Laserfiche WebLink
Frewert Traffic Impact Study <br /> • 30 percent to/from 1-5 to the south <br /> • Five percent to/from the south on Manthey Road <br /> All truck trips to and from the project site will use the two project driveways on Frewert Road, Figure 6 <br /> illustrates the trip distribution and trip assignment at the study intersections.The project trips were then <br /> added to traffic volumes under Background Conditions and Cumulative Conditions to generate traffic <br /> volumes for detailed analysis. <br /> Page 122 <br /> TJKM <br />