My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN <br />�.5 PHASiNG AND COSTS <br />Master Plan summary <br />Electrical power distribution will be installed on an as- needed basis as part of the on-site <br />roadways. The only exoeptlons to this incremental construction have been the extension <br />o4 the initial temporary service lines for the first Specific Plan and the slfing and <br />construction of the permanent community electrical substation_ The initial service line <br />extensions wilt require accelerated plarining and construction to coincide with the start of <br />resid"ial development. <br />Natural gas will also be provided on an as -needed basis as part of the on-site roadways. <br />However, Vie relocation of the existing gas line from Mountain House parkway to Central <br />Parkway will require detailed planning and phasing. <br />Telecommunications will also he provided on an as -needed basis and will be developed <br />along wittl on•sita roadways. <br />Plan Description <br />The Master Plan rggltirements related to phasing and oasts will tie implemented by Sell <br />through the implementation measure listed below. <br />SPIT' Implementation Measures <br />1, Phasing and Costs. All implementing projocts shall comply with the <br />applicable requirements of the Public Financing Plan and Technical Report, <br />Master Acquisition and Reimbursement Agreement between the MHCSO and <br />Trimark Communities, Master Plats Dave lopment A g reem ent between San <br />Joaquin County and Tel FRaFolk 0rRumitles; LL 2t he Masker Developer, <br />M4CSU Capital Improvement Program, and applicable development fee <br />Ordinances. <br />CMAPTER EIGHT ENERGY AND TELECOMMUNICATIONS PAGE 8.10 <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.