TANK AND PIPING INSTALLATION SCOPE OF WORK: <br />GENERAL: <br />SCOPE OF WORK: UNLESS SPECIFIED OTHERWISE ON THESE DRAWINGS, THE GENERAL CONTRACTOR SHALL FURNISH ALL WORK AND MATERIALS TO <br />COMPLETE THE INSTALLATION OF THE SYSTEMS AND EQUIPMENT SHOWN IN THESE DRAWINGS AND AS REQUIRED BY PROJECT DOCUMENTS PROVIDED <br />TO THE CONTRACTOR. <br />WHERE THESE DRAWINGS DIFFER FROM LOCAL REGULATIONS, LOCAL REGULATIONS WILL SUPERSEDE THESE DRAWINGS IF THEY ARE MORE STRINGENT. <br />NOTE: <br />THESE GUIDELINES APPLY ONLY TO UNDERGROUND STORAGE TANKS AND PRODUCT PIPING. REFER TO BALANCE OF SITE SPECIFIC DOCUMENTS/ <br />DRAWINGS FOR SPECIFICATIONS REGARDING CONCRETE/ASPHALT INSTALLATION, ELECTRICAL REQUIREMENTS, AND SANITARY & STORM SEWERS <br />INSTALLATION. <br />*** WHERE MULTIPLE VERSIONS OF THE SAME SHEET EXIST, INSERT *** <br />THE SHEET APPROPRIATE FOR THE SPECIFIC STATION LAYOUT. <br />ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND <br />EQUIPMENT LOCATIONS <br />ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL <br />BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. <br />ALL REQUESTS TO ADD, DELETE, OR SUBSTITUTE MATERIAL AND EQUIPMENT SHOWN ON THESE DRAWINGS MUST BE REVIEWED AND APPROVED BY <br />THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, IN CHARGE OF THE PROJECT. ALL CHANGES MUST BE REVIEWED WITH <br />THE MARKETING FUELS MANAGER. <br />THE CONTRACTOR IS REQUIRED TO FURNISH AS -BUILT DRAWINGS TO LOCATE TANKS AND PIPING AS INSTALLED AFTER THE COMPLETION OF THE <br />PROJECT. <br />(1) TANK INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS TANKS WITH COMPLETE "VEEDER ROOT -TLS -350 PLUS" TANK AND PIPING <br />MONITORING AND ALARM SYSTEM. TANKS TO BE SET MIN. 60" BELOW FINISH GRADE. SEE SITE SPECIFIC INSTALLATION DETAILS FOR TANK SIZES AND <br />LOCATIONS. <br />NYC VARIANT: INSTALL TOP AND BOTTOM SLAB AND SLAB PIER SUPPORT SYSTEM PER NYC STANDARDS. <br />TANK SIZING GUIDELINES: <br />SPECIFIC BUSINESS UNIT TANK SIZE REQUIREMENTS ARE RECOMMENDED. TANK SIZING MODELS CAN BE RUN BY CONTACTING FUEL SYSTEM DESIGN <br />MANAGER - AMERICAS. <br />LOCATION OF TANKS AND ASSOCIATED EQUIPMENT ON PROPERTY: FINAL FACILITY EQUIPMENT LOCATIONS INCLUDING PLACEMENT AND <br />ORIENTATION OF TANKS, EMERGENCY SHUTOFF SWITCHES, OVERFILL ALARMS (IF PRESENT) TO BE APPROVED BY BP DISTRIBUTION PRIOR <br />TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR AND SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. THE <br />GENERAL CONTRACTOR IS RESPONSIBLE FOR CONFIRMING APPROVED TANK AND EQUIPMENT LOCATIONS HAS BEEN DOCUMENTED W/ BP <br />DISTRIBUTION, THE SITE ENGINEER AND/OR OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER PRIOR TO THE <br />COMMENCEMENT OF WORK. <br />TANKS: <br />SHALL BE UNDERWRITERS LABORATORY APPROVED LISTED FOR THE UNDERGROUND STORAGE OF ALL FLAMMABLE AND COMBUSTIBLE MOTOR FUELS <br />AS CALLED FOR ON THE SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND SHALL BE DOUBLE WALL TANKS OF <br />FIBERGLASS REINFORCED PLASTIC (FRP). INSTALLATION OF TANKS AND PIPING SHALL BE IN ACCORDANCE WITH U.L. LISTED MANUFACTURER'S <br />INSTRUCTIONS. INSTALLATION SHALL CONFORM TO NFPA-30/30A AND ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. TANKS SHALL <br />ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE STATE IN WHICH THE TANKS ARE TO BE INSTALLED AND BY THE TANK <br />MANUFACTURER. <br />THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. ALL CONTINUOUS MONITORING <br />DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. <br />ALL MATERIALS USED IN THE INSTALLATION SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY <br />RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES. <br />METHANOL COMPATIBILITY: FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY ACCESSIBLE COMPONENTS SHALL BE METHANOL <br />COMPATIBLE FOR THE IMMEDIATE INTENDED SERVICE. <br />BIO -DIESEL COMPATIBILITY: CURRENTLY AT THIS TIME, NO TANKS ARE LISTED FOR BIO -DIESEL SERVICE APPLICATIONS. <br />INITIAL