Laserfiche WebLink
HCM 6th TWSC Background plus Project Conditions <br /> 2: 1-5 NB Off Ramp & Roth Rd Timing Plan:AM Peak <br /> Intersection <br /> Int Delay,slveh 3.3 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SST SSR <br /> Lane Configurations I tT T 4 ?f <br /> Traffic Vol,vehlh 102 352 0 0 253 290 33 0 204 0 0 0 <br /> Future Vol,vehlh 102 352 0 0 253 290 33 0 204 0 0 0 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized - None - None - None - None <br /> Storage Length 0 630 0 - <br /> Veh in Median Storage,# - 0 0 - 0 - 16965 <br /> Grade,% - 0 0 - 0 - 0 <br /> Peak Hour Factor 89 89 89 92 92 92 94 94 94 92 92 92 <br /> Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 115 396 0 0 275 315 35 0 217 0 0 0 <br /> Major/Minor Majorl Major2 _ Minorl <br /> Conflicting Flow All 590 0 - 0 1059 1216 198 <br /> Stage 1 - - - - 626 626 - <br /> Stage 2 - - 433 590 - <br /> Critical Hdwy 4.13 - 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - 5,43 5,53 - <br /> Follow-up Hdwy 2.219 - 3.519 4,019 3,319 <br /> Pot Cap-1 Maneuver 983 0 0 - 234 180 811 <br /> Stage 1 - 0 0 - 496 476 - <br /> Stage 2 - - 0 0 - - 653 494 - <br /> Platoon blocked,% - <br /> Mov Cap-1 Maneuver 983 - - - - 207 0 811 <br /> Mov Cap-2 Maneuver - - - 207 0 - <br /> Stage 1 - - - - 438 0 - <br /> Stage 2 - - - - 653 0 - <br /> Approach EB WB NB _ <br /> HCM Control Delay,s 2.1 0 13.2 <br /> HCM LOS B <br /> Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBT WBR <br /> Capacity(vehlh) 207 811 983 - - <br /> HCM Lane VIC Ratio 0.17 0.268 0.117 - - <br /> HCM Control Delay(s) 25.9 11.1 9.1 - - <br /> HCM Lane LOS D B A - - <br /> HCM 95th%tile Q(veh) 0.6 1.1 0.4 - - <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />