Laserfiche WebLink
PLUMBING FIXTURE SCHEDULE -"P" <br /> DESIGN ID COUNT DESCRIPTION FURN. BY INST. BY COMMENTS ©2017 STARBUCKS COFFEE COMPANY <br /> DRAIN <br /> 10294 6 DRAIN-FLOOR SINK SQUARE- 121N 305MM SB GC <br /> 10594 3 DRAIN-FLOOR SINK SQUARE-51N 125MM GC GC MFR: JR SMITH; MODEL: STARBUCKS COFFEE <br /> 2005Y02(B05 N B-P050-B) <br /> 10726 6 DRAIN-GRATE HALF SQUARE- 121N 305MM SB GC COMPANY <br /> FAUCET 2401 UTAH AVENUE SOUTH <br /> 10152 1 FAUCET-DOUBLE LABORATORY WITH BENT RISER SB GC SEATTLE,WASHINGTON 98134 <br /> SPOUT (206)318-1575 <br /> 10153 2 FAUCET-WATER TOWER- 121N 305MM SB GC <br /> 10215 2 FAUCET-DOUBLE LABORATORY WITH SWING SB GC THESE DRAWINGS AND SPECIFICATIONS ARE <br /> SPOUT CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> 10447 1 FAUCET-PRE RINSE SPRAYER WALL MOUNTED SB GC PROPERTY OF STARBUCKS CORPORATION, <br /> WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> 10597 1 FAUCET-SINGLE HANDLE THIS WORK. THEY SHALL NOT BE <br /> 10804 1 FAUCET-PRE RINSE SWING SPOUT SB GC REPRODUCED(IN WHOLE OR IN PART), SHARED <br /> 10874 1 FAUCET- HOT WATER DISPENSER GOOSENECK SB GC WITH THIRD PARTIES OR USED IN ANY MANNER <br /> 10922 1 FAUCET-MOP SINK WALL MOUNTED SB GC ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> 11003 2 FAUCET-METERED SB GC PROJECT WITHOUT THE PRIOR WRITTEN <br /> CONSENT OF STARBUCKS CORPORATION. <br /> 13588 1 FAUCET- HAND SINK WALL MOUNTED SB GC THESE DRAWINGS AND SPECIFICATIONS ARE <br /> 15749 2 FAUCET- HOT AND COLD WATER SYSTEM SB GC INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> 17569 1 FAUCET-WARE RINSER IN COUNTER-24X91N SB GC PROTOTYPICAL STARBUCKS STORE(WHICH IS <br /> 60OX235MM SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> x13588 2 FAUCET- HAND SINK WALL MOUNTED ISB IGC NOT REFLECT ACTUAL SITE CONDITIONS. <br /> FILTER NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> 12501 1 FILTER- RO SYSTEM 600GPD VD GC MFR: PENTAIR; MODEL: NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> EV997046-MRS 600 HE II RO SYSTEM FULLY EXECUTED BY BOTH PARTIES. <br /> 12507 1 FILTER- RO SYSTEM 40GAL STORAGE TANK VD GC MRF: PENTAIR; MODEL: <br /> CH34472-ROMATE 40 GALLON TANK <br /> 13076 1 FILTER- PREFILTRATION SYSTEM VD GC MFR: PENTAIR; MODEL: ARCHITECT OF RECORD <br /> EV979590-E20 PREFILTER SYSTEM mcg architecture <br /> 13082 1 FILTER-WATER SOFTENER TWIN VD GC MFR: PENTAIR; MODEL: <br /> 9100SXT/HYPRID m -59 .Z <br /> 13149 1 FILTER- PRESSURE GAUGE VD GC MFR: PENTAIR; MODEL: � <br /> EV313196-PRESSURE GAUGE <br /> Cz <br /> ASSEMBLY r" <br /> OTHER 111 Pacifica,Suite 280,Irvine,CA 92618 <br /> 13384 1 WATER HEATER TANK GAS GC GC MFR: BRADFORD WHITE OR RHEEM; P:949.553.1117 F:949.474.7056 <br /> MODEL: SCHNACKEL, PLEASE SPEC <br /> THE APPROPRIATE BRADFORD <br /> WHITE OR RHEEM GAS WATER ENGINEERSTAMP QROFESS I°N <br /> HEATER MODEL BASED ON THE o ROY SC <br /> STORES REQUIREMENTS. 'S�y9 Fti <br /> SINK co <br /> 10549 1 SINK-RINSE DROP IN SST- 12X201N 305X510MM SB GC ca 0m <br /> No. M33299 m <br /> 10995 1 SINK-MOP-24X241N 61OX610MM SB GC o <br /> 13700 1 SINK-3 COMP WORK SST- 1051N 2665MM VD GC <br /> 14688 1 SINK- HAND WITH SIDE SPLASH WALL MOUNTED SB GC FCHAN 100 <br /> SST 9TF <br /> 17565 1 SINK-RINSE WITH DRAINBOARD- 15X271N SB GC °F cA��F <br /> 380X685M M <br /> 17632 1 SINK-STACKED DRAINBOARD- 151N 380MM SB GC Date. 03/24/2020 <br /> 17650 1 SINK-DRAIN TRAY-9X61N 230X150MM VD GC <br /> 18743 1 SINK-WATER FILLING STATION-36X241N SB GC <br /> 915X610MM <br /> 19277 2 SINK-COUNTERTOP RINSER WITH DRAIN TROUGH- SB GC <br /> 26X91N 660X235MM <br /> TOILET <br /> 12951 2 TOILET-TANKLESS EFFICIENT SINGLE FLUSH GC GC <br /> 13040 2 TOILET-FLUSH VALVE AUTOMATIC EFFICIENT GC GC <br /> SINGLE FLUSH <br /> W O <br /> J N <br /> � W � <br /> Q > Q <br /> Q U <br /> U U <br /> w 06 R LL <br /> Q U o v0 <br /> GAS FIRED WATER HEATERS - Q <br /> U U <br /> U <br /> MARK LOCATION INPUT MBH GAL/HR @ 100 DEGREE RISE STORAGE CAP MANUFACTURER REMARKSO O <br /> °� Q °� o <br /> HWH-1 BOH 125 145 60 BRADFORD WHITE EF-60T-125E-3N <br /> STORE #: 5470 <br /> PROJECT#: 03030-052 <br /> EXPANSION TANKS CASEWORK CONCEPT: CORE <br /> ISSUE DATE: CHECKSET 2-10-20 <br /> PROGRAM MANAGER: M. DBREBIKA <br /> MARK LOCATION SERVES MINIMUM WORKING SIZE (APPROX) MANUFACTURER REMARKS STORE DESIGNER: M. DBREBIKA <br /> ACCEPTANCE PRESS (PSI) LEED®AP: N/A <br /> ET-1 BOH DOM. HW 4.4 150 11"0x15" AMTROL MODEL ST-12 CHECKED BY: A. FELDMAN <br /> MCG PROJECT#: 18531 <br /> *NOTE: CONTRACTOR SHALL ADJUST PRE—CHARGE OF EXPANSION TANK TO EQUAL INCOMING WATER PRESSURE PRIOR TO INSTALLATION. MCG PROJ. MANAGER: C. LEE <br /> MCG PROJ. SPECIALIST: S.PARK <br /> PUMPS Revision Schedule <br /> Rev Date By Description <br /> MOTOR DATA <br /> MARK LOCATION SERVICE GPM HEAD RPM TYPE MFR. REMARKS <br /> (FT.) HP VOLTS PH CYC. <br /> P-1 BOH DOM. HW 2.5 10.5 1/20 115 1 60 2800 INLINE B & G MODEL: NBF-12F/LW <br /> P-2 BOH BOOSTER — — 3/4 208 1 60 1 2800 INLINE GRUNDFOS MODEL: CRE-1 SHEET TITLE: <br /> PLUMBING SCHEDULES <br /> Scac e <br /> hn k l SCALE:AS SHOWN <br /> eNinem® SHEET NUMBER: <br /> NewYork a Omaha a Los Angeles a Seattle a Honolulu <br /> 800-581-0963 wwwJwhmK L00m <br /> 80 South Lake Avenue, Suite 640 Pasadena, CA 91101 P-1 000 <br /> SE JOW: 181103 <br />