TANK AND PIPING INSTALLATION SCOPE OF WORK:
<br />(1 1) METAL PIPE AND FITTINGS:
<br />E -STOP
<br />DISCONNECTS
<br />THE HOT AND NEUTRAL WIRES TO THE DISPENSERS
<br />ENSURE THAT THE
<br />E -STOP
<br />STANDARD: STEEL PIPE SHOWN ON
<br />THESE DRAWINGS
<br />TO BE
<br />MINIMUM
<br />SCHEDULE 40. METAL PRODUCT LINE
<br />FITTINGS TO BE MALLEABLE IRON CLASS
<br />150, GALVANIZED. ALL MALLEABLE
<br />IRON FITTINGS SHALL
<br />BE SUPPLIED
<br />BY "ANVIL" (FORMERLY "GRINNELL")
<br />OR EQUAL SPECIFICATIONS AS FOLLOWS:
<br />TURBINE
<br />DIMENSIONS
<br />MATERIAL
<br />GALVANIZING THREAD
<br />PRESSURE RATING
<br />M.I. FITTINGS
<br />HAS ITS OWN
<br />DEDICATED CIRCUIT
<br />ENSURE THAT THE
<br />DISPENSING
<br />EQUIPMENT
<br />IS GROUNDED PER NEC
<br />(TEES, ELBOWS)
<br />0
<br />0
<br />CLASS 150/PN 20
<br />ASME 816.3
<br />ASTM
<br />A-197
<br />ASTM
<br />A-153 ASME B.1 20.1
<br />ASME B16.3
<br />M.I. UNIONS
<br />SEAL:
<br />FESS /0
<br />Gf-�gp�l
<br />NO. 36475
<br />* XP. 6-30-22
<br />CLASS 150/PN 20
<br />ASME 816.39
<br />ASTM
<br />A-197
<br />ASTM
<br />A-153 ASME B.1 20.1
<br />ASME B16.3
<br />STEEL PIPE NIPPLES
<br /><z 00 o
<br />Z
<br />z LU
<br />00
<br />cnrnco
<br />CLASS 150/PN 20
<br />ASTM A733
<br />ASTM
<br />A-53
<br />ASTM
<br />A-153 ASME B.1 20.1
<br />ASME B16.3
<br />(F OR
<br />E)
<br />LLJ<
<br />z Q --
<br />STEEL PIPE
<br />z 3 t
<br />�
<br />Q
<br />w 00 w
<br />o
<br />0
<br />z =
<br />CLASS 150/PN 20
<br />N/A
<br />ASTM
<br />A-53
<br />ASTM
<br />A-153 ASME B.1 20.1
<br />ASME B16.3
<br />SCHEDULE 40
<br />ADDRESS
<br />(F OR
<br />E)
<br />DESIGNED BY:
<br />GASOLINE/ALCOHOL COMPATIBLE THREAD SEALANT LIKE LOCTITE
<br />567
<br />SHALL BE
<br />USED ON ALL THREADED PIPE CONNECTIONS.
<br />ANY METAL PIPE OR FITTING USED
<br />FOR PRODUCT, VENT, OR
<br />VAPOR
<br />RECOVERY
<br />WHICH CONTACTS SOIL OR
<br />BACK FILL MUST BE 100% COVERED WITH
<br />A 3M SCOTCHRAP PRIMER AND 3M
<br />TEMFLEX 10 MIL.
<br />OR 10
<br />MIL. SELF -PRIME
<br />PROSELECT PIPE TAPE.
<br />STANDARD: CONTRACTOR TO INSTALL SUMP PENETRATION FITTINGS. ALL PENETRATIONS OF THE SUMPS TO BE ON A LINE TOWARD THE CENTER OF
<br />THE SUMP, NOT TO EXCEED MANUFACTURERS RECOMMENDED ANGLE IN ANY DIRECTION, TO ENSURE THE PROPER INSTALLATION OF ALL BULKHEAD
<br />AND COMPRESSION FITTINGS AND RESULTANT WATER TIGHTNESS. ALL PIPING, CONDUIT AND GROUNDS THAT PENETRATE THE SUMP SIDE WALLS MUST
<br />BE SEALED WITH DOUBLE SIDED BULKHEAD FITTINGS IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD
<br />OF 24 HOURS OR CERTIFIED USING SUMP MANUFACTURERS APPROVED TESTING PROCEDURE TO INSURE THAT SUMPS ARE WATERTIGHT. THE OWNER'S
<br />ENGINEER, THE BP PROJECT MANAGER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECK LIST.
<br />MANUFACTURER ENTRY BOOT TYPE VARIANT: THE MAKE AND MODEL NUMBERS OF THE PIPING PENETRATION FITTINGS SHOWN IN THE DETAILS ARE
<br />NOT SUBJECT TO CHANGE. N.O.V. FRP BONDED ENTRY FITTINGS ARE REQUIRED FOR ALL PIPING PENETRATIONS. CONDUIT PENETRATIONS INTO SUMPS
<br />SHALL BE AS SPECIFIED ON THE PLANS.
<br />CALIFORNIA VARIANT: CONTRACTOR TO INSTALL SUMP PENETRATION FITTINGS THAT MEET THE ADDITIONAL CRITERIA REQUIREMENT FOR CONTINUOUS
<br />HYDROSTATIC AND VACUUM MONITORING.
<br />(13) DISPENSER INSTALLATION:
<br />STANDARD: CONTRACTOR TO INSTALL "WAYNE OVATION" STYLE DISPENSERS WITH INTEGRATED CARD READERS AND INTERCOM SYSTEM AS SHOWN ON
<br />SITE SPECIFIC DESIGN DETAIL SHEETS. DISPENSERS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALLATION TO INCLUDE
<br />DISPENSER ISLANDS, SINGLE WALL DISPENSER CONTAINMENT SUMPS, AND THE INSTALLATION OF ALL SHEAR VALVES, RISERS, PIPING CONNECTIONS
<br />AND ALL PENETRATIONS INTO THE SUMPS. SEE TANK ELECTRICAL DRAWINGS FOR CONDUIT AND WIRING REQUIREMENTS.
<br />DISPENSER START UP: - START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE MINIMUM.
<br />ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED
<br />BACK TO THE CONTRACTOR
<br />NYC VARIANT: DISPENSER SUMPS SHALL BE BACK FILLED WITH PEA GRAVEL PER NYC CODE. DISPENSER ISLAND SHALL BE EQUIPPED WITH A FIRE
<br />SUPPRESSION SYSTEM. SEE FIRE SUPPRESSION DETAILS FOR INSTALLATION REQUIREMENTS.
<br />ARCO BRANDED VARIANT: DISPENSERS INSTALLED WITHOUT CARD READERS IN DISPENSERS. CONTRACTOR TO INSTALL TWO (2) DOUBLE SIDED
<br />PAYMENT ISLAND CASHIERS (PIC UNITS) AS SHOWN ON SITE SPECIFIC PLANS. START UP BY MANUFACTURERS REPRESENTATIVE. START UP PROBLEMS
<br />DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. REFER TO
<br />ARCHITECTURAL CANOPY DRAWINGS FOR ADDITIONAL SITE PREP AND CONDUIT REQUIREMENTS.
<br />CALIFORNIA VARIANT: DISPENSER SUMPS TO BE DOUBLE WALL AND INSTALLED WITH CONTINUOUS HYDROSTATIC MONITORING DEVICE PER AB -2481
<br />REQUIREMENTS
<br />INSTALLATION OF HANGING HARDWARE:
<br />STANDARD: - CONTRACTOR TO INSTALL VAPOR ASSIST HOSES, NOZZLES, SWIVELS AND BREAK AWAY VALVES PER '96' CARB EXECUTIVE ORDER
<br />G -70 -153 -AD. SITES WHERE ORVR COMPATIBLE SYSTEMS ARE NOT REQUIRED
<br />ARCO BRAND VARIANT - CONTRACTOR TO INSTALL ORVR COMPATIBLE BALANCE HOSES, NOZZLES, SWIVELS AND BREAK AWAY VALVES PER CARB
<br />EXECUTIVE ORDER G -70 -52 -AM PER LOCAL STATUES.
<br />CALIFORNIA VARIANT - CONTRACTOR TO INSTALL ORVR/PHASE II EVR COMPATIBLE HOSES, NOZZLES, SWIVELS AND BREAK AWAY VALVES PER
<br />APPLICABLE CARB EXECUTIVE ORDER WITH IN SYSTEM DIAGNOSTICS (ISD) PER LOCAL JURISDICTIONAL REQUIREMENTS.
<br />NEW JERSEY VARIANT - CONTRACTOR TO INSTALL LOW PERMEATION HOSE AND COMPATIBLE HARDWARE. SEE SHEET G.0.6.15
<br />14) SUMP SENSOR INSTALLATION:
<br />CONTRACTOR TO INSTALL ALL FILL SUMP TURBINE SUMP AND DISPENSER SUMP SENSORS PER VEEDER ROOT INSTALLATION INSTRUCTIONS. SUMP
<br />SENSORS TO BE INSTALLED IN SUMP HOLDERS MOUNTED TO SIDE OF SUMP WALLS SEE TANK DETAIL SHEETS FOR LIQUID SENSOR DETAILS.
<br />TURBINE SIDE SUMP SENSORS TO BE MOUNTED AT SIDE OF TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW LOWEST
<br />PENETRATION FITTING WITHIN SUMP AREA AT BOTTOM OF SUMP. SEE TANK ELECTRICAL DRAWINGS FOR MONITORING CONDUIT DETAILS AND SENSOR
<br />AND PROBE WIRING DETAILS.
<br />(15) OVERFILL ALARM AND ACKNOWLEDGE SWITCH INSTALLATION:
<br />CONTRACTOR TO INSTALL OVERFILL ALARM & ACKNOWLEDGMENT AS SHOWN. ALARM AND SWITCH TO BE LOCATED TO PROVIDE AN
<br />UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE. SEE SITE SPECIFIC WIRING DIAGRAM
<br />AND DETAILS FOR MOUNTING REQUIREMENTS.
<br />(16) VEEDER ROOT CONSOLE INSTALLATION:
<br />CONTRACTOR TO INSTALL "VEEDER ROOT TLS -350 PLUS" TANK AND LINE ALARM CONTROL PANEL IN BUILDING. INSTALL PER
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION IN BUILDING
<br />CALIFORNIA VARIANT: TLS -350 PLUS CONSOLE TO BE EQUIPPED WITH ADDITIONAL SENSOR MODULES TO ADDRESS AB -2481 AND CARB ISD
<br />REQUIREMENTS.
<br />NYC VARIANT: CONSOLE TO BE PROGRAMMED FOR MASTER/MASTER ALTERNATE START
<br />(17) CONCRETE SLAB INSTALLATION:
<br />REFER TO PROJECT GENERAL SPECIFICATIONS FOR ADDITIONAL CONCRETE REQUIREMENTS NOT INDICATED ON THESE DRAWINGS.
<br />STANDARD:
<br />1. CONCRETE SLAB OVER TANKS WITH A MINIMUM 8" THICK FIBER REINFORCEMENT TO BE USED. REINFORCE CONCRETE SLAB
<br />AROUND MANHOLES WITH (4) #4 REBAR, 60" IN LENGTH FOR THE LARGE MANHOLES AND 30" FOR SMALL MANHOLES
<br />PLACE REBAR 6" FROM SIDES OF BOX. SEE RECIPE BELOW.
<br />2. CONCRETE DRIVE SLAB AT CANOPY FUELING AREA WITH A MINIMUM 6" THICK FIBER REINFORCED CONCRETE TO BE USED.
<br />SEE RECIPE BELOW.
<br />3. CONCRETE FORMLESS ISLAND WITH A 6" HEIGHT ABOVE FINISHED GRADE FIBER REINFORCED CONCRETE TO BE USED.
<br />SEE RECIPE BELOW.
<br />NYC VARIANT:
<br />1. CONCRETE SLAB OVER TANKS WITH A MINIMUM 10" THICKNESS AND BELOW TANKS WITH A MINIMUM 12" THICKNESS,
<br />REINFORCED WITH TWO LAYERS OF 6X6-W5.5XW5.5 ON 2" STEEL CHAIRS TOP & BOTTOM. REINFORCE CONCRETE SLAB
<br />AROUND MANHOLES WITH (4) #4 REBAR, 60" IN LENGTH FOR THE LARGE MANHOLES AND 30" FOR SMALL MANHOLES
<br />PLACE REBAR 6" FROM SIDES OF BOX. SEE RECIPE BELOW.
<br />2. LOAD BEARING 12"X16" CONCRETE BLOCK PIERS FILLED WITH TYPE "M" MORTAR SPACED NO MORE THAN 3'-2" APART.
<br />FOR ALTERNATE SONOTUBE PIER CONFIGURATION A MINIMUM 16" DIAMETER CONCRETE PIER WITH #3 REBAR HORIZONTAL
<br />TIES SPACED EVERY 2' VERTICALLY AND (5) #5 VERTICAL REBARS SPACE EQUALLY
<br />3. CONCRETE DRIVE SLAB AT CANOPY FUELING AREA WITH A MINIMUM 6" THICK, REINFORCED WITH TWO LAYERS OF
<br />6X6-W5.5XW5.5 ON 2" STEEL CHAIRS TOP & BOTTOM.
<br />4. CONCRETE FORMLESS ISLAND WITH A 6" HEIGHT ABOVE FINISHED GRADE FIBER REINFORCED CONCRETE TO BE USED. SEE
<br />RECIPE BELOW.
<br />5. CONCRETE WALKWAY WITH A MINIMUM 4" THICK FIBER REINFORCED CONCRETE TO BE USED. SEE RECIPE BELOW.
<br />6. CONCRETE DRIVEWAY WITH A MINIMUM 7" THICK FIBER REINFORCED CONCRETE TO BE USED. SEE RECIPE BELOW.
<br />CALIFORNIA VARIANT:
<br />1. CONCRETE SLAB OVER TANKS WITH A MINIMUM 8" THICK FIBER REINFORCEMENT TO BE USED. REINFORCE CONCRETE SLAB
<br />AROUND MANHOLES WITH (4) #4 REBAR, 60" IN LENGTH FOR THE LARGE MANHOLES AND 30" FOR SMALL MANHOLES
<br />PLACE REBAR 6" FROM SIDES OF BOX. SEE RECIPE BELOW.
<br />2. THICKEN CONCRETE SLAB AT DISPENSER SUMPS AND TANK FILL AND TURBINE SUMPS SUCH THAT THE BOTTOM OF
<br />CONCRETE IS BELOW THE TOP OF THE TERMINATION OF THE SECONDARY CONTAINMENT OF THE SUMPS PER AB -2481
<br />REQUIREMENTS.
<br />3. CONCRETE DRIVE SLAB AT CANOPY FUELING AREA WITH A MINIMUM 6" THICK FIBER REINFORCED CONCRETE TO BE USED.
<br />SEE RECIPE BELOW.
<br />4. CONCRETE FORMLESS ISLAND WITH A 6" HEIGHT ABOVE FINISHED GRADE FIBER REINFORCED CONCRETE TO BE USED.
<br />SEE RECIPE BELOW.
<br />CONCRETE MIX RECIPE. PREMIX UNIFORMLY THROUGHOUT CONCRETE. REINFORCEMENT BARS TO BE NO LESS THAN 2" AND NO
<br />MORE THAN 4" FROM SURFACE.
