My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> Table 4.19-8.State Route 99 Ramp Merge and Diverge Level of Service-Existing Plus Phase 1 <br /> AM Peak PM Peak <br /> Ramp Junction Freeway Hour Freeway Hour <br /> Volume Ramp Density LOS Volume Ramp Density LOS <br /> Volume Volume <br /> SR 99 Southbound Diverge to Eight Mile 3,639 267 25.9 C 3,022 293 22.5 C <br /> Road Off-Ramp(Existing) <br /> SR 99 Southbound Merge from Eight 3,639 311 25.0 C 3,022 191 20.7 C <br /> Mile Road On-Ramp(Existing) <br /> SR 99 Northbound Merge from Eight Mile 2,936 369 22.0 C 3,826 242 25.6 C <br /> Road On-Ramp(Existing) <br /> SR 99 Northbound Diverge to Eight Mile 2,936 182 21.4 C 3,826 297 26.5 C <br /> Road Off-Ramp(Existing) <br /> Notes:LOS=Level of Service.SR=State Route.Density is expressed in passenger cars per mile per lane. <br /> Increased Demand for Public Transit <br /> As shown in Table 4.19-9, Phase 1 development of the medical center would generate 386 trips per day. <br /> This would be less than 10 percent of the full buildout (Phases 1 and 2) project trip generation per day <br /> (386 - 3,975 = 0.097). <br /> Considering the relatively low number of trips generated by Phase 1 development, Phase 1 would have a <br /> less-than-significant impact on public transit service. No mitigation measures are required for Phase 1 <br /> development. <br /> Table 4.19-9.Gill Medical Center Project Trip Generation Estimate <br /> Quantity Trips Generated <br /> Land Use and ITE Land Use (Thousand AM Peak Hour PM Peak Hour <br /> Code Square Feet) Daily In Out Total In Out Total <br /> Medical Center 36.00 386 22 10 32 11 24 35 <br /> (Hospital-ITE Code 610) <br /> Medical Office Building <br /> (Medical-Dental Office Building- 60.00 2,088 130 37 167 58 149 208 <br /> ITE Code 720) <br /> Hospital 140.00 1,501 85 39 125 43 92 136 <br /> (Hospital-ITE Code 610) <br /> Total 3,975 237 86 324 112 265 F379 <br /> Sources: Institute of Transportation Engineers 2017. <br /> Note: Totals may not equal the sum of components due to rounding. <br /> Transportation 4.19-30 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.