Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Travel Forecasting <br /> As part of the General Plan update process, the City of Stockton developed a series of travel demand <br /> forecasting simulation models. In consultation with City of Stockton staff(McDowell, pers. comm.), travel <br /> forecasts used in the Traffic Study and this draft EIR are based on travel demand forecasting models <br /> developed for the City of Stockton (City of Stockton 2004a; 2018b). <br /> Travel models of the following two conditions were used to develop forecasts of future year traffic <br /> volumes for the Traffic Study: <br /> Existing Plus Approved Projects (EPAP), and <br /> 2040 Conditions with the updated General Plan. <br /> The City's travel demand models produce forecasts of daily traffic volumes. The forecasts of daily volumes <br /> generated by the City's travel model are adequate for use in the analysis of roadway segment LOS, and <br /> are used for daily volume forecasts in this draft EIR. However, the daily volumes generated by the traffic <br /> model are not, by themselves, adequate for use in the peak hour LOS analysis of study intersections. <br /> Daily traffic volumes from the travel models were used to generate growth factors. These growth factors <br /> were applied to existing peak hour intersection turning movement traffic volumes. The development of <br /> future year intersection turning movement traffic volumes requires that the turning movements at each <br /> intersection "balance". To achieve the balance, inbound traffic volumes must equal the outbound traffic <br /> volumes, and the volumes must be distributed among the various left-turn, through, and right-turn <br /> movements at each intersection. The "balancing" of future year intersection turning movement traffic <br /> volumes was conducted using methods described in the Transportation Research Board's (TRB's) National <br /> Cooperative Highway Research Program (NCHRP) Report 255, Highway Traffic Data for Urbanized Area <br /> Project Planning and Design (Transportation Research Board 1982). The NCHRP 255 method applies the <br /> desired peak hour directional volumes to the intersection turning movement volumes, using an iterative <br /> process to balance and adjust the resulting forecasts to match the desired peak hour directional volumes. <br /> 4.19.3.3 Project Impacts and Mitigation Measures <br /> The following analysis is conducted using existing background, near-term background conditions and <br /> long-term future background conditions. Future background conditions are based on the City of <br /> Stockton General Plan. Analysis of traffic operating conditions under the following seven scenarios is <br /> presented in the Traffic Impact study (Appendix J): <br /> Existing Conditions, <br /> Existing Plus Phase 1 of the GMC project, <br /> Existing Plus Buildout of the GMC project, <br /> EPAP No GMC Project Conditions, <br /> EPAP Plus GMC Project Conditions, <br /> Transportation 4.19-24 October 2021 <br />