My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 8:42:09 AM
Creation date
11/9/2021 8:38:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />99840 <br />1. TANK ANNULAR TESTING <br />Test Method Developed By: El Tank Manufacturer <br />Other (Spec j/5') <br />i1 Industry Standard LjProfessional Engineer <br />Test Method Used: ElPressure <br />Other (Specin) <br />Vacuum ElHydrostatic <br />Test Equipment Used: 4" Oil tilled Gauge <br />Tank # 87 Tank # 91 <br />Equipment Resolution: 0 <br />Is Tank Exempt From Testing?I El Yes XI No El Yes No <br />Tank Capacity: <br />Tank Material: Fiberglass Fiberglass <br />Tank Manufacturer: Xerxes Xerxes <br />Product Stored: 87 Gas 91 Gas <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes 30 minutes <br />Test Start Time: 9:10am 9:35am <br />Initial Reading (RI ): 10 HG 10 HG <br />Test End Time: 10:10am 10:35am <br />Final Reading (RF): 10 HG 10 HG <br />Test Duration: 1 hour 1 hour <br />Change in Reading (RF-Ri): 0 0 <br />Pass/Fail Threshold or Criteria: 0.00 0.00 <br />Test Result: i4 Pass El Fail @ Pass El Fail El Pass El Fail El Pass El Fail <br />Was sensor removed for testing? ElYes I No ENA EYes i4No LINA EYes ElNo ElNA ElYes ElNo ElNA <br />Was sensor properly replaced and <br />verified functional after testing? Eyes ENo ENA EYes ENO ENA Yes ElNo @NA EYes ElNo IINA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />I Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
The URL can be used to link to this page
Your browser does not support the video tag.