Laserfiche WebLink
HCM 5th TWSC Background plus Project Conditions <br /> 3: Roth Rd & 1-5 SB Off Ramp Timing Plan;AM Peak <br /> Intersection <br /> Int Delay,slveh 15.3 <br /> Movement EBL EBT EBR WBL VVBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations ll r ) tt 4+ <br /> Traffic Vol,vehlh 0 175 72 177 109 0 0 0 0 279 5 72 <br /> Future Vol,vehlh 0 175 72 177 109 0 0 0 0 279 5 72 <br /> Conflicting Peds,#!hr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelizod None - None None - None <br /> Storage Length 0 0 520 <br /> Veh in Median Storage,# 0 - 0 16974 - 0 - <br /> Grade,% 0 - 0 0 - 0 - <br /> Peak Hour Factor 73 73 73 88 88 88 92 92 92 89 89 89 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 0 240 99 201 124 0 0 0 0 313 6 81 <br /> Major/Minor Ma'or1 Major2 Minor2 <br /> Conflicting Flow All 0 0 339 0 0 816 865 62 <br /> Stage 1 - - - - - 526 526 - <br /> Stage 2 - 290 339 - <br /> Critical Hdwy 4.13 6.63 6,53 6.93 <br /> Critical Hdwy Stg 1 - - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - - 5.43 5.53 - <br /> Follow-up Hdwy - 2.219 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 0 - 1219 0 330 291 990 <br /> Stage 1 0 - 0 558 528 - <br /> Stage 2 0 - 0 759 639 - <br /> Platoon blocked,% <br /> Mov Cap-1 Maneuver - 1219 - 276 0 990 <br /> Mov Cap-2 Maneuver - -276 0 - <br /> Stage 1 - - - - 558 0 - <br /> Stage 2 - - - 634 0 - <br /> Approach EB WB SB <br /> HCM Control Delay,s 0 5.3 36.3 <br /> HCM LOS E <br /> Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2 <br /> Capacity(vehlh) 1219 276 403 <br /> HCM Lane VIC Ratio 0.165 - 0.757 0.474 <br /> HCM Control Delay(s) - 8.5 - 49.6 21.7 <br /> HCM Lane LOS - A - E C <br /> HCM 95th%tile Q(veh) - 0.6 - 5.6 2.5 <br /> Notes <br /> -;Volume exceeds capacity $:Delay exceeds 300s +:Computation Not Defined All major volume in platoon <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 3 <br />