ® Support Areas y p pp y g Load Type per Table 130.5-B i Compliance method'
<br /> ❑ Parking Garage ❑ High-Rise Residential I ❑ lRelocatable ❑ Healthcare Facilities 10ther(write in) ISee Table I F.SERVICE ELECTRICAL METERING Panel"A" Load per Table 130.5-B Documents Pass Fail
<br /> ©2017 STARBUCKS COFFEE COMPANY
<br /> B.PROJECT SCOPE This table includes new or replacement electrical service systems OR equipment to demonstrate compliance with§130.5(a) Lighting including exit,egress and exterior All lighting in aggregate Method 1 E-6001 ❑ ❑
<br /> This table includes electrical systems that are within the scope of the permit application. 01 02 03 04 05 HVAC systems and components All HVAC in aggregate Method 1 E-6001 El STARBUCKS COFFEE
<br /> 01 02 03 04 05 Required Metering Capabilities per Table 130.5-A Field Inspector Domestic and service water systems All loads in aggregate Method 1 E-6001 ❑ ❑
<br /> Electrical Service Rating Tracking kWh for Location of Requirements in COMPANY
<br /> System subject to CA Elec Code g All plug loads in aggregate
<br /> t Rating Utility Provided Metering System Designation/Description kVA Instantaneous Historical Peak kWh per rate
<br /> Electrical Service Designation/Description Scope of Work 2 Article 517 Exception to (kVA)
<br /> Demand(kW) Demand(kW) user-defined period Construction Documents Pass Fail Groups of plug loads exceeding
<br /> (kVA) Exception to 130.5 a §130.5(aland (b) period Plug Loads and appliances less than 25kVA 25 kVA connected load in an area Method 1 E-6001 ❑ ❑ 2401 UTAH AVENUE SOUTH
<br /> New electrical service equipment and Panel"A" 144 El ® ® ElE-6001El El less than 5000 sf SEATTLE,WASHINGTON 98134
<br /> Panel"A" meter 144 El El *NOTES:if"Other*"is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below. (206)318-1575
<br /> Where required,demand response controls must be specified which are capable of receiving and automatically FOOTNOTES:For each separate load type,up to 10%of the connected load may be of any type.
<br /> responding to at least one standards based messaging protocol which enables demand response after receiving a demand Method 1:Switchboards/motor control centers/panelboard loads disaggregated for each load type.
<br /> 06 Demand Response Controls response signal.Sections 120.2 130.1 and 130.3 and compliance documents NRCC-MCH NRCC-LTI and NRCC-LTS will THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> ethod2:Switchboards/motorcontrolcenters/panelboard supply other distribution equipmentwithloadsdisaggregatedforeachloadrype. CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> indicate when demand response controls are required. Method3:Branch circuits serve load types individually and provisions for adding future branch circuit monitoring.
<br /> FOOTNOTES.Adding only new feeders and branch circuits triggers Voltage Drop 130.5(c),no other requirements from 130.5 are required, Method 4:Complete metering system measures and reports loads by type. PROPERTY OF STARBUCKS CORPORATION,
<br /> Applicable if the utility company is providing a metering system that indicates instantaneous kW demand and kWh fora utility-defined period. See Chapter 8 of the Nonresidential Compliance Manual for more detall on Compliance Methods. WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> THIS WORK. THEY SHALL NOT BE
<br /> C.COMPLIANCE RESULTS H.VOLTAGE DROP REPRODUCED(IN WHOLE OR IN PART), SHARED
<br /> d
<br /> dd
<br /> h
<br /> i
<br /> l
<br /> i
<br /> ib
<br /> di
<br /> l ipower distribution systems,or alterations that a ,modify or rep
<br /> l
<br /> l
<br /> l
<br /> l
<br /> i
<br /> d
<br /> l
<br /> i
<br /> table This tae ncues entirely new or compete replacement electrical lace both feeders and branch circuits to
<br /> Results in this table are automatically calculated from data input and calculations in Tables F through i.Note:if any cell on this table says"COMPLIES with Exceptional Conditions"refer TWITH THIRD PARTIES OR USED IN ANY MANNER
<br /> to Table a Exceptional Conditions forguidance or see applicable Table referenced below. demonstrate compliance with 130.5 c.For alterations,only the altered circuits must demonstrate compliance per§141.OU2Piii ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> 01 02 03 04 05 01 02 03 04 05 PROJECT WITHOUT THE PRIOR WRITTEN
<br /> Sheet Number for Voltage Drop Field Inspector
<br /> Service Electrical Separation for Controlled Receptacles Electrical Service Combined Voltage Drop on Installed Feeder/Branch Location of Voltage Drop CONSENT OF STARBUCKS CORPORATION.
