My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014502
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 10:29:54 AM
Creation date
11/4/2021 4:18:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014502
PE
2675
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908029, -07 -30
ENTERED_DATE
11/4/2021 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
5/2/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> 6.3.10.4 Alternative 4: Alternative Site Location—Stockton Economic and Education <br /> Enterprise Zone (Eight Mile Road at 1-5) <br /> Alternative 4 would relocate the Project site to a suitable location within the City of Stockton Economic <br /> and Education Enterprise Zone located north of Eight Mile Road and east and west of 1-5 as shown in <br /> Figure 6-2. <br /> Existing conditions at the alternative site location are similar to the Project site in that it is mostly level and <br /> currently in agricultural production.The only way to confirm the presence of tribal cultural resources is to <br /> consult with native American tribes that have requested consultation.Therefore, Project development at <br /> the alternative site is expected to be subject to tribal cultural resource mitigation similar to that of the <br /> proposed Project. <br /> Because the alternative site is located within the City, development at the alternative site would include <br /> connection to City of Stockton utilities which would reduce the required construction footprint compared <br /> to the proposed Project. While this would result in a slight reduction for potential impacts to unknown <br /> tribal cultural resources, both sites have similar existing conditions and uses, and therefore similar tribal <br /> cultural resource mitigation is expected to apply at the alternative site. <br /> In summary, the only expected tribal cultural resource advantage of development at the alternative site <br /> would be the slight reduction in construction footprint resulting from elimination of onsite utilities. <br /> Therefore, Alternative 4 is considered slightly superior to the proposed Project from a tribal cultural <br /> resources perspective. <br /> 6.4 CEQA Environmentally Superior Alternative <br /> CEQA Guidelines Section 15126.6 provides that an EIR should identify the "environmentally superior" <br /> alternative. "If the environmentally superior alternative is the 'no project' alternative, the EIR shall also <br /> identify an environmentally superior alternative among the other alternatives." The following sections <br /> summarize information and the comparative impact analyses presented above and identifies the <br /> environmentally superior alternative in keeping with CEQA requirements. <br /> 6.4.1 Alternative 1: No Project Alternative <br /> Under the No Project Alternative, the proposed hospitals and medical office building, onsite circulation, <br /> parking, water, wastewater and storm drain improvements would not be constructed. Furthermore, the <br /> proposed medical services would not be offered at the Project site and the Project objectives would not <br /> be met. <br /> The No Project Alternative would generate no VMT impact, nor would it produce direct construction or <br /> operational air emissions, including GHG emissions, thereby eliminating proposed Project VMT and GHG <br /> significant and unavoidable impacts. The No Project Alternative would also eliminate the following <br /> potentially significant but mitigable impacts of the proposed Project: <br /> Conversion of 33.11 acres of active agricultural land. <br /> Construction equipment and operational traffic NOx emissions. <br /> Alternatives 6-21 October 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.