Laserfiche WebLink
A ECOM imagined. <br /> I�'� t]elivered. <br /> top of the well casing for any hanging lines, shining a flashlight into the open hole, and lowering a <br /> measuring tool to the total depth of the well. If obstructions are seen and/or felt while lowering the <br /> measuring tool, they will be removed by either removing the hanging lines or fishing the obstruction out <br /> with a three-pronged hook or similar tool. <br /> Each well will be over-drilled to the total depth of the original boring to remove the well casing and annular <br /> material using a Hollow Stem Auger(8 inch outside diameter).After all casing has been removed, the <br /> auger will be rotated at the bottom of the boring to remove all well construction debris to create a <br /> satisfactory seal between the new grout and the boring wall. <br /> Each boring will then be backfilled with neat cement grout, (i.e., Portland Cement-Type 1/II 3-5% bentonite) <br /> emplaced via tremie pipe.As the grout is pumped, the tremie pipe will be positioned so it is below the top <br /> of the grout rising in the boring. The bottom of the auger stem will always be positioned below the top of <br /> the grout seal to prevent possible caving of the sides of the boring. The volume of neat cement grout <br /> added to the well will, at minimum, be equal to the calculated amount shown for each well in Table 2. <br /> Any monitoring well water rising to the surface during grout placement will be contained and placed in <br /> Department of Transportation (DOT) approved 55-gallon drums <br /> Each well head box will be removed, and the former well vault cavity will be filled with a continuation of grout <br /> to form a"mushroom"cap at the top of the drilled out well. The uppermost few inches will be topped off with <br /> native soil to match the surrounding surface. <br /> All well destruction locations will be recorded using a hand-held Trimble-brand (or equivalent) global <br /> positioning system unit. <br /> In accordance with California Water Code Section 13751, the licensed C-57 water-well drilling <br /> subcontractor will file a Well Completion Report (Well Destruction)with DWR within 60 days of the <br /> completion of the work. <br /> Investigation-Derived Waste <br /> Investigation-derived waste (IDW)will be generated during well destruction activities and will include the <br /> boring soil, well casing and annular material removed from each boring, possible monitoring well water <br /> and decontamination water. <br /> The soil will be placed in a 20-yard roll-off bin, and the water will be contained in DOT-approved 55-gallon <br /> drums. The IDW will be covered and temporarily stored at the Site pending sampling and analysis for <br /> waste profiling purposes. It is anticipated that both the soil and water will be classified as non-hazardous. <br /> Four IDW profile samples (two soil and two water)will be composited from the bin and drums and sent to <br /> Eurofins Test America Laboratory, a State of California-certified analytical laboratory in Sacramento, <br /> California, for waste profiling purposes.The IDW samples will be labeled with site-specific labels and <br /> placed under chain-of-custody in a cooler chilled with ice and shipped to the laboratory for analysis. The <br /> samples will be analyzed on a standard 10-day-turnaround time. <br /> Each soil sample will be analyzed for: <br /> • TPH-g,TPH-d, and TPH as motor oil by United States Environmental Protection Agency (EPA) <br /> Modified Method SW8015; <br /> • Volatile organic compounds (VOC) by EPA Method SW826013; and <br /> • California Title 22 Metals by EPA Method SW6010B. <br /> Each water sample will be analyzed for TPH-g and TPH-d by EPA Modified Method SW8015, and VOC's <br /> by EPA Method SW8260B. <br /> aecom.com <br /> Our Reference 60632236 <br /> 3/6 <br />