TANK TESTING: <br />NEW TANKS SHALL BE INSPECTED UPON ARRIVAL AT SITE, AFTER UNLOADING FROM THE TRUCK, FOR VISUAL DAMAGE PRIOR TO INSTALLATION. <br />- FOR DRY ANNULAR SPACE TANKS AIR/SOAP TESTS MUST BE PERFORMED AT THE JOB SITE PRIOR TO INSTALLATION TO VERIFY THE ABSENCE <br />OF DAMAGE. <br />- FOR LIQUID FILLED ANNULAR SPACE TANKS - AIR/SOAP TESTS ON ACCESSORIES AND FITTINGS CAN BE PERFORMED AFTER THE TANK IS IN <br />THE EXCAVATION BEFORE OR AFTER BACKFILLING. <br />CONTRACTOR SHALL COMPLETE ALL TESTING ACCORDING TO MANUFACTURER'S INSTRUCTIONS FOR THE TANKS. CONTRACTOR SHALL COMPLETE ALL <br />WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER. <br />HYDROSTATICALLY MONITORED DOUBLE WALL TANKS SHALL BE TESTED ACCORDING TO MANUFACTURER'S INSTRUCTIONS BY: <br />- INSPECT AND ADJUST RESERVOIR LEVEL OF THE MONITORING FLUID (TO COVER THE RIBE INSIDE THE RESERVOIR. <br />- REMOVE ENOUGH TANK FITTING PLUGS TO SEE INSIDE THE PRIMARY TANK. VISUALLY INSPECT THE TANK INTERIOR FOR COLORED MONITORING <br />FLUID TRACES. <br />- CONNECT TANK TEST MANIFOLD AND PRESSURIZE THE PRIMARY TANK TO 5 PSIG MAX. (3 PSIG MAX. FOR 12' TANKS). MONITOR THE <br />PRESSURE FOR 30 MINUTES FOR ANY LOSS IN PRESSURE THAT MAY INDICATE A LEAK. <br />- DO NOT PRESSURIZE THE ANNULAR SPACE. DOING SO MAY DAMAGE THE PRIMARY TANK OR CAUSE TANK FAILURE. <br />- WHILE UNDER PRESSURE, COVER FITTINGS AND MANWAY(S) WITH SOAP SOLUTION AND INSPECT. <br />- AFTER COMPLETING AIR TEST, RELEASE PRESSURE; REMOVE ALL GAUGES, VALVES, AND HOSE ASSEMBLIES; REPLACE AND TIGHTEN FITTING <br />PLUGS; AND REPLACE THE PLASTIC VENT PLUG IN THE OPEN FITTINGS. <br />***NOTE*** HYDROSTATIC FLUID RESERVOIR LEVEL MUST BE RECHECKED TO VERIFY TANK INTEGRITY PRIOR TO INTRODUCING BALLAST INTO TANKS. <br />FIELD REPAIR OF TANKS: IT IS ALLOWABLE TO FIELD REPAIR DAMAGED TANKS AFTER APPROVAL BY BP FILED ENGINEER. ALL TANKS DAMAGED IN <br />TRANSPORT OR OFF LOADING OPERATIONS SHALL BE FIELD REPAIRED BY A TANK MANUFACTURER'S CERTIFIED FIELD SERVICE REPRESENTATIVE. TANK <br />MANUFACTURER SHALL RE -CERTIFY REPAIRED TANKS FOR USE. ALL FIELD SERVICE WORK SHALL BE DOCUMENTED. COPIES OF ANY AND ALL FIELD <br />SERVICE DOCUMENTATION SHALL BE PLACED IN THE PROJECT FILE AND INTO OWNERS OPERATING FILE. <br />TANK MEASUREMENTS: <br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE FOLLOWING TANK MEASUREMENT ACTIVITIES: <br />1. VERIFY THE EXTERNAL SIZE OF THE TANK TO MATCH WITH MANUFACTURER SUPPLIED SHOP MEASUREMENTS. <br />TRANSFER THE SIZE, SERIAL NUMBER, AND PRODUCT INSTALLED, AND POSITION OF TANK TO THE AS -BUILT PLAN. <br />2. TRANSFER TANK DIMENSIONAL AND PRODUCT INFORMATION TO THE DATA SHEET IN THE TANK GAUGE CONSOLE. <br />3. PROVIDE THE TOP OF TANK ELEVATION READING AT BOTH ENDS OF EACH TANK. <br />TANK DEFLECTION MEASUREMENT PROCEDURE: <br />DEFLECTION MEASUREMENT BEFORE AND AFTER TANK INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S REQUIREMENTS AND SHALL BE <br />WITHIN MANUFACTURER'S TOLERANCES. ALL INFORMATION SHALL BE COMPLETED AS PER THE MANUFACTURER'S WARRANTY DOCUMENTATION. <br />I.D.="A" <br />BEFORE BACK FILL AFTER BACK FILL <br />TANK INSPECTION AND INSTALLATION - DEFLECTION MEASUREMENT <br />DIPSTICK PREPARATION <br />DRIVE A SMALL HEADED, NON -SPARKING (E.G. BRASS) NAIL HALFWAY INTO A WOODEN DIPSTICK, 1 INCH ABOVE ITS BASE. <br />FIRST DIAMETER READING (PRIOR TO BACK FILL) <br />1. PLACE THE DIPSTICK INTO A SERVICE FITTING. <br />2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE FITTING. <br />3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. <br />4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE FITTING. SUBTRACT 1 INCH FROM THIS MEASUREMENT AND <br />RECORD THE DISTANCE. <br />5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "A" ON THE INSTALLATION CHECKLIST. <br />SECOND DIAMETER READING (AFTER BACKFILL) <br />1. PLACE THE DIPSTICK INTO A SERVICE FITTING WITH A STANDPIPE INSTALLED TO SUBGRADE. <br />2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE STANDPIPE. <br />3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. <br />4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE STANDPIPE. SUBTRACT 1 INCH FROM THIS MEASUREMENT AND <br />RECORD THE DISTANCE. <br />5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "B" ON THE INSTALLATION CHECKLIST. <br />CALCULATION AND COMPARISON <br />1. SUBTRACT READING "B" FROM READING "A". <br />2. COMPARE THIS VALVE TO THE TABLE OF "MAXIMUM ALLOWABLE DEFLECTIONS" SHOWN ON THE "INSTALLATION CHECKLIST". <br />3. VERTICAL DEFLECTION IN EXCESS OF THESE VALUES INDICATES IMPROPER INSTALLATION AND VOIDS THE TANK WARRANTY. <br />MAXIMUM DEFLECTION FOR 8'-0" TANKS = 1-1/4" <br />MAXIMUM DEFLECTION FOR 10'-0" TANKS = 1-1/2" <br />TOP OF TANK ELEVATION: <br />CONTRACTOR TO CALCULATE TOP OF TANK ELEVATION. START WITH 18" MINIMUM DEPTH OF VAPOR RECOVERY LINE AT THE FARTHEST DISPENSER <br />AND SLOPE 1/4" PER FOOT MAXIMUM TO 1/8" PER FOOT MINIMUM. ADD 12" AT THE TANK. ADD 13" (FOR 3" PIPE) OR 8" (FOR 2") FOR A <br />CHANGE IN PIPING DIRECTION OTHER THAN 90 OR 45 DEGREES. SET TANKS 6" DEEPER THAN CALCULATED AS PRECAUTION. IN NO EVENT SHALL <br />THE TANK BE BURIED LESS THAN 4'-0" BELOW FINISHED GRADE OR DEEPER THAN 7'-0" BELOW FINISHED GRADE. SEE MANUFACTURERS <br />INSTALLATION INSTRUCTIONS FOR MINIMAL TANK BURY WHEN DEADMEN ANCHORING IS NOT PROVIDED. ANY VARIATIONS IN SLOPE FROM 1/4" PER <br />FOOT SHALL BE REPORTED TO OWNER'S ENGINEER. <br />TANK EXCAVATION: <br />CONTRACTOR TO EXCAVATE TANK HOLE. CONTRACTOR SHALL ADHERE TO O.S.H.A. STANDARDS ON EXCAVATIONS. CONTRACTOR MAY SELECT ANY OF <br />THE RECOMMENDED PRACTICES FOR TANK EXCAVATION AND MUST PROVIDE ALL NECESSARY PROTECTIVE BARRICADES. <br />SLOPE SIDES OF TANK HOLE (USE OF SLOPING MUST BE RECEIVE PRIOR APPROVAL ON INDIVIDUAL SITE BASIC FROM "BP") OR USE <br />SHORING FOR ALL TANK EXCAVATIONS IN ACCORDANCE WITH OSHA 1926 SUBPART P, OSHA STANDARDS - EXCAVATIONS; FINAL RULE <br />OCTOBER 1, 1989. WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE CONDITIONS AN ENGINEERED SHORING PLAN UTILIZING <br />INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND SHALL INCLUDE SUPPORTING ENGINEERING CALCULATIONS BY A STATE <br />CERTIFIED ENGINEER AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. <br />GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" OR MORE <br />IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br />TANK EXCAVATIONS SHALL BE THE MINIMUM SIZE REQUIRED TO PROVIDE FOR BEDDING AND CLEARANCES INDICATED IN THESE DRAWINGS. TANK <br />BURIAL DEPTH FIELD DETERMINED TO PROVIDE FOR 1/4" (1/8" PER FOOT MIN.) PER FOOT FOR STAGE II VAPOR RECOVERY PIPING & 1/8" <br />MINIMUM PER FOOT FOR PRODUCT PIPING SLOPE BACK FROM DISPENSERS TO TANK. <br />TANK STABILITY BUOYANCY CALCULATIONS: <br />TANK STABILITY SHALL BE RE -CHECKED AGAINST FLOATATION BY INSTALLING CONTRACTOR. SEE BUOYANCY CALCULATIONS ON TANK DETAILING SHEETS. <br />TANK ANCHORING: <br />CONTRACTOR TO INSTALL MANUFACTURER SUPPLIED TANK HOLD DOWN STRAPS & ANCHORS WHEN REQUIRED DUE TO HIGH WATER TABLE, LOCAL <br />REGULATIONS, OR SPECIFIED BY SITE ENGINEER/DESIGNER AND/OR OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER. WHEN <br />REQUIRED, THE ANCHORING SYSTEM SHALL BE IN COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. ANCHOR & STRAPS TO BE INSTALLED ACCORDING TO <br />MANUFACTURER'S INSTRUCTIONS. <br />** ALTERNATE ANCHORING BY USE OF A CONCRETE ANCHORING SLAB IS PERMITTED. WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE <br />WITHIN 5 FT. OF GRADE CONTRACTOR SHALL NOTIFY OWNER'S REPRESENTATIVE FOR DIRECTION ON ANCHORING METHOD TO BE USED <br />(DEADMAN OR ANCHORING SLAB) AND SUCH SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATION. <br />** THIS PROCEDURE IS REQUIRED IN NYC AND CONSIDERED PART OF SCOPE OF WORK WHEN INSTALLING TANKS IN NYC. <br />NYC VARIANT: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF A 12" CONCRETE ANCHORING SLAB. 4,000 <br />PSI AT 28 DAYS WITH (2) LAYERS OF 6x6-w5.5xw5.5 ON 2" STEEL CHAIRS TOP & BOTTOM <br />FILTER FABRIC: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF FILTER FABRIC (DUPONT TYPAR OR MIRAFI <br />50OX ) WHICH IS REQUIRE FOR WET HOLE INSTALLATIONS OR UNSUITABLE SOILS. (NOTE: A WET HOLE/ UNSUITABLE AREA REQUIRING <br />FILTER FABRIC IS ANY TANK EXCAVATION IN WHICH THE AREA IS SUBJECT TO: TIDAL INFLUENCES, OR AREAS SUBJECT TO FREQUENTLY <br />CHANGING GROUND WATER LEVELS, OR WATER CONDITIONS WITH SILTY SOIL, OR MUCK, BOG, PEAT, SWAMP, LANDFILL TYPE AREAS OR <br />ANY OTHER SITUATION WHERE THE SOIL IS INHERENTLY UNSTABLE, OR SOILS WITH LESS THAN 250 LBS./SQ. FT. COHESION, OR WITH <br />ULTIMATE BEARING CAPACITY OF LESS THAN 500 LBS./SQ. FT., OR AT THE REQUEST OF THE TANK OWNER. ALL WET HOLE BALLAST <br />INSTALLS (AS DESCRIBED IN SECTION BELOW) SHALL USE FILTER FABRIC. <br />FILTER FABRIC SHALL EXTEND 1 FOOT ABOVE MAX HIGH WATER TABLE AND SEAMS SHALL BE OVERLAPPED BY 1 FOOT. MATERIAL SHALL <br />BE PINNED OR OTHERWISE SECURED ALLOW BACKFILL WITHOUT DISTURBANCE. USE OF PLASTIC, OR ANY OTHER MATERIAL THAT MAY TEAR, <br />OR DEGRADE OVERTIME IS PROHIBITED. <br />WET HOLE BALLAST METHOD: <br />WATER IS THE SUITABLE MEDIUM FOR BALLAST DURING WET HOLE TANK INSTALLATIONS. A PROPERLY INSTALLED 12 FOOT HIGH TEMPORARY VENT PIPE <br />MUST BE INSTALLED BY THE CONTRACTOR. IF WATER IS USED TO BALLAST TANKS, THE WATER IS TO BE COMPLETELY PUMPED OUT & MOPPED DRY IN <br />ORDER TO PROTECT FUEL INTEGRITY. CONTRACTOR IS REQUIRED TO COORDINATE BALLASTING OPERATIONS WITH OWNER'S REPRESENTATIVE OR HIS AGENT, <br />> <br />THE BP PROJECT MANAGER. IT IS THE INSTALLING CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE JURISDICTIONAL REQUIREMENTS AND ACCEPTANCE <br />FOR BALLASTING THE TANKS AND TO PROVIDE FOR PROPER DISPOSAL OF THE BALLASTING MEDIUM UNDER THE REGULATIONS OF THE GOVERNING <br />AUTHORITY. <br />BACK FILL: <br />CONTRACTOR TO PROVIDE ALL BACK FILL REQUIRED FOR THE PROJECT SCOPE. PEA GRAVEL SHALL CONSIST OF NATURALLY ROUNDED AGGREGATE, <br />MINIMUM 1/8" AND MAXIMUM 3/4" SIZE. FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER AND <br />OWNERS FIELD REPRESENTATIVE. <br />NO MORE THAN 5% (BY WEIGHT) MAY PASS THE #8 SIEVE FOR BACK FILLING NONMETALLIC TANKS WITH A 96% TO 98% FREE FALL COMPACTION. DRY <br />PEA GRAVEL DENSITY MINIMUM OF 95 POUNDS PER CUBIC FOOT IS REQUIRED. SUPPLY QUARRY CERTIFICATION MEETING ASTM C-33, PARAGRAPH 9.1 <br />REQUIREMENTS. <br />BACK FILLING OF TANK EXCAVATIONS SHALL BE PROVIDED IN LIFTS AS PER TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />PRODUCT, VENT, AND VAPOR PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" BED OF COMPACTED PEA GRAVEL. BLOCKS, PLANKS, <br />OR OTHER DEBRIS SHALL NOT BE USED TO SUPPORT PIPING IN FINAL INSTALLATION. <br />NOTE: UNDER NO CIRCUMSTANCES SHALL DIRT, PAVING MATERIALS, WOOD, OR OTHER CONSTRUCTION DEBRIS BE ALLOWED TO REMAIN IN TANK AND <br />PIPE EXCAVATIONS. <br />(2) ANNULAR SPACE HYDROSTATIC MONITOR AND RISER INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL 4" FIBERGLASS RISER AND VEEDER ROOT HYDROSTATIC SENSOR AT TANK ANNULAR SPACE LOCATION NOTED <br />ON THE PLANS PER MANUFACTURERS INSTRUCTIONS. <br />(3) TANK SUMP INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL 42" OR 48" DIAMETER TURBINE SIDE FIBERGLASS POLYSIDED SUMPS ON TANKS PER MANUFACTURER'S <br />INSTRUCTIONS. NOTE THAT THE ORIENTATION OF THE TANK SUMPS MUST BE CORRECT IN ORDER TO FACILITATE CORRECT PIPING INSTALLATION INTO <br />THE SUMPS. SEE ACCOMPANYING DETAILS IN PLAN SET AND NOTE SIZES OF SUMPS PER PROJECT DEMOGRAPHICS. <br />NYC VARIANT: 42" DIAMETER TURBINE SUMPS ARE INSTALLED. <br />LONG ISLAND/NY VARIANT: ON TANKS INSTALLED IN LONG ISLAND, FILL SUMPS ARE REQUIRED. SEE ENCLOSED DRAWINGS FOR DETAILS <br />ARCO BRANDED VARIANT: 48" DIAMETER TURBINE SUMPS ARE INSTALLED. <br />CALIFORNIA VARIANT: 42" DIAMETER FILL SUMPS TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS HYDROSTATIC MONITORING DEVICE PER <br />AB -2481 REQUIREMENTS. <br />(4) TANK LEVEL GAUGE / OVERFLOW