Laserfiche WebLink
access road will be allowed. We will be responsible for the adequacy of any drainage facilities <br /> and for the continued maintenance thereof in manner that will preclude any hazard to life, <br /> health or damage to adjoining property. Existing property storm drainage facilities are in <br /> accordance with criteria as designated in the County drainage Manual. <br /> • Water:The property will have at least one new well. <br /> • Fire Tanks: New Fire Tanks will be added as per Fire Marshal's requirements for the new <br /> buildings. <br /> • Noise:All activities will always comply with the San Joaquin County Noise Ordinance. <br /> • Peak Wastewater Discharge:According to study&plans. <br /> • Septic Tanks: Onsite septic tank(s) and disposal field(s) as required for each phase, sized for <br /> programmed use. <br /> • Effect on Traffic: Based on our review of the existing conditions on S. Lammers Rd, and W. <br /> Bethany Rd, an analysis of the potential trip generation associated with the proposed project <br /> operations, and an evaluation of project access, it is concluded that the DYC project will not <br /> have any significant impact to the local traffic operations. Further since this property resides <br /> close to the junction of S. Lammers Rd, and W. Bethany Rd, visitors can access either of these <br /> roads to access major Highway 205. In fact, this project will help in a significant reduction of the <br /> traffic flow to Bay Area cities by providing this facility in Tracy for the Indian and local <br /> population living in that area. <br /> • Surface:All driving surfaces will be used in all-weather conditions and capable of sustaining <br /> 65000-pound gross vehicle weight. <br /> • Since this property has been identified under Area subject to 1%annual chance (100-year) <br /> flood; Base Flood Elevations determined;flood depths generally greater than 3 feet, hence <br /> all new building structures will be constructed on minimum 5 ft elevated surfaces. <br /> • Gates: We are planning to have gates that will not obstruct the required width or vertical <br /> clearance of the driveway.All fire apparatus access roads meeting the minimum width will have <br /> permanent" No parking fire lane" signs located so that all access roads are clearly identified <br /> and required clearance maintained as per CFC 503.3. <br /> • Project On-Site Parking:A new parking lot for the use for up to 750 attendees is being <br /> proposed as per the plans attached. For special occasion, the overflow traffic will be <br /> accommodated on the flat gravel areas to be specifically created for this purpose.All parking <br /> associated with the facility operations shall be accommodated on-site and no roadside parking <br /> will be allowed on W. Bethany Rd (designated No Parking Zone). "No Parking Any Time" <br /> signs will be installed along the W. Bethany Rd adjacent to the project site. <br /> 313Pages <br />