Laserfiche WebLink
Frewert Traffic Impact Study <br /> • Background Conditions—This scenario is based on Existing Conditions,with the addition of traffic <br /> generated by major development projects affecting the study area. <br /> • Background plus Project—This scenario is identical to Background Conditions, but with the addition <br /> of traffic from the proposed project. <br /> • Cumulative Conditions(2040)—This scenario considers the development of the county and <br /> surrounding communities to the year 2040, projecting existing traffic volumes to the year 2040 using <br /> a compounding annual growth factor.TJKM has calculated growth rates for a.m. and p.m. peak <br /> hours, based on the current SJCOG travel demand model for the 1-5 corridor near Roth <br /> Road, as furnished by the City of Lathrop. Annual growth rates of 1.11 percent (a.m. peak) <br /> and 1.61 (p.m. peak) were used. <br /> • Cumulative plus Project Conditions—This scenario is identical to Cumulative Conditions, but with <br /> the addition of traffic from the proposed project. <br /> Pa5 <br /> TJKM <br />