<br />UNLESS OTHERWISE NOTED ON THESE DRAWINGS:
<br />a. CONCRETE - REGULAR WEIGHT HARD ROCK CONCRETE (150 LBS/CU FT)
<br />b. CEMENT - TYPE 1/II, SULFATE RESISTANT
<br />c. AGGREGATES - ASTM C33, (MAXIMUM SIZE 3/4 INCHES)
<br />d. 28 DAY CONCRETE STRENGTH (f'c):
<br />4,000 PSI - SLAB (DESIGN BASED ON 2,000 PSI NO SPECIAL INSPECTION REQUIRED)
<br />e. SLUMP - 311+ 1 " - 4" MAXIMUM AT POINT OF PLACEMENT
<br />f. SHRINKAGE - 0.05% MAXIMUM
<br />9. ENTRAINED AIR RANGE - 2% TO 4%
<br />CONCRETE SHALL BE NORMAL WEIGHT WITH A MIX OF 1 : 2 1/2 : 3 1/2, WITH A MAXIMUM 7 1/2 GALLONS OF WATER PER
<br />SACK. ADD 3.0 LB MARCO (STRUCTURAL) FIBER PER CU. YD. REINFORCING CONCRETE.
<br />REINFORCING STEEL FOR TANK SUMP CAGES SHALL BE #4 REBAR.
<br />MAINTAIN CONCRETE IN A MOIST CONDITION FOR AT LEAST 7 DAYS AFTER PLACEMENT.
<br />PLACE CONCRETE DIRECTLY FROM TRUCK INTO FORMS. DO NOT PUMP CONCRETE UNLESS SPECIAL INSPECTION, IN ACCORDANCE WITH
<br />CHAPTER 3 OF THE IBC, IS PROVIDED.
<br />SUBMIT MIX DESIGNS, WITH STRENGTH AND SHRINKAGE TEST RESULTS, TO OWNER'S ENGINEER AT LEAST 7 DAYS BEFORE PLACING CONCRETE.
<br />CONSOLIDATE CONCRETE IN PLACE USING A MECHANICAL VIBRATOR.
<br />BEFORE PLACING CONCRETE, SECURE REINFORCING STEEL, ANCHOR BOLTS, DOWELS, AND OTHER INSERTS IN POSITION TO PREVENT
<br />MOVEMENT.
<br />MATERIALS AND WORKMANSHIP SHALL CONFORM TO A.C.I. - 318 (SPECIFICATIONS OF THE DESIGN AND PLACEMENT OF CONCRETE).
<br />MANHOLE CROWNS:
<br />ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH A 1-1/2" CROWN (1" RISE OVER 12" RUN) OF
<br />CONCRETE TO PREVENT WATER INTRUSION INTO THE MANHOLE. THE OWNER'S ENGINEER, THE BP PROJECT MANAGER WILL BE
<br />REQUIRED TO SIGN OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST.
<br />PRODUCT IDENTIFICATION MARKINGS:
<br />CONTRACTOR TO INSTALL PRODUCT IDENTIFICATION TAGS AT ALL MANHOLE OPENING PER SITE SPECIFIC DETAIL DRAWINGS.
<br />(18) TESTING:
<br />CONTRACTOR SHALL COMPLETE ALL TESTING ACCORDING TO MANUFACTURER'S INSTRUCTIONS FOR TANKS AND PIPING AND PER INDUSTRY
<br />RECOMMENDED PRACTICES (API & PEI). CONTRACTOR SHALL COMPLETE ALL WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO
<br />OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER.
<br />PIPE TESTING:
<br />ISOLATE THE PRODUCT TANKS AND DISPENSERS DURING PRESSURE TESTING OF LINES IN ORDER TO PREVENT DAMAGE.
<br />THE DESIGN, ASSEMBLY, AND TESTING OF THE PIPING SYSTEM SHALL BE IN CONFORMANCE WITH THE APPLICABLE SECTION
<br />OF ANSI -1331, AMERICAN NATIONAL STANDARD CODE FOR PRESSURE PIPING, NFPA 30, FLAMMABLE AND COMBUSTIBLE
<br />LIQUIDS CODE, AND AMERICAN PETROLEUM INSTITUTES RECOMMENDED PRACTICE 1615.
<br />DURING CONSTRUCTION, BEFORE BACK FILLING, PIPING SHOULD BE ISOLATED FROM THE TANKS AND SUBJECTED TO A PIPE TIGHTNESS TEST.
<br />OTHER TESTING METHODS MAY ALSO BE ACCEPTABLE IF APPROVED BY THE AUTHORITY HAVING JURISDICTION. A CONSTRUCTION PIPE TEST IS
<br />CONDUCTED AS FOLLOWS:
<br />A. THE PRODUCT PIPING TO BE TESTED IS ISOLATED AND PRESSURIZED WITH COMPRESSED AIR TO 150 PERCENT OF THE MAXIMUM SYSTEM
<br />OPERATING PRESSURE (OR A MINIMUM OF 50 POUNDS PER SQUARE INCH GAUGE; MAXIMUM AS RECOMMENDED BY COMPONENT MANUFACTURER)
<br />FOR AT LEAST 30 MINUTES AND NOT MORE THAN 1 HOUR.
<br />B. ALL PIPING SURFACES INCLUDING VALVES, FITTINGS, JOINTS, AND SO FORTH ARE WETTED WITH A SOAP SOLUTION AND INSPECTED FOR
<br />BUBBLES.
<br />C. LEAKS, AS INDICATED BY BUBBLES, ARE REPAIRED OR REPLACED, AND THE PIPING RE -TESTED AS NECESSARY.
<br />D. THE INNER PIPE WALLS SHALL BE TESTED FOR TIGHTNESS BEFORE CLOSING THE OUTER PIPE. THE OUTER PIPE MUST BE TESTED AT A 5
<br />POUNDS PER SQUARE INCH GAUGE MAXIMUM BEFORE BACKFILLING. CARE SHOULD BE TAKEN TO PREVENT OVER PRESSURIZATION OF THE
<br />INTERSTICE. IT IS IMPORTANT THAT THE MANUFACTURER'S INSTRUCTIONS BE FOLLOWED. REPEAT BOTH TESTS AFTER BACKFILLING.
<br />WHEN THE PIPING IS INSTALLED AND OPERATIONAL, A HYDROSTATIC TEST OF THE PIPING, AS SPECIFIED IN NFPA 329, MAY BE REQUIRED BY
<br />CODES.
<br />CAUTION: EXTREME CARE SHOULD BE EXERCISED IN CONDUCTING PIPE TIGHTNESS TEST. PRESSURIZED PIPING IS POTENTIALLY DANGEROUS
<br />BECAUSE OF THE POSSIBILITY OF VIOLENT RUPTURE. THIS TEST SHOULD BE CONDUCTED WITH MINIMUM EXPOSURE OF PERSONNEL AND WITHOUT
<br />MOVING OR DISTURBING THE PIPING BEING TESTED. WHEN THE TEST IS COMPLETED, THE PIPING PRESSURE CAN BE REDUCED OR RELEASED
<br />COMPLETELY FOR THE REMAINDER OF CONSTRUCTION. REFER TO THE PIPING MANUFACTURER'S RECOMMENDATIONS.
<br />N.O.V. PIPING SHALL BE TESTED ACCORDING TO MANUFACTURER'S SPECIFICATIONS.
<br />VAPOR RECOVER PIPING MUST PASS ALL CARB BLOCKAGE TESTING RELATIVE TO TIGHTNESS, PRESSURE DECAY, & BLOCKAGE RATES. A/L TESTING
<br />IS REQUIRED FOR "ASSISTED" STAGE II SYSTEMS (IF INSTALLED). NOTIFY THE BP PROJECT MANAGER TO COORDINATE.
<br />CONTAINMENT SUMP TESTING:
<br />ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH STANDING WATER
<br />ABOVE THE LEVEL OF THE HIGHEST PIPE OR CONDUIT PENETRATION FOR A PERIOD OF 24 HOURS AFTER ALL WORK IS COMPLETED TO
<br />INSURE THAT THE SUMPS ARE WATERTIGHT OR CERTIFIED USING SUMP MANUFACTURER'S APPROVED TEST PROCEDURE TO INSURE THAT
<br />SUMPS ARE WATERTIGHT PER UST REGULATIONS. THE OWNER'S ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION
<br />CHECKLIST.
<br />CALIFORNIA VARIANT: ALL DOUBLE WALL SUMPS SHALL BE BRINE FILLED AND INSPECTED FOR TIGHTNESS THROUGHOUT THE INSTALLATION
<br />PROCESS ONCE SUMPS HAVE BEEN FILLED WITH BRINE SOLUTION.
<br />FINAL SYSTEM TESTING:
<br />AFTER COMPLETE INSTALLATION OF THE ENTIRE FUEL SYSTEM AND ALL PAVING, THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT
<br />MANAGER, SHALL ARRANGE FOR A PRECISION TANK AND LINE TEST TO BE PERFORMED ON THE COMPLETE SYSTEM. SUCCESSFUL COMPLETION OF
<br />THIS TEST WILL BE REQUIRED FOR FINAL APPROVAL. THIS TEST SHALL ENSURE THAT ALL NEW TANK & PIPING SHALL MEET ALL FEDERAL, STATE,
<br />& LOCAL REQUIREMENTS FOR TIGHTNESS INTEGRITY, PRIOR TO START-UP OF SYSTEM. OPERATIONALLY TEST ALL OTHER EQUIPMENT, INCLUDING
<br />IMPACT (SHEAR) VALVES, LINK LEAK DETECTORS, LEAK DETECTOR ALARMS, AND EMERGENCY SHUTDOWN SWITCHES IN ACCORDANCE WITH THE
<br />MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE (3) COPIES OF ALL CERTIFICATIONS & TEST RESULTS TO OWNER'S REPRESENTATIVE
<br />OR HIS AGENT, THE BP PROJECT MANAGER.
<br />TANK SYSTEM TEST METHOD CALIFORNIA ONLY AB -2481:
<br />BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK SHALL BE TESTED AFTER
<br />INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK IS PRODUCT TIGHT:
<br />1) ENHANCED LEAK DETECTION (ELD) BY TRACER CORPORATION.
<br />2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD.
<br />3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN
<br />REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. AN UNDERGROUND STORAGE TANK INSTALLED AND TESTED
<br />IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF SECTION 25292.5.
<br />(19) CHECKING FOR PRODUCT QUALITY: INITIAL SITE COMMISSIONING RECOMMENDED PRACTICES
<br />BEFORE OPENING YOUR STORE, IT IS APPROPRIATE AND PROPER PROCEDURE TO CHECK YOUR FUELING EQUIPMENT TO MINIMIZE POSSIBLE
<br />PRODUCT QUALITY ISSUES. THIS GUIDANCE MUST BE FOLLOWED TO ENSURE THAT PRODUCT QUALITY HAS BEEN MAINTAINED, AND IS
<br />ACCEPTABLE FOR OUR CUSTOMERS.
