Laserfiche WebLink
COVER <br /> FINISHED ADJUSTING FOR WALL CONST. FLASHING SHALL BE FORMED TO CHIPPED CONCRETE WITH A POSITIVE SLOPE <br /> FLOOR COLLAR SEE ARCH. DWGS. TO CLAMP DEVICE. PROVIDE NON- SHRINK SPOUT UNDER FLASHING AS <br /> �� REQUIRED TO FACILITATE POSITIVE SLOPE (ANY FLASHING MATERIALS OTHER <br /> a MAY EXTEND AS CLEANOUT PLUG THAN LEAD IS UNACCEPTABLE. MINIMUM WIDTH OF FLASHING SHALL BE 24"). <br /> WASTE OR VENT <br /> A COUNTERSUNK ADJUSTABLE <br /> SCREW FINISH FLOOR <br /> CLEANOUT TEE 11"AFF TO COUNTER STRAINER SLOPE TO DRAIN - - <br /> CLEANOUT PLUG RISER - ° <br /> AND BODY. POLISHED S.S. ° - a <br /> Duudfl Mpw <br /> 0 SEE SPECS. 1/8 BEND FULL a a ° ACCESS COVER o- v - - = ° ° ivl <br /> d SIZE, 4" MAX. d a ° _ o_ <br /> A , v tea_ —e <br /> PLUG IF END co <br /> CAST IRON — <br /> OF LINE WASTE LINE FLOOR DRAIN <br /> FLOW SUIT WITH LENGTH TO SURE SEAL <br /> CORE DRILL 10"0 TRAP GUARD <br /> U_ <br /> ° A4 AND 4 HOLES <br /> A v a THREADED OR CAULK <br /> CONCRETE v 1/8 BEND AT OUTLET <br /> ENCASEMENT ° END OF LINE OUTLET <br /> FLOW­411111111--- <br /> ° CLEANOUT <br /> NOTE: WASTE LINE <br /> Co <br /> CLEANOUT COVER FLUSH WITH TILE OR FLUSH NOTE: THE GENERAL CONTRACTOR SHALL PROVIDE A ONE PIECE WATER <br /> WITH CONCRETE FLOOR IN AREA WITH NO TILE. a ° CONCRETE PROOF MEMBRANE FLOOR AND BASE IN THE TOILET ROOM(S). <br /> o ENCASEMENT FLOOR DRAIN W TRAP GUARD <br /> — <br /> FLOOR CLEAN — OUT DETAIL WALL —CEA OUT DETAIL <br /> SCALE: NTS SCALE: NTS SCALE: NTS <br /> 'D GNICH <br /> FLASHING SHALL BE FORMED TO CHIPPED CONCRETE WITH A POSITIVE SLOPE <br /> TO CLAMP DEVICE. PROVIDE NON- SHRINK SPOUT UNDER FLASHING AS ARCHITECTURE <br /> THANI LED DTIS O FACILITATE POSITIVE MEN SLOPE WIDTHNY FLASHING <br /> LASHINGMATERIALS <br /> HALL OTHER <br /> 24"). S P E C I F I CATI ON AND S U B I I TTA L S T U D 1 0 <br /> O AN OREGON LIMITED LIABILITY COMPANY <br /> U <br /> N <br /> NOTE: ADJUSTABLE FINISH FLOOR <br /> CL ALL EXPOSED PIPING SHALL 1/2" CW STRAINER SLOPE TO DRAIN B -5050/ GPM Grease Interceptor for Indoor f Outdoor Use <br /> co BE CHROME PLATED TO TRAP ° <br /> Q PRIMER <br /> C <br /> rte__ 1001 SE SANDY BLVD, SUITE 100 <br /> RESTROOM - ° r' <br /> LAVATORY o- 7° �� PORTLAND, OR 97214 <br /> STOP VALVE TRAP PRIMER WITH CAST IRON - V. 503.552.9079 <br /> 12 CHROME FINISH PPP# FLOOR DRAIN F. 503.241.7055 <br /> PR01-ULP500 WITH