My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014455
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
212
>
2600 - Land Use Program
>
PA-2100228
>
SU0014455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 7:35:14 AM
Creation date
11/2/2021 10:16:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014455
STREET_NUMBER
212
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
APN
19123011, 12, 14
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
212 W FREWERT RD
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frewert Traffic Impact Study <br /> 7.0 CUMULATIVE PLUS PROJECT CONDITIONS <br /> This scenario is identical to Cumulative No-Project Conditions, but with the addition of projected traffic <br /> from the proposed project.Trip generation, distribution, and assignment for the proposed project are <br /> identical to that assumed under Existing plus Project Conditions. Figure 9 shows projected turning <br /> movement volumes at the study intersections under Cumulative plus Project Conditions. <br /> 7.1 INTERSECTION LEVEL OF SERVICE ANALYSIS-CUMULATIVE PLUS PROJECT CONDITIONS <br /> Table 11 summarizes the intersection LOS analysis results for Cumulative plus Project Conditions. Results <br /> of the LOS analysis for Cumulative (No-Project) Conditions are included for comparison purposes. Under <br /> Cumulative plus Project Conditions, all study intersections would continue to operate within applicable <br /> jurisdictional standards of LOS during both peak hours, except the intersections at Roth Road/S Harlan <br /> Road (Intersection#1) and Roth Road/1-5 Southbound Ramps(Intersection #3),which continue to operate <br /> at unacceptable LOS during both peak hours. Under Cumulative plus Project Conditions, both <br /> intersections of Roth Road/S Harlan Road (intersection#1) and Roth Road/1-5 Southbound Ramps <br /> (Intersection#3) experience increases in delay of more than five seconds from Cumulative (No-Project) <br /> Conditions, and thus, significant impacts are observed.Appendix G contains the detailed LOS analysis <br /> worksheets for Cumulative plus Project Conditions. <br /> Table 11: Intersection Level of Service Analysis-Cumulative plus Project Conditions <br /> Cumulative Cumulative plus <br /> ID Intersection Intersection Peak Conditions Project Conditions <br /> Control Hour' Averages Average 3 Change Significant <br /> Delay2 LOS Delay2 LOS in Delay° Impact? <br /> Roth Road&S Harlan AM 41.8 E 49.4 E 7.6 Y <br /> 1 Road AWSC PM 161.0 F 180.2 F 19.2 Y <br /> Mitigation:signalize Signal AM - 24.6 C -17.2 <br /> PM - 56.7 E -104.3 <br /> * Roth Road&1-5 AM 11.7 B 13.1 C 1 A N <br /> 2 Northbound Ramps One-Way Stop PM 15.7 C 22.0 C 6.3 N <br /> * Roth Road&1-5 AM 25.2 D 32.7 D 7.5 N <br /> 3 Southbound Ramps One-WayStap PM 38.0 E 64.6 F 26.6 Y <br /> Mitigation: AM - 12,9 8 -72,3 AWSC All-Way Stop PM - - 14.8 B -23.2 <br /> Roth Road&Manthey AM 10.4 B 11.5 B 1.1 N <br /> 4 Road One Way Stop PM 11.3 B 13.2 B 1.9 N <br /> Manthey Road& AM 9.3 A 10.2 B 0.9 N <br /> 5 Frewert Road One Way Stop PM 10.0 B 12.8 B 2.8 N <br /> 6 Frewert Road&Project One-Way Stop AM - 8.8 A - N <br /> Access#1 PM - 8.9 A N <br /> Frewert Road&Project AM _ 8.6 A N <br /> Access#2 One-Way Stop PM 8.7 A N <br /> Notes: <br /> 1.AM-morning peak hour,PM-evening peak hour <br /> 2.Whole intersection weighted average control delay expressed in seconds per vehicle for signalized and all-way stop controlled <br /> intersections.Total control delay for the worst movement is presented for side-street stop-controBed intersections. <br /> 3.LOS= Level of Service <br /> Bold indicates unacceptable operational conditions based on applicable jurisdictional standards. <br /> Page 131 <br /> TIKM <br />
The URL can be used to link to this page
Your browser does not support the video tag.