My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 8:42:09 AM
Creation date
11/9/2021 8:38:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />2. SECONDARY PIPE TESTING <br />Test Method Developed By: Piping Manufacturer <br />:..I Other (Spec6) <br />1 Industry Standard Professional Engineer <br />Test Method Used: 1 Pressure Vacuum Hydrostatic <br />Other (Specift) <br />Test Equipment Used: 4" Oil filled Gauge Equipment Resolution: 0 <br />87 Product 91 Product <br />Piping Material: Fiberglass Fiberglass <br />Piping Manufacturer: Smith Smith <br />Piping Diameter: 3, 3" <br />Length of Piping Run: 150' 150' <br />Product Stored: 87 Gas 91 Gas <br />Method and location of <br />piping-run isolation: Boots <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes 30 minutes <br />Test Start Time: 10:00am 9:10am <br />Initial Reading (R): 5 psi 5 psi <br />Test End Time: 11:00am 10:10am <br />Final Reading (RF): 5 psi 5 psi <br />Test Duration: 1 hour I hour <br />Change in Reading (RF-R): 0 0 <br />Pass/Fail Threshold or <br />Criteria: 0.00 0.00 <br />Test Result: I Pass Fail 0 Pass Fail Pass Fail Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up jot-jailed tests)
The URL can be used to link to this page
Your browser does not support the video tag.