Laserfiche WebLink
A ECOM imagined. <br /> I�'� t]elivered. <br /> Following receipt of the laboratory analytical results, the IDW will be transported offsite by Belshire <br /> Environmental Services for disposal. The soil will be transported to the Recology Hay Road Landfill in <br /> Vacaville, California and the water will be transported to Soil Safe in Adelanto, California. Newark will be <br /> listed as the generator on the disposal manifests and bill of lading and the disposal manifest will be signed <br /> by a Site representative. <br /> Removed well vaults and concrete pads will be transported back to the selected drilling subcontractor's <br /> yard and disposed of as construction debris. <br /> Schedule and Reporting <br /> AECOM will conduct field work within 30 days following RWQCB approval of the final Work Plan (subject <br /> to subcontractor availability). Utility-locating field activities are expected to take 1 full day. Well destruction <br /> activities are expected to occur a minimum of 4 days after utility-locating field activities and are expected <br /> to take 5 full days. IDW removal is expected to occur a minimum of 2 weeks after completion of well <br /> destruction activities and is expected to take 1 day.AECOM will prepare a Draft Well Destruction Report <br /> (Report)for RWQCB within 45 days of completing field activities. The Report will document completed <br /> well destruction activities and, at a minimum, will include the following: <br /> • Objectives; <br /> • A summary of completed field activities; <br /> • Field notes, including a table comparing the estimated and actual volume of grout used; <br /> • Tables and figures recording the well destruction volumes and locations; <br /> • Relevant documentation including San Joaquin County well destruction permits, completed well <br /> destruction forms, DWR-188 Well Completion Reports (Well Destruction), and disposal manifests or <br /> bills of lading for disposal of IDW; and <br /> • Conclusions and recommendations. <br /> AECOM will incorporate any RWQCB review comments and revise the Report prior to the Final Report <br /> submission within 15 days of receiving RWQCB comments. <br /> Limitations <br /> Some background information and other data that AECOM has used in preparing this report were <br /> furnished to AECOM by third parties.AECOM has relied on this information as furnished and is neither <br /> responsible for nor has confirmed the accuracy of this information. <br /> If you have any questions, please contact Scott Little at(916) 207-3053. <br /> Yours sincerely, <br /> Scott Little Richard A. Burzinski, PG, CHG <br /> Project Manager Senior Hydrogeologist <br /> AECOM AECOM <br /> T. 916-414-5874 T. 916-414-5800 <br /> M: 916-207-3053 M: 530-368-9667 <br /> E: scott.a.little@aecom.com E: Richard.Burzinski@aecom.com <br /> aecom.com <br /> Our Reference 60632236 <br /> 4/6 <br />