My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARTHUR
>
23534
>
2800 - Aboveground Petroleum Storage Program
>
PR0524264
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 9:49:57 AM
Creation date
10/5/2021 9:41:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0524264
PE
2832
FACILITY_ID
FA0006141
FACILITY_NAME
A L POWELL TRUCKING
STREET_NUMBER
23534
Direction
E
STREET_NAME
ARTHUR
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
22903010
CURRENT_STATUS
01
SITE_LOCATION
23534 E ARTHUR RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U) ° 09 Q <br /> p.• W 0 ch <br /> Z `i oOpy, <br /> D <br /> rn �' ? w <br /> M Cn <br /> 3.13.2 Monthly Inspection � Np <br /> wetl7ruckin9 O MM The checklist provided in Appendix C is used for monthly inspections by A,L.Pob <br /> Zpersonnel. The monthly inspections cover the following key elements: P' n D <br /> M <br /> 2 Observing the exterior of aboveground storage tanks, pipes,and other b <br /> (q equipment for signs of deterioration, leaks,corrosion,and thinning. <br /> Observing the exterior of portable containers for signs of deterioration s leaks. <br /> Q <br /> Observing tank foundations and supports for signs of instability or excessive <br /> settlement. CD <br /> Observing the tank fill and discharge pipes for signs of poor connection that <br /> could cause a discharge, and tank vent for obstructions and proper operation. <br /> Verifying the proper functioning of overfill prevention systems. as (D P <br /> Checking the inventory of discharge response equipment and restocking <br /> needed. <br /> All problems regarding tanks, piping, containment, or response equipment must immediately <br /> " <br /> be reported to the Manager. Visible oil leaks from tank walls, piping,or other comp o <br /> CD <br /> be repaired as soon as possible to prevent a larger spill or a discharge to navigable waters or <br /> adjoining shorelines. Pooled oil is removed immediately upon discovery- �. <br /> d maintained with this SPCC <br /> Written monthly inspection records are signed by the Manager an <br /> Plan for a period of three years. CD <br /> 0 <br /> 3.43.3 Annual InspectionCD <br /> Facility personnel perform a more thorough inspection of facility equipment on an annual basis. o <br /> This annual inspection complements the monthly inspection described above and is performed <br /> 10 <br /> in April of each year using the checklist provided in Appendix C of this Plan. <br /> CD <br /> event in order <br /> The annual inspection is preferably performed after a large storm er to verify the <br /> the enclosure <br /> imperviousness and/or proper functioning <br /> valves, an <br /> drainage approved any other proved method subsequently y <br /> dike, drains, facility topography, trol <br /> installed. <br /> 0 <br /> he Facility Manager and maintained with this <br /> Written annual inspection records are signed by t <br /> SPCC Plan for a period of three years. <br /> 3.'14 Personnel Trainin and Dischar a Prevention Procedures 40 CFR 112.7 <br /> �c <br /> Facility ManagerlHarbor Master is the facility designee and is responsible far ail discharge <br /> r. <br /> The Facl y � <br /> prevention, control, and response preparedness activities at this facility- <br /> instructed management has instructed oil-handling facility personnel in the <br /> A.L.Powell Trucking <br /> operation and maintenance of oil pollution prevention gulat ons discharge <br /> facility operations, o <br /> p applicable pollution control laws, rule <br /> protocols, app personnel with oil-handling responsibilities o 0 <br /> and the content of this SPCC Plan. Any new facility p 30 Q <br /> P? D <br /> C <br /> Cn <br /> D4�1 <br /> CD .'• <br /> J WN 0 A <br /> 0 Nva s: g��. •.•.. �•� F� <br />
The URL can be used to link to this page
Your browser does not support the video tag.