GENERAL PLUMBING NOTES PIPING INSULATION VALVES
<br /> Scope Soil,Waste,and Vent Piping Water Piping General
<br /> p
<br /> The intent of the Specifications and the Drawings is to provide a complete and fully operational Sail,Waste and Vent piping 10"and smaller shall be service weight,hubless,cast iron pipe, Provide thermal insulation on all hot and cold water,and horizontal waste piping in ceiling Plumbing Contractor to provide valves where indicated on plans and as necessary for
<br /> plumbingstem. The Contractor shall furnish all labor,material,and equipment related to the and fittings with neoprene gasket and stainless shield and clamp.provide hub and spigot, spaces,and on all cold water piping in casework and bar areas. Use self sealing closed cell proper system operation and component isolation. Install valves for each fixture and item
<br /> system. foam orjacketed fiberglass insulation with manufacturer approved adhesives,sealers,and of equipment. Provide braided stainless steel hose unless otherwise noted between
<br /> installation of the plumbing work. servive weight cast iron soil pipe and fittings below grade where required by local codes. � g PP ( )
<br /> Schedule 40 ABS and PVC pipe and fittings with solvent weld may be substituted for soil,waste, coatings. All materials used shall not exceed 25 for flame spread,50 for fuel contributed,or 50 valve and equipment in accordance with manufacturer's specifications. Locate shut-off
<br /> Site Examination and vent piping above and below grade if allowed by local authority.All horizontal runs shall for smoke developed. Unless otherwise required by the local authority or energy codes,the valves adjacent to equipment for easy access such that valves can be reached without
<br /> The Contractor shall thoroughly examine all areas where fixtures,equipment,and piping will be drain at a grade of 1/4"per foot where possible but in no case less than 118"per foot. minimum insulation levels shall be as follows" moving equipment. Shut off valves to be ball type.
<br /> installed and will report any condition that,in his opinion,prevents the proper installation of the Coordinate with local authorities for drainage requirements for equipment designated with Pipe Size(diameter) Insulation Thickness ©2017 STARBUCKS COFFEE COMPANY
<br /> plumbing work. indirect waste to floor drains.provide piped drain to sanitary if required by local jurisdiction. Less than or equal to 11/2" 1" Valves
<br /> 2"or greater 111211 Provide valves for working pressure in water piping of 125 PSI or greater. Unless noted
<br /> Domestic Water and Piping otherwise valves shall be as follows: STARBUCKS C O F F E E
<br /> Standards Domestic water piping 2112"and smaller shall be copper tube with wrought capper sweat (Insulation Value=k value not exceeding 0.027 BTU per inch/h*ft2*f) Valve Type Manufacturer Model No.
<br /> Equipment and materials shall conform with the appropriate provisions of CSA, ULC,ASME, fittings joined with non-lead,non-antimony solder. Profive type"L"copper tube above grade COMPANY
<br /> ASTM,UL, NEMA,ASHRAE, NFPA,as applicable to each individual unit or assembly. Safety Covers Check Valve(up to 2 } Nibco #S-22
<br /> PP Y and type X"below grade. 2401 UTAH AVENUE SOUTH
<br /> Install specified no scald safety covers with insulated foam liner and tamper proof strap as Full Port Ball Valve(up to 3"} Nibco #S-FP-600 SEATTLE,WASHINGTON 98134
<br /> Codes furnished by Starbucks at all exposed piping. Gate Valve(up to 3") Nibco #S-113
<br /> Condensate Drainage Piping (206)318-1575
<br /> All work shall be performed in strict accordance with all applicable provincial and local codes The Plumbing Contractor shall provide condensate drains for air handling units and Starbucks Temperature and Pressure Relief Valve Wilkins #TP1100A
<br /> Ice Bin Drain Water Hammer Arrestor Wilkins #1250 THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> and ordinances. In case of conflict between the drawings and specifications and the codes and equipment(refer to schedule).Condensate drainage piping shall be type"M"copper tubing with Insulate ice bin copper drain lines with 1/2"thick,self sealing,sectional,closed cell foam. Backflow Preventer(whole-house) Wilkins #950XLU CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> ordinances,the highest standard shall apply. The contractor shall satisfy code requirements as wrought copper sweat fittings joined with 50/50 solder.
<br /> a minimum standard without an extra cast to Starbucks. Backflow Preventer(single device) Wilkins #700 PROPERTY OF STARBUCKS CORPORATION,
<br /> Y HVAC Piping Vacuum Relief Valve Wilkins #35VCH WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> Natural Gas Piping Insulate refrigerant suction piping and cooling coil condensate piping with 3/4"thick,self THIS WORK. THEY SHALL NOT BE
<br /> WarrantyGas Piping shall be Schedule 40 seamless, black steel pipe.Provide piping support blocking Pressure Reducing Valve Wilkins #2699-1 R
<br /> P g P�P P�P g PP g sealing closed cell foam. Insulate HVAC hot and chilled water piping systems and low pressure REPRODUCED(IN WHOLE OR IN PART) SHARED
<br /> The Contractor shall unconditionally warrant all work to be free of defects in material and on roof,compatible with roofing system. steam and condensate piping with 11/2"thick,heavy duty,self sealing,jacketed fiberglass. Trap Seal Primer J. R.Smith #2699-1 WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> workmanship for a period of one year from the date of final acceptance by Starbucks and will ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> repair or replace any defective work promptly and without charge and restore any other existing Hangers and Supports Rain Conductors Supply PROJECT WITHOUT THE PRIOR WRITTEN
<br /> work damaged in the course of repairing defective materials and workmanship. The Plumbing Contractor shall furnish all pipe supports required for equipment and material.All Insulate rain water conductors which pass through occupied areas with 1/2"thick fiberglass. If water pressure supplied to store is greater than 65 PSI,then provide a prssure regulator CONSENT OF STARBUCKS CORPORATION.
<br /> horizontal runs of piping shall be supported by pipe hangers installed as required by local to main supply to maintain water pressure. Provide backflow prevention on water service THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> codes,additional supports shall be provided where required to prevent sagging. Hangers and if required by local codes. PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br /> pipe attachments to be factory fabricated with galvanized coatings;non-metallic coated for SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> hangers in direct contact with copper tubing. NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> Connections NOR LIABILITY TO THE OTHER(EXCEPT STATED
<br /> Install unions adjacent to each valve and at final connection to each piece of equipment. Install ABOVE)UNTIL A WRITTEN AGREEMENT IS
<br /> FULLY EXECUTED BY BOTH PARTIES.
<br /> dielectric couplings to connect piping materials of dissimilar metals. Screw joint steel piping up
<br /> to and including 1 112".Weld piping use non-lead,non-antimony solder for soldering domestic ARCHITECT OF RECORD
<br /> water copper pipe. mcg architecture
<br /> Cleanouts S Y M B � S o g CD
<br /> Provide J.R.Smith or equivalent floor and wall cleanouts as indicated on the drawings or where P L U M B I N G z
<br /> required by code in all soil,waste,and drain lines. In areas with ceramic tile or carpeted LZ
<br /> flooring,provide cleanouts with square,adjustable,nickel bronze top with tile recess. Cleanouts SYMBOL DESCRIPTION SYMBOL DESCRIPTION
<br /> its
<br /> shall be same size as pipe except that cleanouts larger than 4"will not be required. Where SANITARY DRAIN ABOVEGROUND p CLEAN OUT
<br /> cleanouts occur in walls of finished areas,the shall be concealed behind chrome laced SANITARY DRAIN BELOWGR❑UND � GRADE CLEAN OUT
<br /> Y P - — — - Gco 111 Pacifica,Suite 280,Irvine,CA 92618
<br /> access Covers. Gw GREASE WASTE ABOVEGROUND --}1WCn WALL CLEAN OUT P:949.553.1117 F:949.474.7056
<br /> — —Gw— — GREASE WASTE BEL❑WGR❑UND N.I.C. NOTIN CONTRACT
<br /> Installation AW ACID WASTE ABOVEGROUND VTR VENT THROUGH ROOF
<br /> — —Aw— — ACID WASTE BELOWGR❑UND �� BALL VALVE ENGINEER STAMP oFESSi
<br /> Install exposed piping free of sags and bends. Provide bracket standoffs from mounting 19 O
<br /> surfaces to allow 1"of cleaning space all around piping,including any added piping insulation. — — VENT LINE CHECK VALVE �p y ?,oy Sc
<br /> —AV—— ACID VENT
<br /> Install fittings for changes in direction and branch connections. Install sleeves for pipes passing —WAGD— WASTE ANESTHESIA GAS DISP❑SAL PRESSURE REGULATING VALVE (PRV)
<br /> through concrete and masonry walls,gypsum board partitions,concrete floor and roof slabs. %
<br /> S STORM DRAIN ABOVEGROUND $ GAS COCK No. M3329 n
<br /> Seal pipe penetrations through rated construction with fire stopping sealant material. _ W
<br /> —S— — STORM DRAIN BELOWGR❑UND PRESSURE REGULATING VALVE (PRV)
<br /> Underground water and sewer lines shall be laid in separate trenches with a minimum horizontal ps OVERFLOW STORM DRAIN AND GAS COCK
<br /> spacing as required by code,excavated to the proper depth and graded to produce the required - COLD WATER (CW) MIXING VALVE , FCHC,
<br /> fall. -- HOT WATER (HW) GAS COCK
<br /> ----- HOT WATER CIRCULATING (HWC) VALVE IN RISE OF CA0F
<br /> Testing -140---- HOT WATER 1400 AUTOMATIC BALANCING VALVE
<br /> All pipes shall be tested by an approved method before they are backfilled or concealed. After -140°----- HOT WATER CIRCULATING 140° —0 G RUNNING TRAP Date. 03/24/2020
<br /> testing is complete,the Plumbing Contractor shall disinfect the potable water system as -T --- TEMPERED WATER HB HOSE BIBB
<br /> required by local authority. Test water purity according to local requirements and submit -T----- TEMPERED WATER CIRCULATING WH WALL HYDRANT
<br /> certified test results to engineer for review and approval. -CS -- COLD SOFT WATER FH FIRE HYDRANT
<br /> -HS---- HOT SOFT WATER V.C.P. VITRIFIED CLAY PIPE
<br /> -HS----- HOT SOFT WATER CIRCULATING C.I. CAST IRON
<br /> F FIRE LINE I.E. INVERT ELEVATI❑N
<br /> G GAS LINE B.F.F. BELOW FINISHED FLOOR
<br /> A COMPRESSED AIR LINE PLUMBING RISER NUMBER
<br /> v VACUUM LINE
<br /> nx OXYGEN LINE DOWNSPOUT NOZZLE 0
<br /> D CONDENSATE LINE ORD ROOF DRAIN/OVERFLOW ROOF DRAIN W ^'
<br /> /J LO
<br /> Q U
<br /> U) 0011
<br /> Ed 06 E E: z
<br /> Q U o v0
<br /> Z - Q �
<br /> Q
<br /> 1— LL I-
<br /> L)
<br /> — w U
<br /> U _-) 00
<br /> °� Q °� o
<br /> W
<br /> STORE #: 5470
<br /> PROJECT#: 03030-052
<br /> CASEWORK CONCEPT: CORE
<br /> ISSUE DATE: CHECKSET 2-10-20
<br /> PROGRAM MANAGER: M. DBREBIKA
<br /> STORE DESIGNER: M. DBREBIKA
<br /> LEED®AP: N/A
<br /> CHECKED BY: A. FELDMAN
<br /> MCG PROJECT#: 18531
<br /> MCG PROJ. MANAGER: C. LEE
<br /> MCG PROJ. SPECIALIST: S.PARK
<br /> Revision Schedule
<br /> Rev Date By Description
<br /> SHEET TITLE:
<br /> PLUMBING
<br /> SPECIFICATIONS
<br /> SCALE:AS SHOWN
<br /> Schnackel
<br /> eNinem® SHEET NUMBER:
<br /> NewYwk a Omaha a LosAr4Wu a Seattle a Honolulu
<br /> 800-581-0%3 wwwschnadaer 000
<br /> 80 South Lake Avenue, Suite 640 Pasadena, CA 91101 P-0004
<br /> SE JOW: 181103
<br />
|