Laserfiche WebLink
a- <br /> 0 <br /> O m Q- <br /> —J m <br /> Z rnOo <br /> D <br /> W <br /> m Schedule Prevention briefings for the Operating personnel are conducted for easilyrYugh to 1} W <br /> assure adequate understanding of the SPCC plan. oN m <br /> lT1 4 program:g p tan with operating b m <br /> Z Describe the briefing Once per month, a review of the SPCC Plan with 40 D <br /> personnel by a trained individual who has undergone training in comp C� <br /> m CFR 112, et seq. There is a federal requirement for follow-up l3 hr training per Year in <br /> n � <br /> = conjunction with the regulations of 40 CFR 112. Monthly briefings should be both oral <br /> and written. Further department briefing information is SARA Title Ill, and relevant state <br /> � 0- <br /> local <br /> local and federal codes. (California Fire Code 2016) <br /> CDC <br /> 3.7 Annual Inspection <br /> Facility personnel perform a more thorough inspection of facility equipment on an ann e�Fo rased <br /> This annual inspection complements the monthly inspection described above and is p <br /> in June of each year using the checklist provided in Appendix C of this Plan. <br /> event in oto verify the <br /> der <br /> The annual inspection is preferably performed after a largestorm <br /> s stems suchras the enc osu e, �CD <br /> imperviousness and/or proper functioning of drainage controly <br /> drains, facility topography, control valves, and the rainwater run-off drainage.Written annual SPCC Plan for 0 <br /> inspection records are signed by Facility Manager& maintained with this <br /> period of 3yrs. <br /> Discharge Prevention - General SPCC Provisions <br /> The following measures are implemented to prevent oil. discharges during the handling, � o <br /> use, or transfer of oil products at the facility. Oil-handling employees have received CD <br /> training in the proper implementation of these measures. <br /> 3,8 Com liance with A licable Re- uirements 40 CFR 112.7 a 2 CD <br /> This facility has specific drainage system for rainwater drainage, beyond the topography of this <br /> urrounding con <br /> facility. Drainage from the masonry enclosure prevent by a block which is manually-operated toevent a discharge from enterST ing g the facility storage <br /> trolled d <br /> drainage system. The opening is located on the western wall of the enclosure, is to be blocke <br /> Staff determine <br /> & kept in the closed position, except when draining contaminated (sheen on water)the enclosure. loris pure and can <br /> whether the water being drained has a <br /> Oil- <br /> be allowed to enter the facility storm-water drainage and the accumulated atedr wlaterr is eleasedll <br /> free water will be released the opening isit <br /> under authorized supervision. if oil is present <br /> i the <br /> ecwater, <br /> a er,ed append x C by a licensed cleanup <br /> contractor(Donlee Pump) <br /> Drainage events <br /> flow <br /> Facy <br /> flit drainage outside the containment enclosure ew�idd e into <br /> the ne 1 ty k of drains located at <br /> the site. The general flow direction is south or to <br /> -destructive integrity evaluation has not previously been performed on any tanks. The <br /> Non d <br /> re inspected regularly and following a reg�lamentsdandlor as�equ red by therdance with Tme hods o � <br /> tanks a p <br /> UL and/or APSA guidelines or manufacturer requirements <br /> for this SPCC Plan. CRDM visual & v O <br /> and protocols set forth by the Professional Eng ,h <br /> D � <br /> U <br /> Co <br /> D U, <br /> N <br /> N 4�1 <br /> (Q N <br /> O <br /> 0 <br />