Laserfiche WebLink
HCM 6th TWSC Background Conditions <br /> 2: 1-5 NB Off Ramp & Roth Rd Timing Plan:PM Peak <br /> Intersection <br /> Int Delay,slveh 3.2 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations I TT 'ja 4 ?f <br /> Traffic Vol,vehlh 48 317 0 0 238 380 50 5 197 0 0 0 <br /> Future Vol,vehlh 48 317 0 0 238 380 50 5 197 0 0 0 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Freed Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized - None - None - - None - None <br /> Storage Length 0 - - 630 - 0 <br /> Veh in Median Storage,# - 0 0 - - 0 - 16965 <br /> Grade,% - 0 0 - - 0 - 0 <br /> Peak Hour Factor 89 89 89 95 95 95 88 88 88 92 92 92 <br /> Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 54 356 0 0 251 400 57 6 224 0 0 0 <br /> Major/Minor Major1 Major2 Minor1 <br /> Conflicting Flow All 651 0 - 0 915 1115 178 <br /> Stage 1 - - - - 464 464 - <br /> Stage 2 - - 451 651 - <br /> Critical Hdwy 4.13 - 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - 5.43 5.53 - <br /> Follow-up Hdwy 2.219 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 933 0 0 287 207 835 <br /> Stage 1 - 0 0 600 563 - <br /> Stage 2 - - 0 0 - - 641 464 - <br /> Piatoon blocked,% - <br /> Mov Cap-1 Maneuver 933 - - - 270 0 835 <br /> Mov Cap-2 Maneuver - - - 270 0 - <br /> Stage 1 - - - - 565 0 - <br /> Stage 2 - - 641 0 <br /> Approach EB WB NB <br /> HCM Control Delay,s 1.2 0 93.4 <br /> HCM LOS B <br /> Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBT WBR <br /> Capacity(vehlh) 270 835 933 - <br /> HCM Lane V/C Ratio 0.231 0.268 0.058 - <br /> HCM Control Delay(s) 22.3 10.9 9.1 - <br /> HCM Lane LOS C B A - <br /> HCM 95th Wile Q(veh) 0.9 1.1 0.2 - <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />