Laserfiche WebLink
HCM 6th Signalized Intersection Summary Background plus Project Mitigations <br /> 1: S Harlan Rd & Roth Rd Timing Plan:AM Peak <br /> --* --1' --* 4--- I} 1P. \* <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations I + if T+ +T if 41. <br /> Traffic Volume(vehlh) 77 335 144 28 262 45 214 35 51 39 14 66 <br /> Future Volume(vehlh) 77 335 144 28 262 45 214 35 51 39 14 fib <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlhlln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,vehlh 86 372 160 31 294 51 238 39 57 48 17 81 <br /> Peak Hour Factor 0.90 0.90 0.90 0.89 0.89 0.89 0.90 0.90 0.90 0.81 0.81 0.81 <br /> Percent Heavy Veh,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,vehlh 115 507 430 60 373 65 302 50 311 69 24 116 <br /> Arrive On Green 0.06 0.27 0.27 0.03 0.24 0.24 0.20 0.20 0.20 0.13 0.13 0.13 <br /> Sat Flow,yehlh 1781 1870 1585 1781 1553 269 1541 252 1585 551 195 930 <br /> Grp Volume(v),vehlh 86 372 160 31 0 345 277 0 57 146 0 0 <br /> Grp Sat Flow(s),vehlhlln 1781 1870 1585 1781 0 1822 1793 0 1585 1675 0 0 <br /> Q Serve(g_s),s 2.7 10,5 4,7 1.0 0.0 10.3 8.5 0.0 1.7 4.8 0.0 0.0 <br /> Cycle Q Clear(g_c),s 2.7 10.5 41 1.0 0.0 10.3 8.5 0.0 1.7 4.8 0.0 0.0 <br /> Prop In Lane 1.00 1,00 1.00 0.15 0.86 1.00 0.33 0.55 <br /> Lane Grp Cap(c),vehlh 115 507 430 60 0 438 352 0 311 210 0 0 <br /> V/C Ratio(X) 0.75 0.73 0.37 0.51 0.00 0.79 0.79 0.00 0.18 0.70 0.00 0.00 <br /> Avail Cap(c_a),vehlh 413 958 812 321 0 839 844 0 746 934 0 0 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 1,00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 <br /> Uniform Delay(d),slveh 26.6 19.2 17.1 27.4 0.0 20.6 22.1 0.0 19.4 24,2 0.0 0.0 <br /> [nor Delay(d2),slveh 3,6 2.1 0.5 2.5 0.0 3.2 1.5 0.0 0.1 1.6 0.0 0.0 <br /> Initial Q Delay(0),slveh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),vehlln 1.2 4.2 1.6 0.4 0.0 4.2 3.2 0.0 0.6 1.8 0.0 0.0 <br /> Unsig.Movement Delay,slveh <br /> LnGrp Delay(d),slveh 30.1 21,2 17.6 29.9 OA 23.8 23.6 0.0 19.5 25.8 0.0 0.0 <br /> LnGrp LOS C C B C A C C A B C A A <br /> Approach Vol,vehlh 618 376 334 146 <br /> Approach Delay,slveh 21.5 24.3 22.9 25.8 <br /> Approach LOS C C C C <br /> Timer-Assigned Phs 1 2 4 5 6 8 <br /> Phs Duration(G+Y+Rc),s 8.3 19.3 17.1 6.6 21.1 13.0 <br /> Change Period(Y+Rc),s 4.6 5.4 5.8 4.6 5.4 5.8 <br /> Max Green Setting(Gmax),s 13.4 26.6 27.2 10.4 29,6 322 <br /> Max Q Clear Time(g_c+11),s 4.7 12.3 10.5 3.0 12.5 6.8 <br /> Green Ext Time(p--c),s 0.1 1.6 0.9 0.0 2.4 0.5 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 23.0 <br /> HCM 6th LOS C <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />