Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> 1. Develop a health center and hospital campus built to OSHPD 1 standards, in two phases <br /> including a Phase 1, 36,000± square-foot (SF) 12-bed single story full-service hospital <br /> with emergency room and ABC services, and Phase 2, 140,000± SF 100-bed hospital with <br /> emergency room, helipad and an associated 60,000± SF medical office building. <br /> 2. Utilize land currently owned by the applicant/related entities as the development site for <br /> the Project. <br /> 3. Provide emergent care and hospital services readily accessible from the eastern region of <br /> San Joaquin County including, Linden, Lockeford, Acampo, Woodbridge and Clements, <br /> while also providing increased hospital services to the existing and urbanizing areas of <br /> Stockton and Lodi. <br /> 4. Provide improved local access to hospital emergency room services. <br /> 5. Develop a facility that will provide state-of-the-art health care, labor, delivery, and <br /> obstetrics care. <br /> 6. Provide an attractive and cohesive hospital campus setting through development of a <br /> phased master plan and cohesive architectural theme. <br /> 7. Retain the Eight Mile Road/Ham Lane intersection future traffic signal as identified in the <br /> Eight Mile Road Specific Plan to ensure adequate site access at full build out. <br /> 8. Provide an onsite buffer along the northern project boundary to protect existing adjacent <br /> agricultural operations and opportunities for habitat enhancement. <br /> 9. Retain_acres of the Project site for continued agricultural (vineyard) operations. <br /> 10. Have the Phase 1 hospital operating within five years of approval and Phase 2 hospital <br /> and medical office building fully operating within ten years of Project approval. <br /> 3.5 Project Characteristics <br /> The Project includes phased construction of a ±42.4-acre medical center campus consisting of two <br /> hospital buildings, a medical office building and supporting amenities including internal circulation, <br /> parking lots, landscaping and onsite water, wastewater and stormwater utilities (collectively referred to as <br /> Utilities). <br /> The Phase 1 development area would be accessed from West Lane, occupy 12.5 acres and include a <br /> smaller single story 12-bed hospital with associated parking, landscaping and onsite utilities. The Phase 1 <br /> Hospital would provide emergency room, labor, delivery, emergent medicine, and outpatient surgery <br /> services. The Phase 2 development area would add access driveways from Ham Lane and Eight Mile <br /> Road, would occupy 29.9 acres and would include a larger 100-bed three-story full-service Hospital with <br /> emergency heliport landing/take off area. Both hospitals would be permitted and licensed by OSHPD as <br /> OSHPD 1 general acute-care full-service hospitals with a duly constituted governing body with overall <br /> administrative and professional responsibility. The hospitals would be staffed to provide 24-hour <br /> inpatient care, including emergency room and basic services. <br /> Both project phases would be served by onsite Utilities mostly located within the Phase 2 development <br /> area. Utilities would be initially sized to serve Phase 1 development and would be expanded as necessary <br /> to serve full development as part of Phase 2 construction. <br /> Section 3.0 Project Description 3-8 October 2021 <br />