Laserfiche WebLink
7) Provide a drawing indicating the locations of all water wells, septic systems, and storm drains. 1 <br />see that existing storm drains were noted on page G.0.2.0 but any water wells and septic <br />systems were not noted. N/A for this project <br />8) Provide completed UPCF Underground Storage Tanks — Facility form (A) and UPCF Underground <br />Storage Tanks (B) — Tank (one form per tank). Can this be a condition that forms for ust <br />system/equipment installed will be submitted prior to final <br />We would also like to respectfully request expedite review as well for this project. Upon receipt & <br />review, please advise, feel free to contact our office should you have any questions. <br />Thank you, greatly appreciate all your assistance regarding this project & look forward to obtain CUPA <br />Permit/Approved Plans. <br />Sincerely, <br />Robert Velasco <br />A & S Engineering <br />28405 Sand Canyon Road, Suite "8" <br />Canyon Country, CA 91387 <br />Office #661-250-9300 <br />Fax #661-250-9333 <br />Cell #818-746-6986 <br />From: Presto, Carol [EHD] <cpresto@sigov.org> <br />Sent: Tuesday, March 2, 20212:50 PM <br />To: roberty@asengineer.com <br />Cc: Isandoval@asenineer.com <br />Subject: FW: SR0081541- 2510 S. Hwy 99, Stockton - UST Install <br />Good Afternoon Mr. Velasco, <br />I'm not sure if you received my email. I understand that Mr. Sandoval was in our office last week <br />checking on the status of this installation. I have Stacy's list below of items that are still missing on the <br />application. I found some of the forms in our office like the application and ELD testing but the below <br />are still missing. <br />1) Page 3 of the Application for the Underground Storage Tank Installation Permit: <br />Owner/operator information is outdated. <br />2) Complete manufacturer certifications were not submitted. Provide current contractor's training <br />certifications for installation and testing of all proposed UST equipment/components, including <br />tanks & sumps, flex connectors, piping, spill buckets, sump shields & lids, leak detectors, and <br />overfill prevention. A number of the attached certifications have expired and there is not a <br />certification for each part being installed. <br />3) Provide manufacturer's cut sheets for all proposed UST system components, including piping, <br />flex connectors, STP & fill sumps, UDCs, vent sumps, penetrations, spill buckets, and overfill <br />prevention. 1 found a link in one of the emails but it says that it is an "invalid link". <br />4) Provide tank charts for the tanks being used. Sheets M5.3.04, M5.3.05, M5.3.06., & M5.6.03 are <br />different from the tank charts needed. Tank carts are a large table of values that list the dipstick <br />value associated with the gallons in the tank. /found tank charts in the papers for this install but <br />23 <br />