Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Compared to Existing Conditions, the project-related increase in volumes at each of the three above <br /> intersections would not be greater than five percent. Therefore, based on criteria presented in the above <br /> General Plan Policy Consistency Criteria section, the project-related inconsistency with road segment <br /> General Plan policies is considered less than significant. No improvements are required. <br /> It should be noted that while no project-related improvements are required for these road segments <br /> under Existing Plus Phase 1 conditions, as shown in Table 4.19-7, implementation of recommended <br /> improvements for Existing Conditions on these three road segments would result in the following. <br /> On the Eight Mile Road West of Lower Sacramento Road Segment implementation of <br /> recommended improvements for Existing Conditions would result in this roadway segment <br /> operating at LOS A. LOS A is considered acceptable. This improvement is included in the City of <br /> Stockton PFF program (City of Stockton 2004b), and the San Joaquin County RTIF program (San <br /> Joaquin Council of Governments 2018). <br /> On the Lower Sacramento Road South of Eight Mile Road Segment implementation of <br /> recommended improvements for Existing Conditions would result in this roadway segment <br /> operating at LOS A. LOS A is considered acceptable. This improvement is included in the City of <br /> Stockton PFF program, and the San Joaquin County RTIF program. <br /> On the Eight Mile Road Between Lower Sacramento Road and West Lane implementation of <br /> recommended improvements for Existing Conditions would result in this roadway segment <br /> operating at LOS A. LOS A is considered acceptable. This improvement is included in the City of <br /> Stockton PFF program. <br /> Table 4.19-7.Roadway Segment Level of Service-Existing Plus Phase 1 With Recommended Improvements <br /> Roadway Segment Number of Lanes Daily Volume Level of <br /> Service <br /> Eight Mile road West of Lower Sacramento Road 4 19,137 A <br /> Lower Sacramento Road South of Eight Mile Road 4 16,191 A <br /> Eight Mile Road Lower Sacramento Road to West Lane 4 22,254 A <br /> Notes: Improvements are those recommended for Existing Conditions,not for Existing Plus Phase 1 conditions,and are shown for <br /> information only.No improvement are required due to Phase 1 project-related changes. <br /> Ramp Junction Levels of Service <br /> Table 4.19-8 presents LOS on each study rampjunction under Existing Plus Phase 1 conditions. Traffic <br /> volumes at these ramp junctions under Existing Plus Phase 1 conditions would be generally higher than <br /> under Existing Conditions. Under Existing Plus Phase 1 conditions, LOS at all four study rampjunctions <br /> would be at acceptable LOS C or better and related impacts are less than significant. No improvements <br /> are needed at these ramp junctions to achieve acceptable LOS. <br /> Transportation 4.19-29 October 2021 <br />