<br /> AND AND Voltage Drop 130.5 c AND
<br /> Metering 130.5 a Monitoring 130.5 b (See Table 3 §130.5(d) Calculations in Construction Designation/Description Circuit Conductors Compliance Method Calculations'- Documents Pass Fail THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> (See Table F) (See Table G) (see Table 1) INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> Yes AND Yes AND Yes AND Yes COMPLIES Voltage drop less than Permitted by CA EIeC
<br /> Panel"A" ® El5% Code(Exception to In construction documents E-6001 El El PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br /> 130.5(c))* SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> Registration Number: Registration Date(Time: Registration Provider:Energysoft Registration Number: Registration DatefTime: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-24 10:56:22 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-24 10:56:22 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-24 10:56:22 NOR LIABILITY TO THE OTHER(EXCEPT STATED
<br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 ABOVE)UNTIL A WRITTEN AGREEMENT IS
<br /> FULLY EXECUTED BY BOTH PARTIES.
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Electrical Power Distribution Electrical Power Distribution Indoor Lighting
<br /> NRCC-ELC-E CALIFORNIA ENERGY COMMISSION NRCC-ELC-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION ARCHITECT OF RECORD
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E mcg architecture
<br /> Project Name: Starbucksl Report Page: (Page 4 of 5) Project Name: Starbucksl Report Page: (Page 5 of 5) This document is used to demonstrate compliance with requirements in 110.9 §110.12(c). 130.0 130.1 140.6 and§141.0(b)2 for indoor lighting scopes using the prescriptive
<br /> L
<br /> Project Address: 1810 Pacific Ave.Date Prepared: 3124/2020 Project Address: 1810 Pacific Ave.I Date Prepared: 3/24/2020 path• c c
<br /> cn co c
<br /> Project Name: Starbucks IReport Page: (Page 1 of 8)
<br /> Project Address: 1810 Pacific Ave.1 Date Prepared: 3/24/20201 L
<br /> H.VOLTAGE DROP DOCUMENTATION AUTHOR'S DECLARATION STATEMENT U_ v
<br /> c
<br /> *NOTES:If"Permitted by CA Elec Code*"is selected under Compliance Method above,please indicate where the exception applies in the space provided below. I certify that this Certificate of Compliance documentation is accurate and complete. A.GENERAL INFORMATIONCn
<br /> FOOTNOTES:Voltage drop calculations may be attached to the permit application outside the construction documents if allowed by the Authority Having Jurisdiction.Select"attached" Documentation Author Name: Documentation Author Signature: 01 Project Location(city) Stockton 04 Total Conditioned Floor Area(ft') 2,396
<br /> if applicable.if calculations will be the responsibility of the installing contractor,select"Contractor Responsible". Gregory R.Schnackel 111 Pacifica,Suite 280,Irvine,CA 92618
<br /> Company: Signature Date: 02 Climate Zone 12 05 Total Unconditioned Floor Area(ft2) o P:949.553.1117 F:949.474.7056
<br /> (.CIRCUIT CONTROLS FOR 120-VOLT RECEPTACLES AND CONTROLLED RECEPTACLES Schnackel Engineers,Inc. 2020-03-24 03 Occupancy Types Within Project(select all that apply): 06 #of Stories(Habitable Above Grade) 1
<br /> This table includes entirely new or complete replacement electrical power distribution systems to demonstrate compliance with 4130.5(d).Both controlled and uncontrolled receptacles Address: CEA/HERS Certification Identification(if applicable): ❑ Office ❑ Retail ❑ Warehouse El Hotel/Motel I El School 19Support Areas
<br /> 3035 South 72nd Street E-14631,M-33299ENGINEER STAMP
<br /> must be provided in office areas,lobbies,conference rooms,kitchen areas in office spaces,copy rooms and hotel/motel guest rooms. El Parking Garage El High-Rise Residential ElRelocatable 1711-Healthcare ® Other(Write in) See Table I F E S S
<br /> City/State/Zip: Phone: Q�0 /O ,9
<br /> 01 02 03 04 05 06 Omaha NE 68124 1402.391.7680
<br /> Field Ins B.PROJECT SCOPE �� y RAY Se
<br /> Room name or Location/Type of Controlled Permanent Durable Location of Requirements in Inspector RESPONSIBLE PERSON'S DECLARATION STATEMENT Q` y�i Fy
<br /> Shut-Off Controls I certify the following under penalty of perjury,under the laws of the state of California: This table includes any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in 140.6 or 9
<br /> Description Receptacles Marking Will be Used Construction Documents Pass Fail C� C�
<br /> 1. The information provided on this Certificate of Compliance is true and correct. J141.0LbL2 for alterations. CO 4 m Z
<br /> Within Eft of uncontrolled AND Auto Time-Switch with applicable
<br /> Panel"A" E-1103 2. lam eligible under Division 3 of the Business and Professions Code to accept responsibility for the buildin desi n ors stem desi n identified an this Certificate of Compliance(responsible designer) Scope of Work Conditioned Spaces Unconditioned Spaces No. E14631 m
<br /> Split-wired receptacle overrides 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified an this Certificate of Compliance conform to the requirements W
<br /> of Title 24,Part 1 and Part 6 of the California Code of Regulations.
<br /> 01 02 03 04 05 �
<br /> *NOTES:If"Other*"is selected underShut Off Controls above,please indicate how compliance has been achieved in the space provided below. g
<br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,worksheets,calculations, M Project Consists of check all that apply): Calculation Method Area ft2 Calculation Method Area ftz
<br /> Y J { { ) { )
<br /> plans and specifications submitted to the enforcement agencyfor approval with this building permit application.
<br /> J.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building.and made available to the enforcement agency for all applicable ❑ New Lighting System CTR 1 P� P
<br /> Selections have been made based on information provided in this document.If any selection have been changed by permit applicant,an explanation should be included in Table E. inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. ❑ New Lighting System-Parking Garage
<br /> Responsible Designer Name: Responsible Designer Signature: ® Altered Lighting System Area Category Method 2396 Area Category Method 0 CAL 1 F
<br /> Additional Remarks.These documents must be provided to the building inspector during construction and can be found online at � F
<br /> https://www.energy.co.gov/title24/2019standards/2019_complionce documents/Nonresidential_Documents/NRCl/ Gregory R.Schnackel P.E. Z
<br /> Company: Date Signed: Total Area of Work(ft) 2396 0
<br /> Yes No Form/Title Field Inspector Schnackel Engineers,Inc. 2020-03-24 Date. 03/24/2020
<br /> Pass Fail Address: License:
<br /> • Q NRCI-ELC-01-E-Must be submitted for all buildings ❑ ❑ 3035 South 72nd Street E-14631
<br /> City/State/Zip: Phone:
<br /> K.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Omaha NE 68124 402.391.7680
<br /> There are no Certificates of Acceptance applicable to electrical power distribution requirements.
<br /> ,?agFESsia*
<br /> `1 vtOY
<br /> z
<br /> w No. Ell 4631 r rn
<br /> Registration Number: Registration Date(Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: �q� ecTR10Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft I 1 1 Q
<br /> f of cAt-+<FO LN
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-24 10:56:22 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-24 10:56:22 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-2410:56:23 �LI N
<br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 W T
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Indoor Lighting Indoor Lighting Indoor Lighting V) U V
<br /> NRCC-LTI-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION NRCC-LTI-E CALIFORNIA ENERGY COMMISSION U)
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E
<br /> Project Name: Starbucks Report Page: (Page 2 of 8) Project Name: Starbucks Report Page: (Page 3 of 8) Project Name: Starbucks Report Page: (Page 4 of 8) bi 0 U_ Z
<br /> Project Address: 1810 Pacific Ave.Date Prepared: 3/24/2020 Project Address: 1810 Pacific Ave.Date Prepared: 3/24/2020 Project Address: 1810 Pacific Ave.Date Prepared: 3/24/20200
<br /> Q U o U
<br /> z - Q
<br /> C.COMPLIANCE RESULTS F.INDOOR LIGHTING FIXTURE SCHEDULE H.INDOOR LIGHTING CONTROLS(Not including PAFs) V U.
