Laserfiche WebLink
Frewert Trucking TIS <br /> Figure 8:Cumulative Conditions Peak Hour Traffic Volumes <br /> S.Harlan Rd&® 1-5 NB Off Ramp& 1-5 SB Off Ramp&Roth Rd ® Roth Rd ® Roth Rd <br /> 46(80) <br /> 1 E <br /> 210(A04) 342(485) v v v t—76(135) <br /> E.J 1, ` 34(67) F 266(284) -*J j y = 200)149) <br /> Roth Rd Roth Rd Roth Rd <br /> 87(95) El f 54(48)J ;Tr-,- <br /> 106(112) —>• <br /> 317(365) 366{414)--- <br /> o o 20{50) <br /> 181(210) N <br /> N <br /> & <br /> Roth Rd&Manthey Rd Frewert Rd® Manthey Rd <br /> d a s <br /> AL 34)127) o <br /> y <br /> 11,17),0" J <br /> Rd <br /> 3(67)Ro"Rd FrewenRd <br /> I 14(12) t <br /> R 9)15) <br /> citA <br /> LEGEND <br /> V Project Site XX AM Peak Hour Volumes <br /> ® Study Intersection (XX) PM Peak Hour Volumes <br /> N <br /> Project Driveway A <br /> 094-13508/2022 <br /> { <br /> TJ KM <br />