r <br /> WWW.GNICHARCH.COM <br /> TURN TRAP PRIMER - - . <br /> DU-4 CORE DRILL 10"0 <br /> DRAIN LINE AND 4"0 HOLES 9 %, �•• y <br /> INTO WALL COLD WATER THREADED OR CAULK (z7`r"r II O1.13.21 <br /> TYPE 'K' COPPER OUTLET <br /> KEEP MINIMU TUBING - NO JOINTS OUTLET T <br /> Q BELOW FLOOR ESSI <br /> 2B%" <br /> �' <br /> 7FLOOR DRAIN WITH <br /> a, TRAP PRIMER 1/2" NOTE: THE GENERAL CONTRACTOR SHALL PROVIDE A ONE PIECE WATER �31 <br /> CONNECTION PROOF MEMBRANE FLOOR AND BASE IN THE TOILET ROOM(S). SB` <br /> W3Ws it <br /> TRAP PRIMER PIPING DETA L FLOOR DRAIN W, TRAP PRIMERcli ' +3`jq�0Hp�4�� t <br /> Cm SCALE: NTS SCALE: NTS F C <br /> TURN FLASHING DOWN t71u"1 <br /> 1" INTO VENT STACK <br /> Tres uNI Is camFisd t A ATT2.343(TWO C:)MO <br /> U CSA B4311 arxi voudas nn rrr <br /> Yrigal flare Lar-aral <br /> EXTRA DEEP ACCESS HEAVY—DUTY SECURED -,rcmcpomcorvorvmhti,irtnmroqare-1 <br /> Q <br /> COVER <br /> GASKETED ABS <br /> m SHEET METAL SURFAC CLEANOUT PLUG 5 U B M ITTAL <br /> FLASHING, options <br /> Ln <br /> MOP W/ Rt <br /> ROOFING z :' t�cation it _Kirfautds]Crrbnd <br /> MATERIAL ., Ir�f iertiarr Mavo_ ibMaw gode L p� � g (�a"'•,T) ❑ctt 1420 a lep- Ea pack4t cnsc ir�n Q <br /> Flow'NO*4afraer+Capacimm PLAW-111i Y{719 mm) ❑CC2�rnerr&cone cfumpiny_xxi-rx Ivt <br /> N SLAB �— r*•+r;3-?zls) �e abs p0in end flaing ❑p�F'.z11pcU1 Port Q) O <br /> I FD CON CRET ANCHOR FLANGES solid:CqXhtfty'r2.5 y ❑F1111117-U-112:3,x T(TS mm x SO mm) ❑AKI:•rgr Ww&Anchor r N <br /> ROOFING Liquid Co! itr 52 gal. FRT 10irlg Fkm CIA Rim 0 Q <br /> PIPE SIZEW�igNe_ _ <br /> YACCESS COVER WITH CLEANOUT Cannectians: i �!t!r]fpkrY4]pt�rlfMl[1 <br /> [[F"-EA-34:4"n 3'(]00 rrMY;s x 76 MM) D ERM 5- - 23-tiierm cut riser C-0 <br /> Cancer:kxAed gnslwmer b*1 rcoi 3nxife FPT Iftrig [I Ut A 323'- 3K meld tut riser <br /> VENT PIPE READIED <br /> COUNTTETR UNK v0)Id.00Dt't�rut� <br /> a LUG <br /> OVER dere yml O <br /> CLEANOUT "'f �"" <br /> .E SIr�Iuf�: ClrSte. COrrrpaarty� co <br /> -p <br /> Sptrttyirar�Err��hrcr. Engirrerrir,y::rrrY O v> <br /> a, COUNTERSUNK SCREW O <br /> SANITARY STACK i <br /> C <br /> HIER IrLOELt+lU16A�: CIE�clllrTfDM:sOcf�alP�Iryrrsstriylar�Cxir4selntercepLar <br /> U_ <br /> Lop Ll F ETIBM E g n3` <br /> m CPREASE v =T#142rrOTF-01 6WC BY:H.rCarror GATE 3{3t2F5T9 REY ECS?. W <br /> SLEEVE OOF CONSTRUCTION PIPE SIZE Z <br /> AS REQUIRED CLEANOUT TEE & ACCESS COVER <br /> O N CN <br /> °J � Pagr 1 of e Q) Q) CV <br /> �_ <br /> FIRE RESISTANT PACKING VENT STACK NOTE:INSTALL CLEAN OUTS SO BOTTOM IS AT LEAST 7"ABOVE z O <br /> o "3M" OR EQUAL FINISHED FLOOR. 01 <br /> GREASE INTERCEPTOR o � <br /> VENT TO ROOF DETAIL CLEAN — OUT DETAILS_0 <br /> O <br /> SCALE: NTS 0 > � m <br /> SCALE: NTS SCALE: NTSQ m <br /> � � � <br /> O � O <br /> SHUT OFF VALV EXISTING HWR PIPE o0Q <br /> N Q i 0 i <br /> FULL PORT BALL VALVE <br /> AIR RELIEF VALVE <br /> E ISSUED FOR PERMIT: <br /> Eo BY PLUMBING CONTRACTOR <br /> .3 DRAIN LINE STRAINER PRESSURE <br /> COCK <br /> EXTERIOR BUILDING WALL. 01 • 13.BY GAS 2021 <br /> 1 <br /> E FLOOR GRATE TO BE \ GAS METER OF CFH GAS PIPE UP PENETRATE WALL <br /> LcoFLUSH WITH D NEW INLINE HWR PUMP, AS NOTED. CAPACITY SHOWN G ROUTE PIPING ABOVE CEILING <br /> a FINISHED FLOOR �I VERIFY PROPER PUMP ROTATION. ON PLANS SIZE AS SHOWN ON PLAN. <br /> `° MOUNT FLUSH �� USE BLACK STEEL PIPE. <br /> Q FROM GAS SUPPLY WITH FINISHED CREASE <br /> ASEPE IN-R ANCHOR RISER TO WALL AT <br /> Q FLOOR TEN FOOT INTERVALS USING <br /> a C V OFFSET RISER PIPE CLAMPS. EV: DATE: DESCRIPTION: <br /> AIR GAP=2X"D" V ° <br /> CD <br /> 1/2" C (2" MIN) m BYPASS VALVES PIPE INCREASER AND UNION <br /> TO TRA SWING CHECK VALVE STRAINER PROVIDE 6" LONG DIRT <br /> o PRIMER PAVEMENT LEG AT BOTTOM OF RISER. <br /> CZ <br /> TO APPLIANCE <br /> CD <br /> FLOOR <br /> G PRESSURE REGULATOR TO REDUCE PRESSURE TO 14"WC. <br /> FULL PORT BALL VALVES SHEET NAME: <br /> o TYPICAL SHUT-OFF VALVE <br /> VERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. <br /> DIRT LEG / EXISTING HWR PIPE INSTALL OTHER UTILITIES MINIMUM TEN FEET FROM GAS LINE. PLUMBING <br /> CONTRACTOR SHALL PAY ALL GAS COMPANY FEES FOR INSTALLATION. PLUMBING DETAILS <br /> o USE WELDED OR SCREWED PIPE AND FITTINGS PER PLUMBING SPECS. <br /> GAS COMPANY SHALL EXCAVATE, BACKFILL,AND REPAIR ANY PAVING <br /> co <br /> HUB OUTLET OR SOD FOR GAS SERVICE LINE INSTALLATION FROM MAIN TO BUILDING. <br /> co <br /> m SHEET NUMBER: <br /> GAS APPLIANCE L AN CE CONN ECT ON FLOOR SINK DETAIL L H W RECIRCULATION PUMP DETAIL L GAS CONNECTION DETAIL <br /> EInC. <br /> E <br /> P5 . 0 <br /> SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS <br /> ID 796 Merus Court I T 636.349.1600 <br /> St.Louis,MO 63026 F 636.349.1730 <br /> 02020 DB Franchising USA,LLC <br />