Laserfiche WebLink
SHEET LEAD FLASH/NG MDP <br /> IN WI TH ROOF/NG MA TERIAL N► <br /> TURN LEAD DOWN INTO FAUCET HOOKUP PO/NTS TRIPLE COMPARTMENT <br /> (TYP/CAL) SCULLERY SINK <br /> N STA CK (CANNO T RESTRICT OPTIONAL DRAIN BOARDS <br /> z <br /> FLOW OF AIR) VENT CAP BACK SPLASH <br /> ROOF/NG <br /> INSULA TION ° ° SLOPE FLOOR TO <br /> ©2017 STARBUCKS COFFEE COMPANY <br /> FLOOR DRAIN <br /> STARBUCKS, COFFEE <br /> VENT LINE FLOOR DRAIN FLOOR SING SET FLUSH <br /> W' TOP FIN. FSR. <br /> COMPANY <br /> RAIN PLUG LEVER a <br /> a- -a <br /> _4<- CAULK JOINT <br /> THIN SET CERAMIC INDRECT WASTE LIE 2401 UTAH AVENUE SOUTH <br /> ROOF CONSTRUCTION a_ .a a , gyp, <br /> FROM FlXT. REF PLAN SEATTLE,WASHINGTON 98134 <br /> a --- a (206)318-1575 <br /> SLEEVE ROOF CONSTRUCT/ON ` <br /> >> =1 I I1 I I1 11 I I1 <br /> MIN. 12 AS REQUIRED (PRO VIDE FIRE 2" (TYP/CAL) —IIIIII=III III=III= •°• ' •°• °• • °• CONC. INFILL ! TRENCH '---SET SCREW THESE DRAWINGS AND SPECIFICATIONS ARE <br /> RA TED CAULK/NG WHEN ! •.• FOR BELOW GRADE CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> LEANourIII—III '�•• UTILITIES TWICE THE DIAMETER NO-HUB OUTLET AR PROPERTY OF STARBUCKS CORPORATION <br /> REQUIRED BY L OCAL CODES) 11 • •• • • R. SUE VARM <br /> • • ►.• • ►.• • ► OF INLET, MN. ACCORDING TO WASTE WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> INCREASER (WHEN REQUIRED) LINE SIZE THIS WORK. THEY SHALL NOT BE <br /> III=III= REPRODUCED(IN WHOLE OR IN PART) SHARED <br /> VENT STACK OR STACK VENT =III—IIIA GRAVEL BACKFILL NO-HUB CONNECTION OR ' <br /> SPIGOT OUTLET AS ALLOWED WITH THIRD PARTIES OR USED IN ANY MANNER <br /> NO-IUB CONNECTION ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> HUB & SPIGOT TYPE PIPE SHOWN I I �I I WASTE LINE TO RISER PROJECT WITHOUT THE PRIOR WRITTEN <br /> NO—HUB ALSO APPL/CABLE FLOOR SINK �� �— �� OR GREASE INTERCEPTOR CONSENT OF STARBUCKS CORPORATION. <br /> P—TRAPTRAP WATER LEVEL <br /> 3" WASTE TO DRAIN AS REQ'D. THESE DRAWINGS AND SPECIFICATIONS ARE <br /> INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> ENT TERMINATION LEAD FLASHING THREE COMPARTMENT SINK DETAIL FLOOR DRAIN DETAIL FLOOR SINK DETAIL PROTOTYPICAL <br /> SOUBJO CT O CHANGE ATANYT ME AND OS <br /> qYKN.T.S. 6 CJ 4 AIR BREAKER DETAIL NOT REFLECT ACTUAL SITE CONDITIONS. <br /> N.T.S. N.T.S. N.T.S. 3 N.T.S. <br /> NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> NOR LIABILITY TO THE OTHER(EXCEPT STATED <br /> ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> FULLY EXECUTED BY BOTH PARTIES. <br /> ARCHITECT OF RECORD <br /> mcg architecture <br /> O -u N <br /> — <br /> C <br /> U U <br /> c <br /> cc <br /> cn <br /> 111 Pacifica,Suite 280,Irvine,CA 92618 <br /> P:949.553.1117 F:949.474.7056 <br /> ENGINEERSTAMP QROFESS/O <br /> ��O ply ROY SCy�Y,9` Fr <br /> DRAIN LINE FROM SINK TO WASTE C/0 0� �r- z <br /> LINE IN WALL OR FLOOR DRAIN �' No. M33299 m <br /> 3"COMBUSTION AND FLUE o <br /> PIPES, ROUTE THROUGH ROOF HOT AND COLD WATER FOR <br /> AND PROVIDE TERMINATION KIT SINK FAUCET FCHAN ICP �P <br /> PER MANUFACTURER. LOCATE qT <br /> AT LEAST 10' FROM ANY FRESH BACK WALL F OF CAL SFO <br /> AIRE INTAKES OR OPERABLE <br /> EXPANSION TANK DOORS AND WINDOWS <br /> INDIRECT DRAIN LINE FROM Date. 03/24/2020 <br /> TO HOT WATER FIXTURES. PROVIDE BRASS CHECK VALVE SAN ITIZER TO NEARESTFLOOR DRAIN OR MOP SINK. <br /> POINT-OF-USE THERMOSTATIC MIXING <br /> VALVES AT HAND SINKS(SEE PLAN) — WATER FOR SAN ITIZER WITH <br /> GAS LINE, <br /> HOT WATER OUTLET(SEE PLAN FOR SIZE) SHUT-OFF UNDER SINK AT 18" <br /> SEE PLANS (460MM)AFF. LINE LENGTH MUST <br /> C� FOR SIZE ALLOW EASE OF MOVEMENT. <br /> VERIFY WATER REQUIREMENTS <br /> SIZE PER PLAN PROVIDE SEISMIC FOR TYPE OF DISHWASHER <br /> STRAPS ONLY IN (HOT/COLD/SOFTENED).SEE <br /> UNION (TYP.) V SEISMIC AREAS WATER SUPPLY DRAWINGS FOR q;T <br /> WATER LINE. w O <br /> HOT WATER TANK I RO STORAGE TANK DRAIN LINE FROM DISHWARE N <br /> (SEE SPECIFICATIONS&HOT WATER _j N <br /> TANK DETAIL FOR FURTHER — — -- DRYING FLACKS TO SINK BOWL ^ W <br /> INSTALLATION REQUIREMENTS) SEE PLUMBING PLAN FOR FINAL <br /> TO DISHWASHER(IF HOBART ADVANSYS I FLOOR DRAIN LOCATION. . . Q <br /> UNIT). SEE NOTE 2 BELOW. 1 1/2"(15mm) FLOOR DRAIN OPTIONAL. U <br /> CONCEALED COPPER PIPING(TYP.) <br /> 1"(25mm)BYPASS CHROME ESCUTCHEONS(TYP.) 1off u.i WFL Z <br /> BOOSTER PUMP AND GFCI 120V I 1/2"(15mm) BRASS THREADED BALL SHUT-OFF � <br /> RECEPTACLE IF REQUIRED 8" 6' 5° 1/2"(15mm)FIP VALVE(TYP.)MAX 72"(1829mm)AFF Q r , p U O <br /> POINT OF USE FILTER LOCATED ALIGN Z Q <br /> COLD SOFT WATER(SEE PLAN FOR SIZE) I 3/4"(20mm) AT ICE MACHINE I__ <br /> U. U <br /> EMERGENCY BY-PASS — 1/2"{15mm) UNION (TYP.) W 1 W O 0 <br /> GFCI 120V QUAD RECEPTACLE FOR FILTER 1/2"(15mm) Q V Q r O <br /> SYSTEM 78 TO ICE MACHINE(1981 mm)AFF{NOTE 3) 0 I "I"or f T U) <br /> TO FILTERED FIXTURES(ESPRESSOS, BREWERS, 11 T 11 11 <br /> PEX PIPING TYP. (SEE NOTE 2) HOT TAP,WATER TOWER, CHILLER, ETC.) I T <br /> 17— +11— STORE #: 5470 <br /> 1/2"(15mm)FIP(FEMALE INTERNATIONAL CITY WATER IN <br /> PIPE THREAD FITTING)(TYP.2) � — PROJECT#: 03030-052 <br /> CW(SEE PLAN FOR SIZE) <br /> RO CONTROL SYSTEM(NOTE 5) TO NON FILTERED FIXTURES CASEWORK CONCEPT: CORE <br /> PRE-FILTER IN IN UT <br /> TIN (TOILETS, HAND SINKS, DIPPER _ <br /> ISSUE DATE: CHECKSET 2-10-20 <br /> WELLS, HOSE BIBBS, ETC.) C° PROGRAM MANAGER: M. DBREBIKA <br /> 2 1/2"(65mm)CLEARANCE I� GFCI 120V RECEPTACLE FOR FILTER STORE DESIGNER: M. DBREBIKA <br /> REQUIRED FOR FILTER REMOVAL a SYSTEM 54"(1372mm)AFF(NOTE 3) LEED®AP: N/A <br /> LO CD E a 3/4"(20mm) CHECKED BY: A. FELDMAN <br /> ti E 3/4"(20mm)FIP(TYP.2 TO SOFTENER) MCG PROJECT#: 18531 <br /> =f14, <br /> MCG PROJ. MANAGER: C. LEE <br /> co <br /> WATER SOFTENER HEAD AND TANKS(BACK) <br /> NOTE: MCG PROJ. SPECIALIST: S.PARK <br /> BRINE TANK(FRONT) FOR COORDINATION ONLY. SEE <br /> PROVIDE WATER SOFTENER DRAIN INSTALLED FURNITURE, FIXTURES,AND <br /> PER CODE (NOTE 4) EQUIPMENT PLAN FOR EQUIPMENT Revision Schedule <br /> MOP SINK 18"Wx24"Dx6"H (455mmWx610mmDx150mmH) LOCATIONS. PROVIDE BACKING <br /> RACK PROVIDED WITH UNIT BEHIND WALL FINISH AS REQUIRED Rev Date By Description <br /> FOR WALL MOUNTED EQUIPMENT. <br /> NOTES: REFER TO ITEM SPECIFICATIONS FOR <br /> 1.ALL COMPONENTS DRAWN IN BOLD ARE GC RESPONSIBILITY. GC TO COORDINATE INSTALLATION OF ALL OTHER COMPONENTS SHOWN WITH FILTER VENDOR. MORE INFORMATION. <br /> 2.ALL PIPING SHALL BE COPPER EXCEPT PEX TYPE PIPING IS ACCEPTABLE BETWEEN FILTER SYSTEM COMPONENTS AND ADVANSYS DISHWASHER WHERE <br /> ALLOWED BY CODE. <br /> 3. COORDINATE WITH ELECTRICAL CONTRACTOR FOR RECEPTACLES. <br /> 4. PROVIDE WATER SOFTENER INDIRECT DRAIN TO SINK, INSTALLED PER CODE. (CONFIRM REQUIREMENTS WITH SOFTENER EQUIPMENT CUTSHEETS IN ITEM SHEET TITLE: <br /> SPECIFICATIONS). <br /> 5. PROVIDE RO INDIRECT DRAIN TO SINK INSTALLED PER CODE. (CONFIRM REQUIREMENTS WITH RO EQUIPMENT CUTSHEET IN ITEM SPECIFICATIONS). KEEP CLEAR FOR WALL MOUNTED CHEMICAL DISPENSING ALIGN COMPARTMENT SINK SANITIZER PLUMBING DETAILS <br /> 6. IN MUNICIPALITIES WITH BRINE RESTRICTIONS, REFER TO THE WATER SYSTEM CONFIGURATIONS APPENDIX UNDER ITEM SPECIFICATIONS FOR WATER SOFTENER Elevation View SYSTEM,TO BE INSTALLED BY SYSTEM VENDOR. PROVIDE <br /> EXCHANGE TANK SCHEMATIC. BACKING BEHIND WALL FINISH FOR EQUIPMENT MOUNTING. <br /> 7. COMPONENTS ARE TO BE POSITIONED TO MAXIMIZE ACCESS FOR REGULAR SERVICING. PRE-FILTER, BYPASS VALVES,AND SOFTENER TANKS MUST BE INSTALLED 72" REFER TO POSTED INSTALLATION GUIDELINES FOR MORE SCALE:AS SHOWN <br /> (1828MM)AFF OR LOWER. khnackel <br /> INFORMATION. <br /> _ eNinem® SHEET NUMBER: <br /> CONFIGURATION III SANITIZING GENERIC - PLUMBINGNewYork a Omaha a Los Angeles oSeattle o Honolulu <br /> 2 1 N.T.S. 80 South Lake Avenue, Suite 640 Pasadena, CA 991-0963 I 111 <br /> 1/2"— V-0" <br /> Scale: — 101 <br /> P-1103 <br /> SE JOBQ: 181103 <br />