Laserfiche WebLink
HCM 6th TWSC Cumulative plus Project Conditions <br /> 3: Roth Rd & 1-5 SB Off Ram Timing Plan:PM Peak <br /> Intersection <br /> Int Delay,slveh 27.7 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations j~i ) tt <br /> Traffic Vol,vehlh 0 172 78 199 185 0 0 0 0 350 4 76 <br /> Future Vol,vehlh 0 172 78 199 185 0 0 0 0 350 4 76 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized None - None None - None <br /> Storage Length 0 0 520 <br /> Veh in Median Storage,# 0 - - 0 16974 - 0 - <br /> Grade,% 0 - 0 0 - 0 - <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 0 187 85 216 201 0 0 0 0 380 4 83 <br /> MajortMinor Major1 Major2 Minor2 <br /> Conflicting Flow All 0 0 272 0 0 863 905 101 <br /> Stage 1 - - - - - - 633 633 - <br /> Stage 2 - 230 272 - <br /> Critical Hdwy - - 4.13 - 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - 5,43 5.53 - <br /> Follow-up Hdwy 2.219 - 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 0 - - 1290 - 0 -309 276 935 <br /> Stage 1 0 - 0 492 472 - <br /> Stage 2 0 - - - 0 807 684 - <br /> Platoon blocked,% - <br /> Mov Cap-1 Maneuver - - 1290 - - -257 0 935 <br /> Mov Cap-2 Maneuver - - - - -257 0 - <br /> Stage 1 - - - - - - 492 0 <br /> Stage 2 - - _ - - 672 0 <br /> Approach EB WB SB <br /> HCM Control Delay,s 0 4.3 64.6 <br /> HCM LOS F <br /> Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2 <br /> Capacity(vehlh) 1290 257 360 <br /> HCM Lane V1C Ratio 0,168 0,987 0.594 <br /> HCM Control Delay(s) 8.4 - 95 28.6 <br /> HCM Lane LOS A F D <br /> HCM 95th%tile Q(veh) 0.6 9.5 3.7 <br /> Notes <br /> -:Volume exceeds capacity $:Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 3 <br />