<br />THE UNDERLYING ASSUMPTION IS THAT THE GENERAL CONTRACTOR, WHO WAS RESPONSIBLE FOR BUILDING YOUR STATION, HAS PROPERLY
<br />PERFORMED THEIR JOB AND CHECKED THAT TANKS AND PIPING HAVE BEEN PROPERLY INSTALLED, TESTED, CLEANED, AND LABELED AT A
<br />MINIMUM. ANY BP AREA MAINTENANCE MANAGER, OR BP PROJECT MANAGER, HAS A CHECKLIST SHOWING KEY POINTS TO LOOK FOR
<br />BEFORE ACCEPTING A SITE AS "COMPLETE" FROM THE CONTRACTOR. SOME KEY AREAS ARE AS FOLLOWS:
<br />K�l�lyl:��f�7/�tl��:iil�:�/����:ii]:DI��Ltely7/\�/�:3��►■1►��11���:1_���.1��1��:����:��
<br />2. PERFORM A FINAL INSPECTION FOR THE PRESENCE OF WATER IN THE PIPING TO THE DISPENSERS BY OPENING THE TURBINE
<br />DISCHARGE CONNECTION AT EACH TURBINE SUMP, AND OPENING/REMOVING THE BLEEDER/TEST PLUG ON IMPACT VALVE. ANY TRAPPED
<br />LIQUIDS SHOULD DRAIN BACK TO THE TURBINE SUMP FOR REMOVAL.
<br />3. CONFIRM THAT BOTH GASOLINE AND DIESEL DISPENSERS ARE INSTALLED WITH A MINIMUM (MEANING A MESH SIZE NOT GREATER
<br />THAN) 10 MICRON FILTER. ANY FACTORY INSTALLED FILTER AFTER STARTUP MUST BE DISCARDED IN ACCORDANCE WITH USED FUEL
<br />FILTER WASTE MANAGEMENT ENVIRONMENTAL GUIDELINES.
<br />4. CONFIRM THAT PROPER DECALS, TAX NUMBERS, AND OTHER SIGNAGE REQUIRED PER PLANS, REGULATORY REQUIREMENTS, AND
<br />CONTRACTUAL AGREEMENTS ARE INSTALLED.
<br />5. PERFORM A FINAL INSPECTION FOR THE PRESENCE OF WATER WITHIN THE UNDERGROUND STORAGE TANKS, OR IN THE PIPING
<br />GOING TO THE DISPENSERS. INSPECTION FOR WATER IN THE TANK SHALL BE PERFORMED USING SARGEL'S WATER FINDING PASTE (OR
<br />EQUAL), AND CONDUCTED AT BOTH ENDS OF THE TANK. IF LEVELS OF WATER GREATER THAN 1/4" ARE DETECTED, PROCEED WITH
<br />WATER ELIMINATION PROCEDURES, AND REQUEST THAT THE CONTRACTOR DO THIS AS PART OF THEIR SCOPE OF WORK.
<br />6. THE BP REPRESENTATIVE (REGIONAL ACCOUNT EXECUTIVE OR FRANCHISE CONSULTANT) SHALL BE INFORMED OF ALL MAJOR
<br />MILESTONES LEADING UP TO SITE START-UP. BP RESERVES THE RIGHT TO REQUEST COPIES OF INSPECTION REPORTS BEFORE INITIAL
<br />SITE START-UP.
<br />7. AFTER DELIVERY OF THE FIRST LOAD OF PRODUCTS, EACH PRODUCT MUST BE TESTED AND THE RESULTS PROVIDED TO THE BP
<br />AREA MAINTENANCE MANAGER AND TO THE BP PROJECT MANAGER, PRIOR TO ANY SALE.
<br />COSTS OF THE SAMPLING AND ANALYSIS ARE TO BE INCLUDED IN THE CONTRACTOR'S SCOPE OF WORK. A LABORATORY CERTIFIED TO
<br />CONDUCT FUELS SAMPLING AND TESTING MUST BE USED.
<br />(20) TANK ELECTRICAL SPECIFICATIONS:
<br />GENERAL:
<br />ALL MATERIALS AND WORKMANSHIP WILL CONFORM TO THE MOST RECENT EDITIONS OF THE NATIONAL ELECTRICAL CODE, N.E.T.A., B.I.C.S.I.,
<br />U.B.C. & NFPA AS REQUIRED BY THE ENGINEER, LOCAL AND STATE CODES AND ORDINANCES, AMERICANS WITH DISABILITIES ACT, E.P.A.,
<br />AND UTILITY COMPANY REQUIREMENTS.
<br />THE CONTRACTOR WILL VISIT THE JOB SITE AND FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS WHICH MAY AFFECT HIS BID OR
<br />WORK. NO ALLOWANCES WILL BE MADE AFTER THE BID FOR EXISTING CONDITIONS OR THE CONTRACTORS FAILURE TO VERIFY EXISTING
<br />CONDITIONS.
<br />FURNISH AND INSTALL A COMPLETE ELECTRICAL SYSTEM AS DEPICTED FROM THE PLANS AND SPECIFICATIONS HEREIN - AS NOTED OR
<br />IMPLIED - NOT LIMITED TO WHAT IS SHOWN.
<br />ALL DRAWINGS ARE SCHEMATIC IN NATURE AND ALL APPURTENANCES NOT INDICATED TO MAKE A WORKING SYSTEM MUST BE INCLUDED
<br />IN CONTRACTOR'S BID.
<br />IF THERE APPEARS TO BE ANY ITEMS IN CONFLICT WITH THE DRAWINGS INCONSISTENCIES WITH DESIGN OR INTENT OR NEED FOR
<br />CLARIFICATION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLARIFY THESE ITEMS PRIOR TO BID IN WRITING WITH THE ENGINEER. IF
<br />THE CONTRACTOR FAILS TO CLARIFY ANY QUESTIONS OR INCONSISTENCY, THEY ACCEPT RESPONSIBILITY TO CORRECT AT THEIR COST ANY
<br />SUCH ITEM SO AS TO MEET INTENT AS DEFINED BY ENGINEER.
<br />UTI LITI ES:
<br />CONTRACTOR WILL SUPPLY INFORMATION AS REQUIRED TO ALL SERVING UTILITIES IN A TIMELY MANNER TO PROVIDE SERVICE REQUIRED.
<br />RSG FITTINGS & CONDUIT:
<br />RGS FITTINGS MUST BE STEEL COMPRESSION TYPE; EACH WITH CODE SIZED COPPER BOND WIRE. MINIMUM CONDUIT 1" C. EXCEPT AS
<br />NOTED. ALL WORK WILL BE IN CONDUIT; COMPLETED SYSTEM REAMED, AND SWABBED PRIOR TO CONDUCTOR INSTALL.
<br />ALL CONDUITS TO BE CONCEALED EXCEPT TO SURFACE MOUNTED PANELS TIE WIRE, PERFORATED STRAPS, OR OTHER PIPING OR
<br />CONDUIT ARE NOT ACCEPTABLE SUPPORTS. NO TIE WIRE WILL BE ALLOWED ON PROJECT.
<br />CALIFORNIA VARIANT - THE LAST 2 FEET (MINIMUM) OF ALL CONDUITS THAT ARE ROUTED TO AND PENETRATE TANK SUMPS, DISPENSER
<br />SUMPS AND VENT TRANSITION SUMPS SHALL BE PVC COATED RIGID STEEL GALVANIZED WHERE PENETRATIONS TO THE BRINE FILLED
<br />SUMPS ARE MADE. ROBROY CONDUIT MUST BE USED WITH THE BRAVO PENETRATION FITTING - NO SUBSTITUTE PERMITTED.
<br />CONDUCTORS:
<br />CONDUCTORS TO BE 60OV., COPPER (98% CONDUCTIVITY). BRANCH CIRCUITS TO HAVE THHN/THWN GAS & OIL RESISTANT INSULATION.
<br />CONDUCTORS WILL BE STRANDED, HYDRAULIC CRIMP ALL CONNECTIONS. CONDUCTOR INSULATION WILL BE CONTINUOUSLY COLOR COATED.
<br />ALL GROUNDING/BUILDING CONDUCTORS WILL BE MULTI -CONDUCTOR TYPE (U.L. LABELED - ROPE STRAND BUILDING WIRE CLASS 'M')
<br />BARE OR INSULATED AS NOTED OR REQUIRED.
<br />MINIMUM LINE VOLTAGE WIRE SIZE IS #12 AWG (STRANDED) FOR LINE VOLTAGE WIRING DEVICES TO BE SPECIFICATION GRADE,
<br />MINIMUM 20 AMPS FOR RECEPTACLES. HUBBELL OR ENGINEER APPROVED. ALL SPECIAL RECEPTACLES AND GROUND FAULT
<br />PROTECTED DEVICES MUST BE PERMANENTLY MARKED WITH ENGRAVED COVER PLATES.
<br />FILL RISER GROUNDING:
<br />ALL RISERS IN THE FILL SUMP SHALL BE GROUNDED AND BONDED.
<br />INSTALL 1/2" x 10'-0" LONG CONTINUOUS COPPER CLAD GROUND ROD IN NATIVE SOIL FOR TANK SYSTEM GROUNDING. PROVIDE
<br />MANHOLE ACCESS TO GROUND ROD AND COPPER GROUND WIRE, SEE DETAILS ON SHEET G.0.7
<br />EMERGENCY SHUTDOWN:
<br />ENSURE THAT THE
<br />E -STOP
<br />DISCONNECTS
<br />THE HOT AND NEUTRAL WIRES TO THE DISPENSERS
<br />ENSURE THAT THE
<br />E -STOP
<br />DISCONNECTS
<br />THE HOT AND NEUTRAL WIRES TO THE TURBINES
<br />ENSURE THAT THE
<br />TURBINE
<br />PUMPS ARE
<br />ISOLATED TO AVOID FEEDBACK VOLTAGE
<br />ENSURE THAT THE
<br />E -STOP
<br />DISCONNECTS
<br />THE LOW VOLTAGE WIRES TO THE DISPENSER (I.E. DATA, INTERCOM, MEDIA)
<br />ENSURE THAT THE
<br />TURBINE
<br />AND DISPENSER BREAKERS ARE CLEARLY IDENTIFIED / LABELED
<br />ENSURE THAT EACH DISPENSER
<br />HAS ITS
<br />OWN DEDICATED CIRCUIT
<br />ENSURE THAT EACH PUMP
<br />HAS ITS OWN
<br />DEDICATED CIRCUIT
<br />ENSURE THAT THE
<br />DISPENSING
<br />EQUIPMENT
<br />IS GROUNDED PER NEC
<br />ENSURE THAT ALL OF THE DISPENSING EQUIPMENT MEETS NEC LOCK OUT/TAG OUT CODES.
<br />CONTRACTOR PERFORMANCE:
<br />THE CONTRACTOR WILL GUARANTEE ALL MATERIALS AND WORKMANSHIP FURNISHED BY HIM UNDER THIS CONTRACTOR FOR A PERIOD OF TWO
<br />YEARS FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK OF THIS CONTRACT BY THE OWNER AND THE ENGINEER AND PROVIDE A BOND TO
<br />VALIDATE THIS GUARANTEE. ANY DEFECTS DEVELOPING WITHIN THE PERIOD TRACEABLE TO MATERIALS OR WORKMANSHIP PERFORMED HERE UNDER,
<br />WILL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOR NOT THE OWNER OR ENGINEER. THE CONTRACTOR WILL ACCEPT AND FULLY
<br />UNDERSTAND THIS PROVISION PRIOR TO CONTRACT BEING AWARDED, AS NO CLAIM FOR EXTRA COMPENSATION WILL BE ALLOWED FOR CORRECTION
<br />OF FAULTY WORK OR DEFECTIVE MATERIALS. ANYTIME DURING THE CONSTRUCTION PERIOD, THE OWNERS REPRESENTATIVES AND THE ENGINEER
<br />RETAIN THE RIGHT TO REQUIRE THE CONTRACTOR TO REMOVE AND REINSTALL ANY EQUIPMENT OR MATERIALS NOT FOLLOWING THE STANDARDS AS
<br />PRESENTED HEREIN OR ON THE DRAWINGS WITHOUT COST TO THE OWNER OR ENGINEER.
<br />CONTRACTOR WILL PROVIDE PROOF OF PERFORMANCE BOND WITH SHOP DRAWINGS
<br />PROVIDE 3 SETS OF SHOP DRAWINGS & SAMPLES FOR ALL EQUIPMENT, PRIOR TO ORDERING AND IN A TIMELY MANNER (AS DETERMINED BY THE
<br />ENGINEER) SO NOT TO DELAY WORK, TO THE ENGINEER FOR APPROVAL. (CONDUIT, SWITCHES, CONDUCTORS, ECT.) WHERE SUBSTITUTIONS ARE
<br />MADE. CONTRACTOR WILL INCLUDE COMPARISON DATA & SAMPLES FOR BOTH THE SUBSTITUTE AND SPECIFIED ITEMS FOR REFERENCE PURPOSES.
<br />CONTRACTOR WILL PROVIDE LETTER TO ENGINEER CONFIRMING ALL EQUIPMENT AND TERMINATIONS ARE PROPERLY TORQUED - SIGNED BY
<br />LICENSED CONTRACTOR.
<br />CONTRACTOR WILL PROVIDE ACCURATE AND COMPLETE "AS BUILT" DRAWINGS TO OWNER AND ENGINEER AT TIME OF OWNER ACCEPTANCE. ALL
<br />"AS BUILT" DRAWINGS TO BE 4 SETS OF "BLUELINES" OR PHOTO COPY PRINTS 24" X 36" AND TWO SETS (OWNER/ENGINEER) ON MAGNETIC
<br />MEDIA & AUTOCAD 2010 (BY AUTODESK) COMPATIBLE. FAILURE TO DO SO WILL CONSTITUTE FORFEITURE OF ALL PAYMENTS DUE AND HOURLY
<br />RATES OR $99.00/HOUR/MAN MINIMUM TO ENGINEER PAID BY CONTRACTOR FOR "AS BUILT" DEVELOPMENT.
<br />CLIENT:
<br />4: bp
<br />'Ad &
<br />lir
<br />ARCO
<br />BP WEST COAST PRODUCTS, LLC
<br />NO.
<br />DATE
<br />DESCRIPTION
<br />0
<br />0
<br />A
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />io
<br />0
<br />SEAL:
<br />FESS /0
<br />Gf-�gp�l
<br />NO. 36475
<br />* XP. 6-30-22
<br />ATF
<br />OF-
<br />z
<br />Lu
<br />2
<br />•
<br />Lu co
<br />co
<br />Qco
<br /><z 00 o
<br />Z
<br />z LU
<br />00
<br />cnrnco
<br />00
<br />UOQ
<br />�QU
<br />Lo
<br />�m>}<
<br />I I w w
<br />v7LL
<br />0 O z o
<br />z U U o
<br />Z
<br /><w
<br />LLJ<
<br />z Q --
<br />06
<br />z 3 t
<br />�
<br />Q
<br />w 00 w
<br />o
<br />0
<br />z =
<br />2 0-
<br />z
<br />g
<br />DEVELOPMENT INFORMATION:
<br />SITE ADDRESS:
<br />ADDRESS
<br />2510 S. STATE HWY 99 W. FRONTAGE ROAD
<br />SAN JOAQUIN COUNTY, CA 95205
<br />DESIGNED BY:
<br />CHECKED BY:
<br />DRAWN BY:
<br />ER
<br />DATE:
<br />PROJECT NO:
<br />10/23/2019
<br />DRAWING TITLE:
<br />TANK AND PIPING
<br />SCOPE OF WORK
<br />AND GENERAL NOTES
<br />(FRP 2 OF 3)
<br />SHEET NO: