My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> be conducted). Thus, the proposed Project is considered slightly superior to Alternative 4 from a <br /> hydrology and water quality perspective. <br /> 6.3.10 Tribal Cultural Resources <br /> 6.3.10.1 Alternative 1: No Project Alternative <br /> According to the draft EIR, no Tribal Cultural Resources (TCRs) were identified within or immediately <br /> adjacent to the Project site, however ground disturbing activities could result in the unanticipated <br /> discovery of TCRs and prehistoric archaeological sites which may be considered TCRs. The draft EIR finds <br /> that with implementation of Mitigation Measures 4.20-1a, Project impacts to unknown tribal cultural <br /> resources would be less than significant with mitigation incorporated. <br /> Under the No Project Alternative, none of the proposed Project construction that require the above <br /> mitigation would occur. Therefore Alternative 1 is superior to the proposed Project for the issue of <br /> potential impacts to tribal cultural resources. <br /> 6.3.10.2 Alternative 2: Reduced Project— Phase 1 Hospital Only <br /> The proposed Phase 1 development area comprises 12.5 acres of the 42.4-acre Project site. This equates <br /> to an approximately 71 percent decrease in land development compared to the proposed Project with a <br /> corresponding reduction in potential impacts to unknown tribal cultural resources. Therefore Alternative 2 <br /> is moderately superior to the proposed Project for the issue of potential impacts to tribal cultural <br /> resources. <br /> 6.3.10.3 Alternative 3: Connect to Public Utilities - Water, Wastewater and Storm Water <br /> Under this alternative, the onsite areas reserved for water, wastewater and storm water utility construction <br /> would no longer be required and the Project development footprint could be reduced accordingly, <br /> benefiting potential impacts to unknown tribal cultural resources. As shown on Figure 6-2, all pipeline <br /> extensions required to connect the Project site with the nearest available water, wastewater and storm <br /> water utilities would occur within existing road right-of-way. Because trenching for pipeline extension <br /> could extend below previous grading conducted for road base construction, implementation of <br /> Alternative 3 would result in a moderate increase in potential impacts to tribal cultural resources. While <br /> implementation of Tribal Cultural Resources Mitigation Measures 4.20-1 a could be applied during offsite <br /> utility construction, due to the length (and potentially depth for wastewater pipelines) of required <br /> trenching, a slight increase in potential for impacts to buried tribal resources can be expected. Therefore, <br /> Alternative 3 would result in a slight increase in potential impacts to tribal cultural resources and the <br /> proposed Project and is considered superior for this issue. <br /> Alternatives 6-20 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.