My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN it <br />CHAPTER NINE: TRANSPORTATION AND CIRCULATION <br />9.1 INTRODUCTION <br />Thtis chapter summarizes Master Plan provisions related to trmnsportation farailties errd <br />public transit and states bath the Paan ❑eseriptian and Implementation Measures far SP II <br />In addition, the provisions of the Mountain House TPM Program and Transit Plan are <br />referenced here. <br />Chapter Three. Le rd Use contains information related to the integration of land use and <br />circulation, Chapter Teri; Air Quality and Trattspoi#atian Management, discusses <br />provisions for transportation demand management. <br />9.2 TRIGGER PQINTS ANO FAIR SHARE <br />Master Plan Summary <br />The Marler Plan antir.ipates the need far8 multi-year roadway improvement plan and <br />establishes "trigger paints" when specific transporWVarn improvements are required to be <br />in place, based on the number of building permltz issued for new residences. Trigger <br />points are tied to projected residential development or othar polnts of deuelapmertl as <br />appropriate and are intended to serve as a fleadble planning tool that will accommodate <br />unpredicted changes in the future. Monitoring is tied to such faakars as current LOS, <br />review of planned improvements, anti participation of Cal Trans. <br />Plan Description <br />The MHCSO Transportation Improvement Fee and the Sart Joaqulr� County Tra flC Impact <br />MKJSg itlon Fee have already Identffied the major Improvements, costs and fair share <br />obligatlons for 0 major transportation fad ities far SPI l_ As a supplement to these adopted <br />programs, the MHCSP has performed an additional traffic study as part of SPI I which <br />confirms the adequacy c f these improvement programs mild funding rnechanisrns. The <br />MHCSD Traffic Study fufVer confirmed which components of the community build -out <br />system are likely to be ❑ompleted as part of the implementation of SPiI, as depicted an <br />Figure 9.1. <br />As part of irriloWnenting projects contained within SPIT, the MHOS❑ will perform detailed <br />traffic studies to identify the specific improvements and related phasing cf SPII roadways <br />which may be per~essary to supporl such implementing projects_ As part of the approval of <br />these implementing projects the MHCSD wait conditions such approVals to implement, as <br />warranted an a phased basis, the specific system hmprovamanks that the projects triggers. <br />consistent wKI) Community Approvals_ Since the spedfic transportation triggers for the <br />community transportatlon Improvements will be determined as park of implementing project <br />approvals, the specific triggers contained within the Masker Plan► YAII be <br />aur eFcad superseded by subsequent Mi-ICSID phasing and trigger determinations. <br />SPIE lmplementatlon Measures <br />Comm unity Roadway Im provements Phasi ng Rgquilremems. The specific <br />Improvement phasing requirements contained within Master Plan Tables 9. 1, <br />9.2, and 9,8 are specifically supercededsuoerseded by the requirements and <br />provisions contained within Specific Plan 11, the Improvements described in <br />Tables 5.15-20, 5.15-21 and &15.22 of the Specific Plan 11 Expanded Initial <br />Study, the MHCSID Roadway Improvement Plan, the MHCSD Mountain House <br />Trarisportatlen Improvement Fee Ordinance and Technical Report Dated <br />March 191 20001 the applicable prov}sions of the Master Acquisition and <br />CHAPTE=R NINE 'I'RANSPUR'I'ATION AND GIRCUTATION PAGE 3 1 <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.