Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Figure 3-4. Project Renderings provides a computer-generated conceptual aerial rendering of the Project <br /> as viewed from the West Lane main entrance looking east and Figure 3-5. Site Plan provides a conceptual <br /> plan view of the proposed development. Project site information is summarized in Table 3-1. Phase 1 <br /> construction is scheduled for 2023 and Phase 2 in 2030. <br /> 3.6 Project Components <br /> Figure 3-5 identifies the major Project components and phasing areas and Table 3-2. Lists the Proposed <br /> Buildings and Structures. Each major component is described below. <br /> Table 3-1. Project Statistics <br /> APNs DEVELOPMENT PHASE ACREAGE <br /> 059-08-029 1 12.5 <br /> 059-08-007 2 29.9 <br /> 059-08-030 (Lot Line Adjustment) 18.4 <br /> GENERAL PLAN DESIGNATION AG(General Agriculture) <br /> DEVELOPMENT TITLE ZONING AG-40(Agriculture 40-Acre Minimum) <br /> PARKING PARKING REQ. PROPOSED PARKING <br /> (spaces) <br /> Phase 1 Hospital 180 282 <br /> Phase 2 Hospital 870 1,000 <br /> Phase 2 Office Medical Building ? ? <br /> TOTAL: 1,282 <br /> 3.6.1 Buildings and Structures <br /> Proposed buildings and structures are described below, are listed in Table 3-2, and shown on Figure 3-5. <br /> Buildings and structures associated with onsite utilities are described in Section 3.6.4 Utilities. <br /> 3.6.1.1 Phase 1 Hospital Building (Site Plan Building A) <br /> The Phase 1 hospital Building would be the focal point of Phase 1 development.The 36,000-SF, 25-foot- <br /> high, single-story center is proposed in the approximate center of the Phase 1 development area. <br /> Section 3.0 Project Description 3-9 October 2021 <br />