Laserfiche WebLink
Page 2 of 2 <br />2. SECONDARY PIPE TESTING <br />Test Method Developed By: Piping Manufacturer <br />:..I Other (Spec6) <br />1 Industry Standard Professional Engineer <br />Test Method Used: 1 Pressure Vacuum Hydrostatic <br />Other (Specift) <br />Test Equipment Used: 4" Oil filled Gauge Equipment Resolution: 0 <br />87 Product 91 Product <br />Piping Material: Fiberglass Fiberglass <br />Piping Manufacturer: Smith Smith <br />Piping Diameter: 3, 3" <br />Length of Piping Run: 150' 150' <br />Product Stored: 87 Gas 91 Gas <br />Method and location of <br />piping-run isolation: Boots <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes 30 minutes <br />Test Start Time: 10:00am 9:10am <br />Initial Reading (R): 5 psi 5 psi <br />Test End Time: 11:00am 10:10am <br />Final Reading (RF): 5 psi 5 psi <br />Test Duration: 1 hour I hour <br />Change in Reading (RF-R): 0 0 <br />Pass/Fail Threshold or <br />Criteria: 0.00 0.00 <br />Test Result: I Pass Fail 0 Pass Fail Pass Fail Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up jot-jailed tests)