Laserfiche WebLink
Administrative Draft Environmental Impact Report <br /> Gill Medical Center Project <br /> 6.3.10.4 Alternative 4: Alternative Site Location—Stockton Economic and Education <br /> Enterprise Zone (Eight Mile Road at 1-5) <br /> Alternative 4 would relocate the Project site to a suitable location within the City of Stockton Economic <br /> and Education Enterprise Zone located north of Eight Mile Road and east and west of 1-5 as shown in <br /> Figure 6-2. <br /> Existing conditions at the alternative site location are similar to the Project site in that it is mostly level and <br /> currently in agricultural production.The only way to confirm the presence of tribal cultural resources is to <br /> consult with native American tribes that have requested consultation.Therefore, Project development at <br /> the alternative site is expected to be subject to tribal cultural resource mitigation similar to that of the <br /> proposed Project. <br /> Because the alternative site is located within the City, development at the alternative site would include <br /> connection to City of Stockton utilities which would reduce the required construction footprint compared <br /> to the proposed Project. While this would result in a slight reduction for potential impacts to unknown <br /> tribal cultural resources, both sites have similar existing conditions and uses, and therefore similar tribal <br /> cultural resource mitigation is expected to apply at the alternative site. <br /> In summary, the only expected tribal cultural resource advantage of development at the alternative site <br /> would be the slight reduction in construction footprint resulting from elimination of onsite utilities. <br /> Therefore, Alternative 4 is considered slightly superior to the proposed Project from a tribal cultural <br /> resources perspective. <br /> 6.4 CEQA Environmentally Superior Alternative <br /> CEQA Guidelines Section 15126.6 provides that an EIR should identify the "environmentally superior" <br /> alternative. "If the environmentally superior alternative is the 'no project' alternative, the EIR shall also <br /> identify an environmentally superior alternative among the other alternatives." The following sections <br /> summarize information and the comparative impact analyses presented above and identifies the <br /> environmentally superior alternative in keeping with CEQA requirements. <br /> 6.4.1 Alternative 1: No Project Alternative <br /> Under the No Project Alternative, the proposed hospitals and medical office building, onsite circulation, <br /> parking, water, wastewater and storm drain improvements would not be constructed. Furthermore, the <br /> proposed medical services would not be offered at the Project site and the Project objectives would not <br /> be met. <br /> The No Project Alternative would generate no VMT impact, nor would it produce direct construction or <br /> operational air emissions, including GHG emissions, thereby eliminating proposed Project VMT and GHG <br /> significant and unavoidable impacts. The No Project Alternative would also eliminate the following <br /> potentially significant but mitigable impacts of the proposed Project: <br /> Conversion of 33.11 acres of active agricultural land. <br /> Construction equipment and operational traffic NOx emissions. <br /> Alternatives 6-21 October 2021 <br />