My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN II <br />approvals, the specific triggers contained within the Master Plan will ba super -ceded by <br />subsequent MHCSD phasing and trigger determinations. <br />SPR Implementation Measures <br />1. Community Roadway Improvements Phasing Reg Li rements. The apeelllc <br />Improvement phasing requirements contained within Master Plan Tables 9.1. <br />9.2, and 9.8 are specifically s*+percp le Iuperseded by the requirements and <br />proyisiona contained within Specific PJ an II, the improvements descrlbed In <br />Tahlas 5A5 -2i], 5- 16.21 and S. 15.22 W the Specific P{an II Expanded Inldal <br />Study, the MHC SO Roadway Improvement Plan, the MHCSD Mountain House <br />Transportation Improvement Fee Ordinance and Technical Report Dated <br />March 19, ZOflD, the applicable provisions of the Master Acqulsition and <br />Reim bursamn nt Agreem ant between the MHCSD and Tr4mark ► unttim <br />L-L-Gthe Master Devetoeer, and Section 3.6.12 of the Master Plan <br />Development Agreement between San Joaquin County and Trimark <br />Gnmint4rrlT1e&r LLC1he Master Developer. The timing anti extent of all project <br />specific pleased improvements of community roadways shall be determined <br />as part of MHCSD Traffic Studies for all implementing projects. <br />2. _County Funding and_Particioation Reg u irements. All implementing projects <br />shall Comply with the requirements of the San Joaquin County Traffic Impact <br />Mitigation Fee Ordinance, and Section 3,6.12 of the Master Plan Development <br />Agreement between San Joaquin County and Tr n ark Comrs cm4le&, LLGthe <br />Master Developer, <br />3. MHGS EVCounty Miti pation Off -Set Program, At implementing projects shall <br />comply with the requirements of the MHCSDICounty iwhitigation Offset <br />Program contained within the MHCSD Mountain Hous4 Transportation <br />Improvement Foe Ordinance and Technical Report Dated March 19, 20DD and <br />Section 3.6.12 of the Master Plan Development Agreement between San <br />Joaquin County and T-Wnafk GO fmimti*'e, �' Cthe Master Dovetepet. <br />d. Community Participation. Subject to the provisions contained within Section <br />3.6.12 of the Master Plan Development Agreement between San Joaquin <br />County and Trirwwk G m rR --RWes ' I the Master Developer, if warranted by <br />the traffic monitoring program, or, if initiated by others, dmaiepmant within <br />Specific Plan li shall participate to the extent of its fair share In the traffic <br />studies and Improvementmeasures for fmpravements not listed in Ta We 9.2, <br />including the foilowing: Eleventh Street, Byron Road (south of Grant Line <br />Road), existing Grant Line Road (east of Byron Road), new Grant rine Road <br />{realigned sec#ion east of Byron toad}, grade separation at Grant Lino Road <br />crossing the Southern Pacific tallroad tracks (City of Tracy), Middle Road <br />extension (from Gold Rush City to MountaIn House), (Cities of Lathrop and <br />Tracy), Altamont Pass Road (Alameda County). Byron Highway (Contra <br />Costa County). <br />5. O peration and Safety Im provematits. Subject to the provisions contained <br />within Section 3.6.12 of the Master Plan Development Agreement between <br />San Joaquin County and LL the Master Developer, <br />development within Specific Plan II shall, to the extent of its fair share, <br />participate in upgrading <br />CHAPTER MINE TRANSPORTA110N AND CIRCULATION PAGE 5.4 <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.