PROTECTION: <br />STANDARD: CONTRACTOR TO INSTALL VEEDER ROOT MAGNOSTRICTIVE PROBE LEVEL GAUGE AT LOCATION NOTED ON PLANS PER MANUFACTURER'S <br />INSTALLATION INSTRUCTIONS. <br />OVERFLOW PROTECTION: UST OVERFLOW COMPLIANCE IS ACHIEVED BY USE OF OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT 95% AND <br />IS IN ACCORDANCE WITH FEDERAL AND STATE GUIDELINES FOR UST OVERFILL REQUIREMENTS. <br />AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER ROOT AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM PROVIDES <br />AN AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) ARE FILLED TO THE 90% LEVEL. <br />(5) FILL AND STAGE I VAPOR RECOVERY INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL 4" GALVANIZED FILL AND STAGE I VAPOR RECOVERY RISERS. CONTRACTOR TO INSTALL DROP TUBE ASSEMBLY. <br />WITH OVERFILL PREVENTION DROP TUBE. CONTRACTOR TO INSTALL VENT AND STAGE II FLEX CONNECTORS AND FRP ADAPTERS. LOCATE AND CUT <br />PENETRATIONS INTO SUMPS FOR THE ROUTING OF VENT AND STAGE II VAPOR PIPING INTO TURBINE SUMPS AND MAKE CONNECTIONS TO VENT AND <br />VAPOR PIPING FIBERGLASS PIPING. CONTRACTOR TO INSTALL DOUBLE SIDED PENETRATION ENTRY BOOTS FOR ALL ENTRIES INTO SUMPS. CONTRACTOR <br />TO INSTALL STATIC GROUNDING SYSTEM AT ALL FILL AND VAPOR RISERS PER INSTALLATION DETAILS SHOWN ON SHEET G.0.7. <br />CONTRACTOR TO INSTALL CARB APPROVED STAGE I MANHOLES WITH 5 GALLON SPILL COLLECTION BUCKETS. INSTALL PRODUCT AND FILL ADAPTERS AND <br />CAPS. SEE ACCOMPANYING DETAILS IN SITE SPECIFIC PLAN SET FOR MANUFACTURER AND INSTALLATION REQUIREMENTS. <br />NYC VARIANT: CONTRACTOR TO PROVIDE THE INSTALLATIONS OF A SEPARATE UNOBSTRUCTED VENT CONNECTION AT EACH TANK AT THE TURBINE SIDE <br />OF THE TANK AS PER PLANS AND PER NYC CODE REQUIREMENTS. A 15 GALLON PRODUCT SPILL COLLECTION BUCKET IS REQUIRED BY NYC FIRE <br />CODE. FILL SPILL BUCKETS MUST HAVE A NYC CERTIFICATE OF APPROVAL FROM FIRE DEPARTMENT. <br />6) TURBINE INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL FE PETRO IST 2 HP VARIABLE SPEED TURBINES AND PIPING CONNECTION VALVES AND FITTINGS IN TANK <br />SUMPS AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS. ALL PRODUCT LINES TO TURBINES TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK <br />DETECTION. LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT <br />THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. ALL TURBINES ARE EQUIPPED WITH STANDARD "R" CHECK VALVE AS A <br />STANDARD FROM FACTORY. SET TURBINE INTAKES AT 5" FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. <br />CONTRACTOR TO INSTALL 1" RIGID STEEL CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). CONTRACTOR IS TO LABEL <br />TURBINES AND CONTROLLERS AS TO WHICH PRODUCT THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR <br />LOSE POWER. IST PUMP CONTROLS ARE TIED TO VEEDER ROOT CONTROL PANEL. SEE APPROPRIATE TURBINE CONFIGURATION AND PROGRAMMING <br />SHEETS. <br />SINGLE MASTER TURBINE CONFIGURATIONS - EQUIPPED AS NOTED ABOVE. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br />MASTER -SATELLITE TURBINE CONFIGURATIONS - EQUIPPED AS NOTED ABOVE EXCEPT: ONLY THE MASTER TURBINE SHALL HAVE THE PLLD LEAK <br />DETECTOR INSTALLED. CONTRACTOR TO REMOVE THE STANDARD "R" CHECK VALVE OUT OF THE SATELLITE TURBINE. THE BALL VALVE ON MANIFOLD <br />LINE BETWEEN TURBINES SHALL BE SET IN THE "OPEN" POSITION AND A SINGLE PLLD (PART #848-480-001) IS TO BE INSTALLED ON THE <br />MASTER IST WITH AN FE. PETRO NON -VENTED PRECISION CHECK VALVE (PART #65 PSI) INSTALLED ON THE SATELLITE IST PREVENTING <br />BACKFILLING OF USTs. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br />MASTER -MASTER TURBINE CONFIGURATIONS - EQUIPPED AS NOTED ABOVE EXCEPT: THE BALL VALVE ON MANIFOLD LINE BETWEEN TURBINES SHALL <br />BE SET IN THE "CLOSED" POSITION DURING NORMAL OPERATION. SEPARATE LINES & (2) PLLDs (PART #VER -848-480-001) SHALL BE INSTALLED. <br />IN CASE OF FAILURE OF AN INDIVIDUAL IST, THE PRODUCT CROSS-OVER LINE CAN BE PLACED INTO OPERATION BY OPENING THE CROSS <br />CONNECTING VALVE. THE FAILED IST MUST HAVE ITS PLLD DISABLED & DISPENSER SIGNAL WIRES NEED TO BE MODIFIED FOR THIS TEMPORARY <br />SET-UP. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br />ARCO LARGE SITE VARIANT - IF SITE HAS 9 OR MORE MPDS, TWO (2) 2 HP VARIABLE SPEED TURBINES ARE TO BE INSTALLED IN THE PRIMARY <br />REGULAR UNLEADED TANK. THE REGULAR UNLEADED TURBINES SHALL BE SET UP AS "MASTER/SATELLITE/SATELLITE" AND THE CROSS CONNECTION <br />MANIFOLD BETWEEN TANKS SHALL BE OPENED ALLOWING ALL THREE TURBINES TO SERVE THE ENTIRE SITE. <br />NYC VARIANT: MASTER -MASTER TURBINE CONFIGURATION W/ ROTATING STARTS - EQUIPPED AS NOTED ABOVE FOR MASTER -SATELLITE <br />CONFIGURATION EXCEPT WITHOUT SIPHON LINE BETWEEN TANKS: THE UST PRODUCT LEVEL BALANCING IS ACHIEVED BY ROTATING THE STARTING OF <br />INDIVIDUAL IST'S WITH CONTROL LOGIC LINKED TO THE VEEDER ROOT ATG. THE PRODUCT LINES ARE CONNECTED BY A CROSS OVER MANIFOLD <br />BETWEEN TURBINES. ONE IST, THE MASTER, SHALL HAVE A PLLD LEAK DETECTION DEVICE INSTALLED (PART #VER -848-480-001) AND THE <br />SATELLITE SHALL HAVE AN FE PETRO NON -VENTED PRECISION CHECK VALVE (PART #65 PSI) INSTALLED. THE BALL VALVE ON MANIFOLD LINE <br />BETWEEN TURBINES SHALL BE SET IN THE "OPEN" POSITION DURING NORMAL OPERATION. IN CASE OF FAILURE OF AN INDIVIDUAL IST, NO <br />ADJUSTMENT TO THE DISPENSER SIGNAL WIRES WILL BE REQUIRED AS THE IST CONTROLLERS WILL ACCOMMODATE THE IST STARTING VIA THE <br />VEEDER ROOT ATG LINK. THE PRODUCT IN THE UST WITH THE FAILED IST WILL HAVE THE PRODUCT LEFT IN A STATIC STATE AND NOT AVAILABLE <br />FOR DISPENSING UNTIL A REPAIR IS MADE. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br />(7) SIPHON LINE INSTALLATION: <br />STANDARD: WHEN SITE SPECIFIC TANK CONFIGURATION SHOWS MULTIPLE TANKS FOR IDENTICAL PRODUCTS, CONTRACTOR TO INSTALL 4" OVER 3" <br />DOUBLE WALL FIBERGLASS SIPHON LINES AND PIPING CONNECTION VALVES AND FITTINGS BETWEEN TANKS. INSTALL SIPHON PIPING AS LOW AS <br />POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST HEIGHT DOWN FOR SMALLER DIAMETER <br />TANKS. CONTRACTOR TO INSTALL VEEDER ROOT SIPHON BREAK, IF APPROPRIATE FOR MARKET CONDITIONS. SEE APPROPRIATE SITE SPECIFIC <br />DRAWINGS FOR INSTALLATION DETAILS. <br />NYC VARIANT: SIPHON PIPING IS NOT INSTALLED. SEE TURBINE INSTALLATION NOTE ABOVE. SEE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br />ARCO BRANDED VARIANT: CONTRACTOR TO INSTALL 4" OVER 3" DOUBLE WALL FIBERGLASS SIPHON PIPING. SIPHON BREAK IS NOT INSTALLED. <br />INSTALL SIPHON PIPING AS LOW AS POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST <br />HEIGHT DOWN FOR SMALLER DIAMETER TANKS. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. <br />CALIFORNIA VARIANT: SIPHON PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB -2481 REQUIREMENTS <br />(8) PRODUCT PIPING INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS PRODUCT PIPING, CONNECTORS, VALVES AND FITTINGS IN TANK AND DISPENSER <br />SUMPS AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS TO SUPPLY DISPENSERS. PRODUCT PIPING TO BE N.O.V. RED THREAD IIA, 2" INSIDE 3" <br />DIAMETER AS INDICATED ON SITE SPECIFIC FUELING PLAN. ALL PIPING AND FITTINGS SHALL BE UL -971 LISTED IN COMPLIANCE WITH THE JULY 2005 <br />PERFORMANCE STANDARDS, AND SHALL BE COMPATIBLE WITH ETHANOL, INCLUDING BUT NOT LIMITED TO "FLEX FUEL" (85% ETHANOL 15% GASOLINE). <br />PRODUCTS LINES TO BE EQUIPPED 3 GPH PRESSURE LINE LEAK DETECTORS (PLLD) ON TURBINES AND WITH LIQUID LEAK MONITORING SENSORS <br />LOCATED IN TURBINE PIPING SUMPS ATTACHED TO TANKS WIRED FOR TURBINE SHUT DOWN. PRODUCT PIPING IN TURBINE SUMPS, PRODUCT PIPING <br />CROSS CONNECTION MANIFOLDS BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS ARE TO ENTER THE SAME SIDE OF THE SUMP IF POSSIBLE. IF <br />PRODUCT PENETRATION ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD CONDITIONS, THEN DUAL SENSORS AT TURBINE SUMP MAY BE REQUIRED <br />TO BE INSTALLED BY LOCAL REGULATIONS. IF THE BP PROJECT MANAGER DETERMINES THAT THE ALL THE PIPING ENTRIES NOTED ABOVE COULD <br />HAVE BEEN MADE TO THE SAME SIDE OF THE SUMP, THEN ANY COSTS ASSOCIATED WITH EXTRA SENSORS SHALL BE BORNE BY THE INSTALLING <br />CONTRACTOR. PIPING TO BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT MINIMUM TO TANKS UNLESS APPROVED BY OWNER. CONTRACTOR TO <br />INSTALL TRACER TAPE WITH PRODUCT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL FRP <br />ENTRY FITTINGS. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE <br />SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. <br />***NOTE*** "FIBERCAST SYSTEMS" PIPING TO BE INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL AND SHALL ONLY BE INSTALLED BY <br />QUALIFIED INSTALLERS CERTIFIED BY THE MANUFACTURER. <br />CALIFORNIA VARIANT: IN ADDITION TO THE ABOVE, PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB -2481 <br />REQUIREMENTS <br />(9) VENT PIPING INSTALLATION: <br />STANDARD: CONTRACTOR TO INSTALL 2" INDIVIDUAL SINGLE WALL FIBERGLASS VENT PIPING, CONNECTORS, VALVES AND FITTINGS ON TANKS AS <br />INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF PIPING RUN BEFORE A <br />CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO <br />INSTALL TRACER TAPE WITH VENT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH SINGLE WALL ENTRY <br />FITTINGS. VENT PIPING SHALL BE DESIGNED AND INSTALLED FOR SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS. FOR LONG PIPING RUNS 1/8" <br />PER FOOT IS ACCEPTABLE. <br />CONTRACTOR TO INSTALL ABOVE GROUND RISERS AND MOUNTING RACK AS DETAILED ON THESE PLANS. TERMINATION POINT OF TANK VENTS TO BE <br />A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS <br />SHALL BE INSTALLED IN ACCORDANCE WITH NFPA-30, INTERNATIONAL AND UNIFORM FIRE CODE REQUIREMENTS AND CARB EVR REQUIREMENTS. <br />CONTRACTOR TESTING OF VENT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE SITE <br />SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW. <br />t•1n 9115 <br />FIBERCAST SYSTEMS: RED <br />THREAD II PIPE AND FITTINGS <br />(USED FOR SINGLE WALL). WHERE <br />DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT <br />AND VAPOR PIPING, USE <br />SIZE OVER SIZE RED THREAD <br />II PIPING AND FITTINGS. USE <br />ONLY <br />FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES. <br />ALL PIPING AND FITTINGS <br />SHALL BE UL -971 LISTED IN <br />COMPLIANCE WITH THE JULY <br />2005 <br />PERFORMANCE STANDARDS. <br />PIPING TO BE INSTALLED <br />PER MANUFACTURER'S LISTED <br />INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE <br />MANUFACTURER. PROVIDE <br />AT LEAST 4' OF STRAIGHT PIPING <br />RUN BEFORE A CHANGE <br />OF DIRECTION <br />OF MORE THAN 30 DEGREES AND INSTALL <br />FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, <br />AND <br />DISPENSER SUMPS. <br />NYC VARIANT: SAME AS ABOVE EXCEPT: VENT CONNECTIONS ARE ROUTED TO A SEPARATE UNOBSTRUCTED EXTRACTOR FITTING LOCATED IN THE <br />TURBINE SIDE. VENT TERMINATION TO BE A MINIMUM OF 15' ABOVE GRADE. <br />JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. <br />CALIFORNIA VARIANT: VENT PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB -2481 <br />REQUIREMENTS <br />STANDARD: CONTRACTOR TO INSTALL 3" SINGLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER, CONNECTORS, VALVES AND FITTINGS TO THE <br />LOWEST OCTANE GRADE AS INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. NOTE THAT THE 1ST CONNECTION FROM STAGE <br />II VAPOR RECOVERY HEADER TO LOWEST OCTANE TANK SHALL BE 3". ALL OTHER CONNECTIONS TO ADDITIONAL TANKS SHALL BE MADE WITH 2". <br />CONTRACTOR TO INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. MAXIMUM (2) DISPENSERS PER 2" BRANCH. <br />CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO <br />PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING PER TRENCHING DETAILS. <br />PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL ENTRY FITTINGS. STAGE II VAPOR RECOVERY PIPING SHALL BE DESIGNED AND <br />INSTALLED FOR 1/4" PER