Laserfiche WebLink
HCM 6th TWSC Cumulative plus Project Conditions <br /> 2: 1-5 NB Off Rame & Roth Rd Timing Plan: PM Peak <br /> Intersection <br /> Int Delay,s/veh 5 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations ) tt T 4 if <br /> Traffic Vol,vehlh 76 446 0 0 311 485 73 7 257 0 0 0 <br /> Future Vol,vehlh 76 446 0 0 311 485 73 7 257 0 0 0 <br /> Conflicting Peds,Whr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized - None None - None None <br /> Storage Length 0 - 630 0 <br /> Veh in Median Storage,# - 0 - 0 0 - 16965 - <br /> Grade,% - 0 - 0 0 - 0 - <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 83 485 0 0 338 527 79 8 279 0 0 0 <br /> Major/Minor Major1 Maor_2 Minor1 <br /> Conflicting Flow All 865 0 _ 0 1253 1516 243 <br /> Stage 1 - - - 651 651 - <br /> Stage 2 - 602 865 - <br /> Critical Hdwy 4.13 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - - 5.43 5.53 - <br /> Follow-up Hdwy 2.219 3.519 4,019 3.319 <br /> Pot Cap-1 Maneuver 776 - 0 0 - - 177 119 758 <br /> Stage 1 - - 0 0 - - 482 464 - <br /> Stage 2 - - 0 0 - - 546 370 - <br /> Platoon blocked,% - - - <br /> Mov Cap-1 Maneuver 776 - - - - - 158 0 758 <br /> Mov Cap-2 Maneuver - - - 158 0 - <br /> Stage 1 - - - - 430 0 - <br /> Stage 2 - - 546 0 - <br /> Approach EB WB NB _ <br /> HCM Control Delay,s 1.5 0 22 <br /> HCM LOS C <br /> Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBT WBR <br /> Capacity(vehlh) 158 758 776 <br /> HCM Lane VIC Ratio 0.55 0.369 0.106 - <br /> HCM Control Delay(s) 52.6 12.5 10.2 <br /> HCM Lane LOS F B B <br /> HCM 95th%tile Q(veh) 2.8 1.7 0.4 - <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 2 <br />