My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> There is nothing unusual about the Project that would cause it to fail to comply with Federal, State, and <br /> local management and reduction statutes and regulations related to solid waste. The impact is less than <br /> significant. <br /> Mitigation Measures <br /> None required. <br /> Impact 4.19-6: Implementation of the proposed Project would substantially decrease groundwater <br /> supplies or interfere substantially with groundwater recharge such that the project <br /> may impede sustainable groundwater management of the basin. <br /> Impact Determination: less than significant. <br /> Threshold: Would substantially decrease groundwater supplies or interfere substantially with <br /> groundwater recharge such that the project may impede sustainable groundwater <br /> management of the basin. <br /> As discussed in draft EIR Chapter 3.0 Project Description and Section 4.12 Hydrology and Water Quality, <br /> groundwater would serve as the Project's supply source. As discussed in Section 4.12, the Project would <br /> not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such <br /> that the project may impede sustainable groundwater management of the basin. Related impacts are less <br /> than significant. <br /> Mitigation Measures <br /> None required. <br /> Impact 4.19-7: Implementation of the proposed Project would conflict with or obstruct <br /> implementation of a water quality control plan or sustainable groundwater <br /> management plan. <br /> Impact Determination: less than significant. <br /> Threshold: Would conflict with or obstruct implementation of a water quality control plan or <br /> sustainable groundwater management plan. <br /> As discussed in draft EIR Chapter 3.0 Project Description and Section 4.12 Hydrology and Water Quality, <br /> groundwater would serve as the Project's supply source. As discussed in Section 4.12, the Project would <br /> not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater <br /> management plan. Related impacts are less than significant. <br /> Mitigation Measures <br /> None required. <br /> 4.21.4 Cumulative Impacts <br /> As discussed above, the Project does not contribute to cumulative impacts related to the need to <br /> construct new or expanded water, wastewater treatment, storm water drainage, electric power, natural <br /> Utilities and Service Systems 4.21-15 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.