FOOT MINIMUM SLOPE BACK TO TANKS. AT LARGE SITE LAYOUTS, 1/8" PER FOOT MINIMUM IS ACCEPTABLE IF IT AVOIDS <br />USING A KNOCK OUT SUMP (VAPOR POT) OR HAVING EXCESSIVE TANK DEPTH. CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP <br />PROJECT MANAGER, WHERE DISCREPANCIES OCCUR. <br />CONTRACTOR TESTING OF STAGE II VAPOR LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. <br />SEE SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW. <br />VITO�la10[e>�yaIto19[on_, 9615 <br />FIBERCAST SYSTEMS: RED <br />THREAD II PIPE AND FITTINGS <br />(USED FOR SINGLE WALL). WHERE <br />DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT <br />AND VAPOR PIPING, USE <br />SIZE OVER SIZE RED THREAD <br />II PIPING AND FITTINGS. USE <br />ONLY <br />FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES. <br />ALL PIPING AND FITTINGS <br />SHALL BE UL -971 LISTED IN <br />COMPLIANCE WITH THE JULY <br />2005 <br />PERFORMANCE STANDARDS. <br />PIPING TO BE INSTALLED <br />PER MANUFACTURER'S LISTED <br />INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE <br />MANUFACTURER. PROVIDE <br />AT LEAST 4' OF STRAIGHT PIPING <br />RUN BEFORE A CHANGE <br />OF DIRECTION <br />OF MORE THAN 30 DEGREES AND INSTALL <br />FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, <br />AND <br />DISPENSER SUMPS. <br />JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. <br />CALIFORNIA VARIANT: STAGE II VAPOR PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB -2481 <br />REQUIREMENTS. ALL CONNECTIONS TO THE TANKS SHALL BE MADE WITH 3". <br />THERE ARE (4) FOUR STAGE II EVR WITH ISD DESIGN CHOICES THAT MAY BE INCORPORATED INTO THE UST SYSTEMS IN CALIFORNIA. <br />1. VEEDER ROOT CARBON CANISTER VAPOR POLISHER WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. <br />2. HEALY CLEAN AIR SEPARATOR WITH HEALY VACUUM ASSIST HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. <br />3. VST ECS VAPOR PROCESSOR WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. <br />4. VST BALANCE HANGING HARDWARE WITH FRANKLIN FUELING/HEALY CLEAN AIR SEPARATOR AND VEEDER ROOT ISD COMPONENTS. <br />SEE GENERAL SHEETS G.0.6 SERIES DRAWINGS FOR DESIGN INTENT DETAILS ON THE ABOVE SYSTEMS. <br />NYC VARIANT: STAGE II VAPOR RECOVERY IS CURRENTLY NOT REQUIRED IN NYC & NEW JERSEY MARKET <br />NOTE: CONTACT BP FUEL SYSTEM DESIGN MANAGER FOR CURRENT STATES NO LONGER REQUIRING STAGE II VAPOR RECOVERY <br />(10A) DECOMMISSIONING STAGE II VAPOR RECOVERY: <br />STANDARD: FOR PROJECTS INVOLVING THE DECOMMISSIONING OF STAGE II VAPOR RECOVERY SYSTEMS, G.C. IS TO VERIFY WITH THE AUTHORITY <br />HAVING JURISDICTION THAT STAGE II IS NO LONGER REQUIRED AT A SPECIFIC FACILITY BEFORE INITIATING THE DECOMMISSIONING WORK AND WHICH <br />DECOMMISSIONING PROCEDURES ARE REQUIRED TO BE IMPLEMENTED. SEE SHEET G.0.6.15. FOR GENERAL REQUIREMENTS AND PROCEDURES. <br />CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, WHERE DISCREPANCIES OCCUR BETWEEN THE CONTRACT <br />DOCUMENTS AND THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. <br />CLIENT: <br />4: bp <br />'Ad & <br />lir <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. <br />DATE <br />DESCRIPTION <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />io <br />0 <br />0 <br />SEAL: <br />FESS /0 <br />GH9p�l <br />N0. 36475 <br />* XP. 6-30-22 <br />ATF <br />OFF CAUF��� <br />z <br />Lu <br />w <br />•Q <br />co <br />U <br />zoo 0 <br />Z <br />2E Lu <br />z co r <br />0v7rnco <br />mZ <br />UOQ <br />�QU <br />� <br />� M Q <br />fr <br />QW <br />I I w�w <br />} <br />WZooLL <br />Ozc <br />Z <br />Uz <br />cozVo <br />co <br />7Uo <br />z <br />Q <br />z Q z N <br />- <br />WzO- <br />�w <br />wQ}� <br />z Lo Q -- <br />06 <br />z . t <br />� <br />Q <br />w 00 w <br />O <br />O <br />z = <br />z 0- <br />z <br />g <br />oL <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT NO: <br />10/23/2019 <br />DRAWING TITLE: <br />TANK AND PIPING <br />SCOPE OF WORK <br />AND GENERAL NOTES <br />(FRP 1 OF 3) <br />SHEET NO: <br />