<br /> If any cell on this table says"DOES NOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.for guidance. 15057 36W LED 2x4 Troffer-15057 No No 39 CEC Default 6 No 234 ❑ ❑ This table includes lighting controls for conditioned and unconditioned spaces.When a control having a*is shown,the notes section of this table provides more detail on how LLI LLJ v
<br /> Allowed Lighting Power per 6140.15(b) (Watts) Adjusted Lighting Power per 140.6 a (Watts) Compliance Results 19021 30W LED 2x2 Troffer No No 30 CEC Default 2 No 60 E] E] compliance is achieved.The lighting controls section of the Compliance Summary Table on the first page will show"DOES NOT COMPLY"if the notes are left blank. U 0 O
<br /> 6
<br /> Lighting in 01 02 03 04 05 06 07 08 09 19030 8W LED Downlight-19030 No No 8 CEC Default 6 No 48 ❑ ❑ Building Level Controls 0 Q 0 CO
<br /> unconditioned
<br /> conditioned and Area Adjustments 19065 4W LED Wall Washer-19065 No No 4 CEC Default 13 No 52 ❑ ❑ 01 02 03 0 � W '^
<br /> unconditioned r �/,
<br /> Complete Area Category Tailored > Total PAF Lighting Total Adjusted 19092 5W LED Sconce-20798 No No 5 CEC Default 1 No 5 ❑ ❑ Field Inspector
<br /> spaces must not be Total Mandatory Demand Response 110.12 c Shut-off controls 130.1 c
<br /> Building Category Additional §140.15(63 = Designed Control Credits = Watts 05 must be>=OS Pass Fail
<br /> combined forAllowed (Watts) 19116 12W LED Downright-19116 No No 12 CEC Default 32 No 384 ❑ ❑
<br /> 140.6 c 1 140.6 c 2 §140.6(c)2G (+) (Watts) §140.6(a)2 *Includes 140.6 Not Required<=10 000 SF Whole Building Auto Time Switch ❑ ❑ STORE #: 5470
<br /> compliance per (Watts} 60VA Remote Power Supply- q g
<br /> §140.6(b)1 (+) (-) Adjustments 20717 No No 60 CEC Default 1 No 60 El El Area Level Controls
<br /> (See Table 1) (See Table 1) (See Table J) (See Table K) ( Sconce
<br /> See Table F) (See Table P) Serves Fixture PROJECT#: 03030-052
<br /> 20798 5W LED Sconce-20798 No No 5 CEC Default 2 No 10 ❑ ❑ 04 05 06 07 Os 09 10 11 lz
<br /> Conditioned 1,703.2 0 = 1703.2 >_ 1,525 0 = 1525 COMPLIES CASEWORK CONCEPT: CORE
<br /> 4A Current Limiter-serves
<br /> Unconditioned > = 4A Yes No 480 CEC Default 1 No 480 El El
<br /> 190s2 Fixtures Complete Building or Area Multi-Level secondary Interlocked p ISSUE DATE: CHECKSET 2-10-20
<br /> Area 130.1 a 130.1 b 130.1 c Daylighting 140.6 d §140.6(al1 PROGRAM MANAGER: M. DBREBIKA
<br /> Controls Compliance(see Table H for Details) COMPLIES Total Designed Watts:CONDITIONED SPACES 1,525 Area Description Category Area Controls Shut-Off Controls lit Primary Function Controls Daylighting Systems
<br /> Field Inspector
<br /> Rated Power Reduction Compliance(See Table Q for Details) 'FOOTNOTE:Design Watts for small aperture and color changing luminaires which qualify per§140004B is adjusted to be 75%of their rated wattage.Table F automatically makes 4130.1(d)
<br /> this adjustment,the permit applicant should enterfull rated wattage in column 05. Pass Fail STORE DESIGNER: M. DBREBIKA
<br /> D.EXCEPTIONAL CONDITIONS 2Authority Having Jurisdiction may oskfor Luminaire cut sheets to confirm wattage used for compliance per§130.0(c) Wattage used must be the maximum rated for the luminaire,not Throughout Bar/Lounge and Fine Dining Manual Dimmer See Building Level Included N/A No ❑ ❑ LEED®AP: N/A
<br /> This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. the lamp. Area ON/OFF Shut Off Control
<br /> Bar/Lounge and Fine Dining Manual See Building Level CHECKED BY: A. FELDMAN
<br /> Throughout Area ON/OFF Dimmer Shut Off Control N/A Included No El ElE.ADDITIONAL REMARKS G.MODULAR LIGHTING SYSTEMS MCG PROJECT#: 18531
<br /> This table includes remarks made b the permit applicant to the Authority Having Jurisdiction. This table calculates wattage or modular lighting s stems/track fighting fixtures indicated on Table F and transfers wattage to Table F. Bar/Lounge and Fine Dining Manual See Building Level
<br /> Y p pp y g g f g g y g gf f g Throughout Area ON/OFF Dimmer Shut Off Control N/A N/A No ❑ ❑ MCG PROJ. MANAGER: C. LEE
<br /> 01 02 03 04
<br /> F.INDOOR LIGHTING FIXTURE SCHEDULEBar/Lounge and Fine Dining Manual MCG PROJ. SPECIALIST: S.PARK
<br /> Name or Complete Track Description Calculation Method per§130.0(c)6 Track Throughout Area ON/OFF Bi-level Switch Occupancy Sensor N/A N/A No El 11This table includes all permanent designed lighting and all portable lighting in offices. Item TagWattage
<br /> iv Power supplied b *NOTES:Controls with a*require a note in the space below explaining how compliance is achieved. 13
<br /> Designed Wattage:Conditioned Spaces pP y Conference y g g: p f g g g, Revision Schedule
<br /> 4A Current Limiter-Serves 19082 i Installed Luminaires iii Overcurrent Protection EX:Con rence 1: Da li htin Exem t because less than 120 watts o general lighting;•EXCEPTION 1
<br /> 01 02 03 04 05 06 07 08 09 10 4A Fixtures vs Default 30 W/ft ® ii Current Limiter ❑ Panel ❑ driver,power supply or to 130.1 d 2 Plan Sheet Showing Daylit Znnes:
<br /> transformer)
<br /> Small Field Inspector Rev Date B Description
<br /> Name or Item Complete Luminaire Modular Watts per How is Wattage Total Number Excluded per VA of current limiter y P
<br /> Tag Description (Track)Fixture Aperture& luminaire2 determined of Luminaires140.6 a 3 Design Watts 480 I.LIGHTING POWER ALLOWANCE:COMPLETE BUILDING OR AREA CATEGORY METHODS
<br /> Color Changer Pass Fail 480
<br /> Each area complying using the Complete Building or Area Category Methods per§140.6(b) are included in this table.Column 06 indicates if additional lighting power allowances per
<br /> 96VA Remote Power Supply- 'FOOTNOTE:For power-over-Ethernet lighting systems,power provided to installed non-lighting devices may be subtracted from the total power rating of the power-over-Ethernet §140.6Lcl or adjustments per JIgg.6 a are being used.
<br /> 14410 No No 96 CEC Default 2 No 192 ❑ ❑
<br /> Serves 14410 Fixture system..
<br /> Conditioned Spaces
<br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-2410:56:23 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-2410:56:23 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.0.001 Report Generated:2020-03-2410:56:23
<br /> Schema Version:rev 20190401 Schema Version:rev 20190401 Schema Version:rev 20190401 SHEET TITLE:
<br /> T24 ENERGY
<br /> CALCULATIONS
<br /> Schnackel SCALE:AS SHOWN
<br /> eNinem, SHEET NUMBER:
<br /> NewYwk m Omaha aOmaha Los�ra Seatde a HorroolS de a Horwl u
<br /> 800-581-0%3 wwwathnia mi.00M
<br /> 80 South Lake Avenue, Suite 640 Pasadena, CA 91101 E-7001
<br /> SE J09Q: 181103