Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> There is nothing unusual about the Project that would cause it to fail to comply with Federal, State, and <br /> local management and reduction statutes and regulations related to solid waste. The impact is less than <br /> significant. <br /> Mitigation Measures <br /> None required. <br /> Impact 4.19-6: Implementation of the proposed Project would substantially decrease groundwater <br /> supplies or interfere substantially with groundwater recharge such that the project <br /> may impede sustainable groundwater management of the basin. <br /> Impact Determination: less than significant. <br /> Threshold: Would substantially decrease groundwater supplies or interfere substantially with <br /> groundwater recharge such that the project may impede sustainable groundwater <br /> management of the basin. <br /> As discussed in draft EIR Chapter 3.0 Project Description and Section 4.12 Hydrology and Water Quality, <br /> groundwater would serve as the Project's supply source. As discussed in Section 4.12, the Project would <br /> not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such <br /> that the project may impede sustainable groundwater management of the basin. Related impacts are less <br /> than significant. <br /> Mitigation Measures <br /> None required. <br /> Impact 4.19-7: Implementation of the proposed Project would conflict with or obstruct <br /> implementation of a water quality control plan or sustainable groundwater <br /> management plan. <br /> Impact Determination: less than significant. <br /> Threshold: Would conflict with or obstruct implementation of a water quality control plan or <br /> sustainable groundwater management plan. <br /> As discussed in draft EIR Chapter 3.0 Project Description and Section 4.12 Hydrology and Water Quality, <br /> groundwater would serve as the Project's supply source. As discussed in Section 4.12, the Project would <br /> not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater <br /> management plan. Related impacts are less than significant. <br /> Mitigation Measures <br /> None required. <br /> 4.21.4 Cumulative Impacts <br /> As discussed above, the Project does not contribute to cumulative impacts related to the need to <br /> construct new or expanded water, wastewater treatment, storm water drainage, electric power, natural <br /> Utilities and Service Systems 4.21-15 October 2021 <br />